Makermade M2 User manual

SETTING UP YOUR
M2 AUTOMATED CUTTING MACHINE KIT
The complete beginner assembly guide by
Last Updated 1.18.2021 v2.0

2
M2 ASSEMBLY GUIDE
SETTING UP YOUR M2
TABLE OF CONTENTS
SECTION 1. Introduction - 3
SECTION 2. Parts Needed - 4
SECTION 3. Assembling the M2 - 7
SECTION 4. Building the Frame - 12
SECTION 5. Calibration and Operation - 21
SECTION 6. Appendices - 36
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

3
M2 ASSEMBLY GUIDE
Thanks for buying the M2 CNC Automated Cutting Machine, welcome to the Maker Made
family! The following instructions are intended for beginners - with no prior CNC experience.
We’ll be releasing an upgrade guide, as well as a paired down guide for experienced users
soon.
Here are some notes on the layout:
1. First off, I’m Drew and I took the lead on creating this guide. My notes are tips and tricks to
help you along. They are in a different font, blue, and look like this:
They are meant to answer some of the “why” questions you might have and give you tips to
get started. We suggest printing the guide in color, if you want a paper copy.
2. Setting up the M2 can be broken down into three main parts: building the M2, building the
frame (or mounting it on an existing Maslow frame), and calibration.
3. Since this guide is aimed at beginners, the calibration section also contains operation
instructions. Then you’ll know the whole process from creating a digital file to cutting it out
on your M2!
If you have experience with the Maslow, the M2’s older brother, you can use your existing
frame! Just follow the steps to build the M2 and skip the part on Easel to learn how to
calibrate with Makerverse.
We hope you enjoy setting up your kit and check out our Resources page for the most
updated version of this setup guide, support, and links to our community. Happy making!
Drew’s Note: Let us know how this guide can be improved for beginners. We love to hear from you!
SECTION 1. INTRODUCTION
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

4
M2 ASSEMBLY GUIDE
This section contains information on what came with your M2 and other tools you will need to building and
operation.
Drew’s Note: Check out the M2 Video Playlist for an overview of what’s in the box and other how to videos!
You’ll have to supply your own router for your M2. Here is the recommended list:
Router Clamp Size Maker Made Tested Community Tested
Bosch Colt 1hp (PR20EVSK) 71mm (included with M2) Yes Yes
Bosch 2.25hp
(1617EVS)
91mm (included in M2 Upgrade
Kit)
Yes Yes
DeWalt 611 1.25hp
(DWP611)
71mm (included with M2) Recommended Yes
DeWalt 618 2.25
(DW618M)
91mm (included in M2 Upgrade
Kit)
Yes Yes
Makita 1.25hp
(RT0701C)
71mm (with 3D printed adapter) Yes Yes
Ridgid 2hp
(R2202)
91mm (included in M2 Upgrade
Kit)
Yes Yes
Ridgid 2hp
(R22002)
91mm (included in M2 Upgrade
Kit)
Yes Yes
Tools needed for building your M2 and frame
(that didn’t come with you kit):
10mm Combo Wrench
13mm Combo Wrench
Phillips Screwdriver/ drill
Hammer
2 Standard Sized Bricks (to that attach to the M2 for cutting)
2 Clamps
Speed Square
Safety Goggles
Level
Tape Measure
The following is what came in your M2 kit!
SECTION 2. PARTS NEEDED
Item
2”x4”x8’ Board
2”x4”x10’ Board
1”x6”x8’ Board
4’x8’x3/4” Plywood or MDF
Quantity
3
1
1
1
Use
Supports
Top Beam
Footer
Wasteboard
Wood required for wall-mounted frame (not
needed if you already have a frame):
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

5
M2 ASSEMBLY GUIDE
DUE v1.2 Control Board, Shield,
and case
10’ MicroUSB to USB cord AC/DC Power Adapter and cord X, Y, and Z Axis Motors
(ETONM) (3)
X, Y, and Z Motor Power Cables
(JST XH 6 pin x2, (JST XH 6 pin
to PH 6 pin x1)
Motor Mounting Brackets (2) Stud Mounts (4) with shock
absorption strip
Ring Carriage
Roller Bearing Carriages (2) Z-Axis Mount L-Brackets (3) Z-Axis Assembly Sled
Router Clamp Roller Bearings (4) Chains 335cm/11’ (2) Dust Collection Elbow
Spring Maker Made Router Bit Starter
Set
Maker Made Sticker, marker,
welcome note, and USB Drive
Bag A
WHAT’S IN THE BOX?
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

6
M2 ASSEMBLY GUIDE
Bag B Bag C Bag D Bag E
Bag F Bag G Bag H Bag Z
Drew’s Note: Listed here are the contents of the bags. In the assembly portion, they will be referred to by their letter and number!
Bag A
A1. Cotter pins (2)
A2. Chain sprocket (2)
A3. Small nails (2)
A4. Large nails (2)
A5. White spacers (2)
Bag B
B1. Quick links (2)
B2. Small screws (4)
B3. Zip ties
Bag C
C1. Brick mounts (2)
C2. Large carriage bolts (4)
C3. Washers (4)
C4 Wingnuts (2)
C5. Locking nuts (2)
Bag D
D1. Shorter black wood screws
D2. Longer silver wood screws
Bag E
E1. Motor sprocket (2)
E2. Grub Screws (2)
E3. Motor screws (8)
E4. Motor washers (8)
E5. 3mm Allen wrench
Bag F
F1. Shoulder bolt (4)
F2. Large washer (8)
F3. Large locking nut (4)
F4. 5mm Allen wrench
Bag G
G1. Tiny wood screws (18)
G2. Small black M3 bolts (6)
G3. Wingnuts (6)
Bag H
H1. Z Motor bracket H2. Large Gear
H3. Grub screws (2) H4. Small Gear
H5. Small grub screws (2)
H6. M4 x16mm bolts (4)
H7. Black M3 x8mm bolts (6)
H8. Belt H9. 2.5mm Allen wrench
H10 2mm Allen wrench
Bag Z
Z1. L-bracket (4)
Z2. M5 x20mm (2)
Z3. M5 x10mm (8)
Z4. M5 T-nuts (8)
Z5. 3mm Allen wrench
Z6. (Alt) 6 screws
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

7
M2 ASSEMBLY GUIDE
The M2 kit comes in several pieces to assemble. It can be split into four main parts: Sled
assembly, attaching belts and motor to Z-Axis Assembly, finishing the M2 assembly, and
centering your router. It will probably take about 1.5 to 2 hours to build.
Drew’s Note: We recommend reading this entire section before beginning.
Check out this video on how to build the M2!
ASSEMBLING YOUR M2
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

8
M2 ASSEMBLY GUIDE
1. Attach three L-brackets to Sled by aligning with six small
predrilled holes, tall side toward center, using Phillips
screwdriver and G1 screws.
2. Attach three L-brackets to rectangular brackets on ring
carriage, with the tall side closest to the middle. Insert G2 bolts
from inside of ring bracket out through L-brackets, two per
bracket and secure with G3 wingnuts.
3. Hang a roller bearing carriage on each side of attached ring
carriage.
4. Assemble both roller bearing carriages by feeding F1 bolt
through larger carriage hole, then F2 washer, then bearing, then
F2 washer, out through the other end of the carriage, and attach
with F3 nut. Use F4 Allen wrench on one end and 13mm combo
wrench on the other to tighten.
5. Peal off protective paper from acrylic dust cover (if applied). 6. Attach both C1 brick mounts by inserting C2 bolt from bottom
of the left and right of the sled, with C3 washer and C4 wingnuts.
Repeat on other side with C5 nut using 10mm combo wrench.
M2 ASSEMBLY PART 1: SLED ASSEMBLY (BAG C, BAG F, BAG G)
Shoulder
bolt
Ring
bearing
Washer
Washer
Nut
TOP VIEW SIDE VIEW
Drew’s Note: You can install
the bricks in this step, but
another, easier option is to
attach the bricks to the sled
after you have hung the M2
from the chains in the center of
your wasteboard.
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

9
M2 ASSEMBLY GUIDE
1. Attach H1 Z motor bracket, but do not fully tighten (will
tighten fully in Step 6), using H6 bolts and H9 Allen Wrench.
2. Attach Z motor to H1, with the motor shaft in the slot farthest
from assembly, rotated with it’s bottom plug also toward the
outside. Use H7 bolts and H9 Allen Wrench.
3. Attach H2 large gear to motor, just above shaft base, ensuring
one H3 large grub screw is on flat side of motor shaft. Attach
with H3 grub screws (also called set screws) using H9 Allen
Wrench.
4. Line up small H4 Z-axis gear on lead screw, flush with gears on
H3, tighten with 2 smaller H5 grub screws using smaller H10 Allen
Wrench.
5. Loop H8 belt around gears, ensuring belt is level between
gears.
6. Tighten belt by gripping Z-axis motor and pulling toward
yourself until the belt is very tight. Use your other hand to
tighten the Z motor bracket with H9 Allen wrench.
M2 ASSEMBLY PART 2: ATTACH BELTS AND MOTOR TO Z-AXIS ASSEMBLY (BAG H)
Drew’s Note: Be sure that your
belt is tight! If the belt is loose,
your M2 will not move properly.
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

10
M2 ASSEMBLY GUIDE
Drew’s Note: The Z-Axis Assembly attaches to the sled with
T-nuts. They are marvels of engineering that are specially
designed to turn sideways when being tightened. This fastens
parts to aluminum extrusions at different angles. Sometimes, you
have to loosen and retighten them to get them to turn.
1. Mount Z-Axis assembly to sled by aligning extrusion “legs”
with the two rail “feet” that are already attached to the sled.
2. Pop the caps off the end of the rail feet. Line up leg extrusions,
with bottom bolt sticking out, about 2mm. Slide the extrusion
legs onto the rail feet until it threaded holes line up on the side.
3. Insert longer Z2 bolts into holes on each side to secure.
Tighten using Z5 Allen Wrench.
4. Attach four Z1 L-brackets to each side of the extrusion legs.
Ensure that they turn sideways and lock the L-bracket in place.
Use two Z4 T-Nuts and shorter Z3 bolts per bracket using Z5 Allen
wrench. Replace the end caps.
5. Attach router clamp to Z-Axis Assembly using the bolts that
are screwed into clamp. Unscrew them and attach the clamp to
the Z-Axis Assembly as shown with Z5 Allen Wrench.
M2 ASSEMBLY PART 3B: FINISH M2 Z-AXIS ASSEMBLY (BAG Z)
Rail Foot Extrusion Leg
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

11
M2 ASSEMBLY GUIDE
1. Attach router bit to router, insert into router clamp, and
tighten clamp with Z5 Allen Wrench.
2. Loosen bottom T-nuts with Phillips screwdriver and move sled
back and forth until router bit is aligned with exact center of M2
sled hole.
3. Tighten T-nuts on bottom and ensure they turned by popping
off the end caps on the rail feet. You can look down the rail and
see them turned. Replace the caps.
4. Check all of the bolts and T-nuts on your Z-Axis Assembly.
During shipping and use, bolts can vibrate loose. Pay special
attention to the grub screws that hold the Z-axis bearings in
place on the top and bottom of the lead screw.
5. The Z-axis motor power cable (the longest one) plugs into the
motor by pulling the cord up from under the waste board to keep
it out of the way while cutting.
6. Attach PVC dust collection elbow under Z-axis motor after you
plug in the motor power cable.
M2 ASSEMBLY PART 4: CENTERING YOUR ROUTER AND FINAL STEPS
Drew’s Note: It’s supposed
to be a snug fit to keep scraps
from flying everywhere.
Check out our M2 Resources
and Maker Marketplace for
dust collection ideas!
Drew’s Note: It’s very important
that the router bit is in the
exact center of M2 hole! All of
the triangulation math for the
M2’s GRBL code is based of the
assumption that your bit is in the
exact center. If it is off, even by a
few millimeters, it will result in your
M2 cutting incorrectly.
Drew’s Note: Use enclosed
zip ties for cord maintenance!
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

12
M2 ASSEMBLY GUIDE
BUILDING YOUR FRAME
This Section is how to build your frame for your M2. It is split into six main sections: Building the wasteboard, building the
top beam, leveling your frame and attaching your material, mounting the chains, mounting your M2, and connecting your DUE
board.
Drew’s Note: We recommend reading this entire section before beginning.
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

13
M2 ASSEMBLY GUIDE
The next step to starting your M2 CNC adventure is to build the frame that will hold your material and the M2
while it cuts. The M2 mounts for your frame are included, but you will need to purchase the following from a local
hardware store to build the standard 4’x8’ frame. If you already have a Maslow frame, you’re good to go!
Wood needed:
BUILDING YOUR FRAME PART 1: WASTEBOARD (BAG D)
Item
2”x4”x8’ Board
2”x4”x10’ Board
1”x6”x8’ Board
4’x8’x3/4” Plywood or MDF
Quantity
3
1
1
1
Use
Frame Legs and Support
Top Beam
Footer
Wasteboard
The Frame has 2 main parts: The top beam that holds the motors, and the wasteboard that you clamp or screw
the material that you are cutting to.
Drew’s Note: The size of material the M2 can cut is only limited by the chain length. These instructions are based on the chain
included with your M2 and will walk you through how to set up your kit to cut material almost to the edge of the 4x8’ space. These
instructions are based on attaching the Top Beam to a wall. If you are interested in a different frame size or design, check out our
M2 Resources page or the Owners group on Facebook for help!
1. To build the wasteboard, cut the (2) 2” x 4” x 8’ boards in half to make the four legs.
2. Line all four boards up and measure up 12” from bottom. Use a speed square to draw a line.
3. Place the 1” x 6” x 8’ footer board across the legs, underneath the 12” line. Arrange the legs with one on each
end and two spaced out in the middle. Attach the footer to the four legs with D1 screws underneath line. This will
ensure your wasteboard is 12” from the ground.
Drew’s Note: Use a speed square to attach legs in straight lines, it’s very important that this is square!
Drew’s Note: The four most important things to keep in mind when building the frame are:
1. The bottom of your wasteboard should be 12” from the bottom of your legs.
2. The wasteboard should be clamped or screwed onto the stud mounts, to maintain a 15 degree angle.
3. The target distance of the motor offset (from where the chain leaves the motor sprockets to the top of the
wasteboard) should be at least 18” for a 4’x8’ frame.
4. Your top beam and wasteboard must be level and equal distance from each other.
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
Footer
Legs
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

14
M2 ASSEMBLY GUIDE
BUILDING YOUR FRAME PART 1: BUILDING THE WASTEBOARD (BAG D)
4. Set the 4’x8’ Wasteboard on the footer. Attach to legs with D2 screws. This will help to flatten your wasteboard
for smother cuts.
5. Place last 2” x 4” x 8’ support board across the top of the legs. Attach with D2 screws to top of legs. Screw
wasteboard into support, to help keep your wasteboard flat.
92 "
Step 1: Attach Stud Mounts to wall
65 3
4" up from floor
(a) Find stud and attach
first Stud Mount using 2pcs
long wood screws in Bag D
(b) Attach Stud Mount
using 2 drywall anchors
and 2pcs long wood
screws in Bag D
Step 2: Mount Top Beam to Stud Mounts on wall
ASSEMBLY GUIDE
Use 8pcs short wood screws in Bag D to attach top beam
Step 3: Attach last two Stud Mounts
146mm [5.75in]
146mm [5.75in]
Stud Mounts directly below
first Stud Mounts
6. Two of the stud mounts will hold your wasteboard at the top corners, so it rests at a 15 degree
angle when you’re cutting (with the largest end closest to the ground). Find two studs in your wall
that are 8’ apart and mark them. Then, lean the wasteboard against the wall and align one of the
studs close to the edge. Hold the stud mount between the wall and the leaning wasteboard and
mark the top hole of the stud mount. Attach it to the stud in the wall using D2 screws.
92 "
Step 1: Attach Stud Mounts to wall
65 3
4" up from floor
(a) Find stud and attach
first Stud Mount using 2pcs
long wood screws in Bag D
(b) Attach Stud Mount
using 2 drywall anchors
and 2pcs long wood
screws in Bag D
Step 2: Mount Top Beam to Stud Mounts on wall
ASSEMBLY GUIDE
Use 8pcs short wood screws in Bag D to attach top beam
Step 3: Attach last two Stud Mounts
146mm [5.75in]
146mm [5.75in]
Stud Mounts directly below
first Stud Mounts
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
Front view of wasteboard
Side view of wasteboard
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
Back view of wasteboard
Support
Wasteboard
Drew’s Note: The bottom of the stud mounts will be
about 53” from the ground. This is an x-ray example
of the wasteboard with the mounts attached to the
studs, they might not be right on the edge.
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

15
M2 ASSEMBLY GUIDE
4. Attach the motor mounts on each edge of the top
beam, flush with the ends. Use one D1 screw on front
and four on top.
5. Place motor in left bracket, with cylindrical end
toward center. Slide lock E4 washers over E3 screws
and fasten screws through the front of the motor with a
Phillips Screwdriver.
6. Attach E1 motor sprocket by inserting the E2 grub
screw into the gear hole, aligning with the flat side of
the motor shaft, and tightening with E5 Allen wrench to
prevent slipping.
7. Repeat steps 5 and 6 to mount the motor on right
side.
1. Measure the distance from the ground to the bottom of the stud mount. Attach the other wasteboard stud
mount to the stud on the opposite side at the exact same height.
2. Lean your wasteboard against the stud mounts and arrange it until it is level across the top. Clamp the
wasteboard to the stud mounts and mark 10” up from the top of your wasteboard on the wall above each
stud mount. This will be where the bottom of the top beam stud mounts will attach to the wall and ensure the
required 18” distance between your wasteboard top edge and the top of the to be installed motor sprockets.
3. Measure and mark the exact middle of the 10’ top beam. Repeat on your wasteboard. Then measure how far
the wasteboard stud mounts are from its center. Mark the equal distance on your top beam, to ensure your top
beam will be centered with your wasteboard. Attach the stud mounts to the 10’ top beam with D1 screws and
a speed square. Ensure that they are the same distance up from the bottom of your beam, and the larger end is
placed to be closest to the ground. Pilot holes that are 0.5” from the bottom edge can help.
BUILDING YOUR FRAME PART 2: BUILDING THE TOP BEAM AND ADDING THE X/Y MOTORS (BAG D, BAG E)
92 "
Step 1: Attach Stud Mounts to wall
65 3
4" up from floor
(a) Find stud and attach
first Stud Mount using 2pcs
long wood screws in Bag D
(b) Attach Stud Mount
using 2 drywall anchors
and 2pcs long wood
screws in Bag D
Step 2: Mount Top Beam to Stud Mounts on wall
ASSEMBLY GUIDE
Use 8pcs short wood screws in Bag D to attach top beam
Step 3: Attach last two Stud Mounts
146mm [5.75in]
146mm [5.75in]
Stud Mounts directly below
first Stud Mounts
92 "
Step 1: Attach Stud Mounts to wall
65 3
4" up from floor
(a) Find stud and attach
first Stud Mount using 2pcs
long wood screws in Bag D
(b) Attach Stud Mount
using 2 drywall anchors
and 2pcs long wood
screws in Bag D
Step 2: Mount Top Beam to Stud Mounts on wall
ASSEMBLY GUIDE
Use 8pcs short wood screws in Bag D to attach top beam
Step 3: Attach last two Stud Mounts
146mm [5.75in]
146mm [5.75in]
Stud Mounts directly below
first Stud Mounts
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

16
M2 ASSEMBLY GUIDE
2. The material you are cutting will need to by clamped to the wasteboard stud mounts or screwed into the
wasteboard. We recommend both clamping at the top and screwing in at the bottom to prevent warping.
If you want to screw your wasteboard to the wall and not use clamps, mark on your level wasteboard where it
rests on the stud mounts. Remove the wasteboard stud mounts from the wall, and attach using those guide
marks. Reattach to the wall into the same top holes you measured in the last section. Double check that your
wasteboard is level, and adjust as needed.
Drew’s Note: Always clamp or screw the material you’re cutting to the Wasteboard Stud Mounts so it doesn’t
move.
BUILDING YOUR FRAME PART 3: LEVELING YOUR FRAME AND ATTACHING YOUR MATERIAL
1. Mount the top beam to the wall using your guide marks from Step Two and ensure that it is level. To mount,
line up the bottom of the stud mounts with the wall marks you made. Only screw one D2 screw into the top of
one side. Level your top beam by holding the other side against the wall, using your 10” mark as a guide. Hold
a level against the top edge, and screw in the top of other side when it’s level. Screw in the bottom of the stud
mounts.
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
ASSEMBLY GUIDE CONT.
Step 4: Attach Footer to Legs
304.8mm [12in]
228.6mm [9in] 2X 228.6mm [9in]
Step 5: Attach Wasteboard to Legs
6pcs long wood
screws in Bag D
63.5mm [2.5in]
4pcs long wood
screws in Bag D
38.1mm [1.5in]
165.1mm [6.5in]
Rest Wasteboard
on Footer
Drew’s Note: Double check
that the top beam and
wasteboard are level with
each other, the same distance
apart, and the centers
are aligned! Even a tiny
difference will throw off your
calibration.
92 "
Step 1: Attach Stud Mounts to wall
65 3
4" up from floor
(a) Find stud and attach
first Stud Mount using 2pcs
long wood screws in Bag D
(b) Attach Stud Mount
using 2 drywall anchors
and 2pcs long wood
screws in Bag D
Step 2: Mount Top Beam to Stud Mounts on wall
ASSEMBLY GUIDE
Use 8pcs short wood screws in Bag D to attach top beam
Step 3: Attach last two Stud Mounts
146mm [5.75in]
146mm [5.75in]
Stud Mounts directly below
first Stud Mounts
92 "
Step 1: Attach Stud Mounts to wall
65 3
4" up from floor
(a) Find stud and attach
first Stud Mount using 2pcs
long wood screws in Bag D
(b) Attach Stud Mount
using 2 drywall anchors
and 2pcs long wood
screws in Bag D
Step 2: Mount Top Beam to Stud Mounts on wall
ASSEMBLY GUIDE
Use 8pcs short wood screws in Bag D to attach top beam
Step 3: Attach last two Stud Mounts
146mm [5.75in]
146mm [5.75in]
Stud Mounts directly below
first Stud Mounts
92 "
Step 1: Attach Stud Mounts to wall
65 3
4" up from floor
(a) Find stud and attach
first Stud Mount using 2pcs
long wood screws in Bag D
(b) Attach Stud Mount
using 2 drywall anchors
and 2pcs long wood
screws in Bag D
Step 2: Mount Top Beam to Stud Mounts on wall
ASSEMBLY GUIDE
Use 8pcs short wood screws in Bag D to attach top beam
Step 3: Attach last two Stud Mounts
146mm [5.75in]
146mm [5.75in]
Stud Mounts directly below
first Stud Mounts
92 "
Step 1: Attach Stud Mounts to wall
65 3
4" up from floor
(a) Find stud and attach
first Stud Mount using 2pcs
long wood screws in Bag D
(b) Attach Stud Mount
using 2 drywall anchors
and 2pcs long wood
screws in Bag D
Step 2: Mount Top Beam to Stud Mounts on wall
ASSEMBLY GUIDE
Use 8pcs short wood screws in Bag D to attach top beam
Step 3: Attach last two Stud Mounts
146mm [5.75in]
146mm [5.75in]
Stud Mounts directly below
first Stud Mounts
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

17
M2 ASSEMBLY GUIDE
M2 ASSEMBLY PART 4: MOUNT CHAINS TO FRAME (BAG A AND BAG B)
1. On left side of top beam, measure 6” (35cm) toward center and
1” (2.5cm) from the top or bottom. Insert small A3 nail through
loop in last chain link and hammer into that spot. Repeat process
on right side, with either both on the top or bottom.
2. Drape chains over the E1 motor sprockets, so they can loop
toward the center as shown.
3. Measure about 31” (78cm) on right side chain from nail toward
center of top beam. Place A2 sprocket in loop and attach B1
quick Link, with opening facing out. Repeat process on left side.
4. On right side, attach spring and tighten quick link, with link nut
facing away from beam.
Drew’s Note: We recommend a friend help connect the spring and each person
wear safety goggles during stretching. The chain can snap back causing damage to
people and surroundings!
The M2 moves in the X and Y position by using chains connected to the motors. This
guide is how to install the chains that came with your M2 on a standard 4’x8’ frame
with a 10’ Top Beam. The most important part is that the spring keeps tension on
the chains. We use nails to connect the chain, so if something goes awry, only the
nails will be removed without damaging your frame.
Also, the large nail and spacer (A4 and 5) are extra parts for custom frame designs!
5. Stretch out the spring from the right side to attach the other
end to the open quick link on left side. Tighten quick links.
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

18
M2 ASSEMBLY GUIDE
M2 ASSEMBLY PART 5: ATTACH M2 TO FRAME
ROLLER BEARING CARRIAGE ROLLER BEARING CARRIAGE
1. Hold M2 sled against the wasteboard near the right chain.
Hold it against the frame with your body weight or have a friend
help by holding it for you.
2. Take the loose end of one chain and thread through hole in
the roller bearing carriage built in Part 1. Insert A1 cotter pin to
into second to last chain link to attach.
3. Move M2 to center of Wasteboard and have a friend pull the tension on the opposite chain to around 20” from the nail to the
spring. You can pull the chain away from the motor sprocket, pull for more length, and set it back to for the tension to hold, but
beware of it pulling! When you have enough slack in the chain, thread through the opposite roller bearing carriage and attach with
the other A1 cotter pin into second to last chain link.
Drew’s Note: We recommend wearing safety goggles and having a friend help mount the sled to the frame. The chain can
slip off the sprockets, causing the spring to snap and hurt people, pets, and surroundings. It’s also important to insert the
cotter pin into the second to last link, for extra safety of the chain attachment, as shown below.
Drew’s Note: Let go of the sled and
it should rest against plywood or
MDF. Your M2 is ready to calibrate!
(Also, don’t forget to attach your
bricks, if you waited until it was
mounted).
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

19
M2 ASSEMBLY GUIDE
1. Using included B2 screws, mount the control board in its case to the wall behind Wasteboard, helps to mount
in middle for motor wires to reach.
Drew’s Note: If you’re mounting without case or need to modify for any reason, this is how to attach the top Control Shield to
bottom DUE board. Line up the pins as shown and be careful they don’t bend
BUILDING YOUR FRAME PART 6: MOUNT AND CONNECT ARDUINO DUE BOARD AND SHIELD
Drew’s Note: The M2’s brain is an Arduino DUE microcontroller. We recommend mounting the DUE to the wall behind your
Wasteboard, but it can be mounted in any safe location where it won’t be stepped on or conflict with the M2 during operation.
With case, wire plugs on bottom.
Bottom DUE board, without case (notice how the
“DUE” written on the board is up). That is the
orientation for this instruction, the bottom power
is unused.
Pin Alignment Bottom View Top View
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0

20
M2 ASSEMBLY GUIDE
Power
Drew’s Note: If your case looks like this above one, it may need to
be modified. Note the small power port. You will have to plug in
the power with the top of the case off, or cut the hole larger. We
apologize for this mistake and it will be fixed in later versions.
3. Right Motor1. Left Motor 2. Z-Motor
(Longest cord,
will connect to M2)
Future
J Tech Laser
Connection
1. 2. 3.
Power
Correct
MicroUSB port
Example of connection
not fully seated!
Right/Left (X/Y) Motors
Drew’s Note: The X and Y motors move the M2 back and forth
on the frame. If one of your motors of your M2 doesn’t move
during operation, or the M2 generally moves in a strange
direction, the first thing to check are the motor connections.
If the wires connecting the X, Y, and Z motors are loose, even a
tiny bit, it will cause your M2 to malfunction.
BUILDING YOUR FRAME PART 5: MOUNT ARDUINO DUE BOARD AND SHIELD
2. Plug in wires, USB, and power. The six-pin motor wires go to the motors, using the following
diagrams. Connections will only seat in one direction. Ensure connections are secure and use one of
the shorter blue wires. Use B3 zip ties for cord maintenance.
Drew’s Note: A high-pitched whine is normal! That means your DUE board is receiving power. It will get louder when
connected to a computer. The following steps will explain where the other ends of the cords go.
This work is licensed under the creative commons Attribution
Non Commercial-No Derivatives 4.0 International license. Last Updated 1.18.2021
Version 2.0
Other manuals for M2
3
Table of contents
Other Makermade Cutter manuals