Majacraft Suzie User manual

1
majacraft
majacraft
all you need to spin your dreams...
Your new
Suzie
spinning wheel
Professional
Suzie &

2
majacraft
Joiner screws - 25mm (1”)
To aach the rubber joiners on the
conrods to the pedals
Crank screws - M5x20mm (3/4”)
To aach the crank assembly to the
drive wheel
Head bolt - JCB 60mm (2 1/2”)
To clamp the head in the handle
Base bolt - JCB 30mm (1 1/8”)
To hold the base and stem assembly
together
Stop bolt - JCB 25mm (1”)
To limit the movment of the handle
Fastener Details
Welcome to the Majacraft family
Congratulaons on purchasing a new Majacra Suzie or Suzie Professional.
We are very proud of these wheels and hope that it allows you to express your creavity in new and
excing ways. Take me to read through the instrucons before assembly, it really is worth it.
One of our goals is to make our wheels as easy and simple to use as possible, so they become almost
invisible as you express your creavity through bre.
If you were not already aware, we have designed all of our cra tools and accessories to be
compable with each other. If you have an interest in a specic technique, we are likely to have
specialist accessories that will t straight on to this wheel or tools to make creang easy. Talk to your
dealer, visit our web site or email us directly and we will do what we can to help.
Thank you for choosing Majacra, it is your belief in us that drives our innovaon and creavity in
building capvang tools for you.
From the team at Majacra, Good spinning!

3
majacraft
Assembling a Suzie & Suzie Professional
1. Prepare the components
These instrucons demonstrate how to assemble your Majacra Suzie and Suzie Professional
spinning wheel
2. Insert handle stop
We recommend that you nd a clear work area where you can lay out all the components for
working on them.
The following tools are provided by Majacra
- 4mm allen T-wrench
- 3mm allen T-wrench
- 2mm allen T-wrench
You will also need the following tools:
- Posidrive (Philips) screwdriver
Your wheel has been assembled at our workshop; it has been tested; it has been spun on; all screws
have been pre-ed and some have been removed for paral disassembly.
Please unpack with care and retain the packaging. In the box will be:
Required:
1 - M6 25mm JCB (1”) bolt (in the hardware bag)
4mm allen T-wrench
Stem/Handle/Drive wheel assembly
2a 2b
1 Base/Pedal assembly
1 Stem/Handle/Drive wheel assembly (SHDW assembly)
4 Plasc Bobbins
1 Spinning Head
Pulley (1 for Suzie, 2 for Suzie Professional)
Flyer (1 for Suzie, 2 for Suzie Professional)
1 Crank and Conrod assembly
1 Hardware Bag (screws, etc) spare screws are included

4
majacraft
Remove the handle nut and then slide the drive wheel out of the SHDW assembly. Place the handle
and nut to one side. There is a small star washer on the drive sha, take care it does not drop o
when you remove the drive wheel or remain stuck to the black acetyl bush.
Check the star washer is sll on the drive sha. Now slide the drive
wheel and drive sha back into the stem/handle assembly. When
the drive sha is in place then screw the front handle nut on and
ghten it up.
2c 2d
2e
2f
2g
2h
Turn the handle assembly over so the small threaded hole near the handle pivot is on the boom and
posion the handle so it makes a 90 degree angle between the stem and handle. Using the T-wrench,
carefully screw the 25mm JCB bolt in unl it is ght.

5
majacraft
Posion the Base assembly on the at surface. Now
slide the SHDW assembly into the Base assembly
and carefully align the stem holes with the base side
plate holes. Insert the JCB bolts through the holes
and into the SHDW assembly. Parally ghten the
bolts, checking that they are threaded in correctly
before nally ghtening all bolts.
Required:
4 - M6x30mm JCB (1 1/4”) bolts (in the hardware bag)
4mm allen T-wrench
Stem/Handle/Drive wheel assembly
Base/Pedal assembly
3. Attach stem to base assembly
The drive wheel should go on the same side of the Base/Pedal
assembly as the narrow end of the pedals.
3a
3b
3c 3d
3e

6
majacraft
The spinning head can be raised or lowered to suit
the tensioning of the drive belt and the height at
which you wish to spin.
The M6 60mm bolt and wood spacer are aached
to the handle. You must remove it rst. Take the
spinning head and slide it down into the handle.
Push the JCB bolt in a lile way through the hole
in the top of the handle. Align the wooden spacer
tube in the handle so the bolt will can be pushed
through the centre.
Screw the JCB bolt into place without ghtening it
fully. Posion the head near the top of the handle
and then ghten the JCB bolt rmly. There is no
need to over-ghten this.
4d
4. Spinning Head
Required:
1 M6x60mm Gold JCB (2 1/2”) bolt (in the handle
assembly)
4mm allen T-wrench
1 Wood spacer tube (in the handle assembly)
Spinning Head
4a
4b
4c
5. Pulley
Required:
1 - Pulley
2mm allen T-wrench
5a

7
majacraft
6. Drive Band
Required:
1 - Green drive band (in the hardware bag)
The green drive band goes on the grooves on the drive wheel and
then through one of the grooves on the whorl. It is important that
the drive belt is reasonably ght otherwise the treadling will feel
heavy.
6a
6b
When you slide the pulley on the yer sha, it is important that
the grub screw is lined up above the at that has been ground on
the yer sha. When the pulley is correctly aligned, use the allen
key to ghten the grub screw.
5b
5d
5c

8
majacraft
Required:
3 - M5x20mm silver counter-sunk screws
3mm allen T-wrench
7. Crank Assembly
Required:
Posidrive screwdriver
8. Conrods to Pedals
7a
7b
7c
The drive wheel has been predrilled with the holes which line up with the holes on the crank
assembly. Make sure the drive belt is on before starng!
Align the holes on the drive wheel with the holes in
the crank assembly and screw it into place using the
3mm Allen key. It is recommended that you insert
the centre bolt rst. This will reduce your chances of
possibly scratching your drive wheel.
Do not fully ghten the centre bolt unl you have aligned and started screwing in the two bolts on the
sides.
When the three bolts are all in place, you can nish ghtening
them up.
The green joiners have already been put in place in the wooden conrods. Place the wheel in front of
you so the crank and drive wheel are facing you.
We will start with the pedal on your le hand side. Select the conrod that is CLOSEST to YOU. It is on
the end of the curved arm and is aached to the crank assembly with the special right angle rod end
connector. Push the green joiner into the hole at the end of the pedal on your le unl it protrudes by
about 2mm. Screw the 25mm gold screw into the hole on the side of the pedal so it holds the green
joiner in place.

9
majacraft
8e
INCORRECT
CORRECT
8d
8c
8b
8a
Now work on the pedal on your right. Obviously there will only be one available conrod now. The
one that is CLOSEST to the DRIVE WHEEL. Push the green joiner through the hole in the pedal end
into the right hand pedal. It should protrude through the boom of the pedal about 2mm. Check
the alignment of the rod end in the crank assembly as shown in the images below. You may need to
twist the green joiner in the pedal to correct the alignment. When the rod end is aligned correctly -
parallel with the face of the drive wheel - screw the 25mm screw into place. The screw should only
be ghtened unl the head just touches the side of the pedal. DO NOT OVERTIGHTEN!
EXTRA
If you are not certain of the connecon arrangement, here is a
full descripon. Place the wheel directly in front of you so you are
looking at the crank assembly aached to the drive wheel. The
rubber joiner that is on the conrod that is closest to you goes into
the hole in the pedal on your le. The joiner on the conrod that is
furthest from you goes into the hole in the pedal that is on your
right.
8f

10
majacraft
Slip the two brass bobbin bars into the bobbin storage block on
the base assembly.
10b
At this point screw the yer on to the yer sha. It may help to hold the whorl with your le hand
and ghten the yer with your right (assuming you are right handed). It may also be treadled on by
holding the yer in one hand and treadling the wheel in an anclockwise direcon.
Required:
1 - Bobbin
1 - yer
9. Bobbin and Flyer
If you have some petroleum jelly or vaseline, rub a
small smear onto the yer sha. This has already
been done at the factory so is not essenal. Now
slide the bobbin on.
Required:
2 - Bobbin bars (in the hardware bag)
10. Bobbin Bars
9a
9b 9c
10a
If assembling the Suzie Professional, the same process applies for pung on the e-yer.

11
majacraft
Your Majacra Suzie or Suzie Professional is now assembled and you are ready to start on a new
spinning adventure! From the team at Majacra, we wish you great spinning in the future.
At this point, we recommend that you polish your
Suzie or Suzie Professional using Majacra Lavender
Polish or alternavely a standard wood polish. While
not essenal, it will help keep your wheel looking
beauful into the future.
11. Polish
The images contained in this instrucon manual are a guide only. There may be slight dierences
between these and your wheel.
Note
11a

12
majacraft
Notes
suzie_professional assembly_1.06_11-06-2019
This manual suits for next models
1
Other Majacraft Spinning Wheel manuals