
Single Phase
EV Charger Protection unit
3 | P a g e
within the enclosure. The cover must not be removed until the
supply to the unit h s been isol ted or disconnected.
Pro uct Description
The m tt:e Single Phase Electric Vehicle Charger Protection units (SP-EVCP-
T&R) are esigne for use in omestic welling applications where single
phase PME supplies are fee ing Electric Vehicle Chargers. They shoul NOT
be use on premises with 3 phase supplies
This manual covers the SP-EVCP-T & SP-EVCP-R
The units are not inten e for any purpose other than that efine within
this ocument.
WARNINGS
Please rea an observe the following notices carefully. These warnings must
be observe when installing an operating the Electric Vehicle Charger
Protection units.
All relev nt supplies must be isol ted or disconnected before commencing ny
work. This product must be inst lled by competent person in ccord nce with
the IEE Wiring Regul tions, BS7671 (18
th
Edition or l ter) nd ny relev nt Building
Regul tions nd/or Inst ll tion Regul tions.
S fety Advice
The unit must be inst lled in dry ventil ted loc tion; it must never be covered or
h ve restricted ventil tion.
The SP-EVCP-R nd SP-EVCP-T units re r ted for m ximum 32A.
For any information not containe within this ocument, please contact our