
PRECISION BUSHING INSTALLATION
For Tombstone, Pyramid and Dual Right Angle mounts
1. Slide precision bushings into counter-bored threaded holes
2. Bushings are a slide fit for easy installation and removal
3. Place DynoLock base over installed bushings
4. Insert M10 socket head cap screw
5. Tighten M10 socket head cap screw with M8 hex wrench clockwise until tight
• Torque M10 socket head cap screw to 87 Nm or 64 ft-lb
For Riser mounts only
1. Combine precision bushings with M10 socket head cap screw (see figure at right)
2. Bushings are a press fit for better accuracy
3. Insert into appropriate counter-bored threaded holes
4. Turn clockwise with hand held hex wrench to seat the bushing in to the DynoMount body
5. Stop when bushing and M10 socket head cap screw reach a positive stop
• CAUTION: DO NOT over-tighten
6. Repeat in all four holes — all bushings are now installed
7. Remove M10 socket head cap screw and set aside
8. Position appropriate DynoLock base over bushings, seat and then re-insert cap screws
9. Tighten M10 socket head cap screw with M8 hex wrench clockwise until tight
• Torque M10 socket head cap screw to 87 Nm or 64 ft-lb
For Risers Only
The bushing has a light press to allow
for better accuracy. The bushing is not
removable after installation.