MerCs Strider M4 V2 Series User manual

1
02 4047 0777 www.mercs.com.au02 4047 0788
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
Two pulse output indicates real time energy measurement. An RS485 outp ut allows remote monitoring from another display or a computer.
The Unit can measure and display: The unit has password protected set up screens for:
Unit Characteristics
• Line voltage and THD% (total harmonic distortion) of all phases
• Line Frequency
• Currents, Current demands and current THD% of all phases
• Power, maximum power demand and power factor
• Active energy imported and exported
• Reactive energy imported and exported
• Changing password
• Supply system selection 1p2w, 3p3w, 3 p 4w
• Demand Interval time
• Reset for demand measurements
• Pulse output duration
User Manual
IntroductionApplications
Features
The unit measures and displays the characteristics of single phase two wires (1p2w), three phase
three wires (3p3w,) and three phase four wires (3p4w) supplies, including voltage, frequency,
current, power ,active and reactive energy, imported or exported. Energy is measured in terms
of kWh, kvarh. Maximum demand current can be measured over preset periods of up to 60min-
utes. In order to measure energy, the unit requires voltage and current inputs in addition to the
supply required to power the product. The requisite current input(s) are obtained via current
transformers (CT). This meter can be congured to work with a wide range of CTs, giving the unit
a wide range of applications. Built-in interfaces provides pulse and RS485 Modbus RTU outputs.
Conguration is password protected. This unit can be powered from a separate auxiliary (AC or
DC) supply. Alternatively it can be powered from the monitored supply, where appropriate.
Strider M4 V2
Multi-Function Energy Meter
ME-PM-M4-5
• Measures kWh Kvarh, KW, Kvar, KVA, P, F, PF, Hz, dmd, V, A, THD, etc.
• • Bi-directional measurement IMP & EXP
• • Two pulse outputs
• • RS485 Modbus
• • Din rail mounting 35mm
• • 1/5A CT connection
• • Accuracy Class 0.5s
• Main Switchboards
• Control Panels
• Sub Circuits
• Air Conditioning Systems
• Solar panel installations

02 4047 0777 www.mercs.com.au02 4047 0788 2
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
1 2 3
The rst screen lights up all display seg-
ments and can be used as a display check. Software version information The interface performs a self-test and
indicates the result if the test passes.
1 2 3 4
Selects the Voltage and
Current display screens. In
Set-up Mode, this is the “Left”
or “Back” button.
Select the Frequency and
Power factor display screens. In
Set-up Mode, this is
the “Up” button.
Select the Power display
screens. In Setup Mode, this is
the “Down” button.
Select the Energy display
screens. In Setup mode, this is
the “Enter” or “Right” button.
Start-up Screens
Measurements
The buttons operate as follows:
*After a short delay, the screen will display active energy measurements.
Current Transformer Primary Current
RS485 Serial Modbus RTU Pulse output
Strider M4 V2 Series is CT operated. you will need to set the correct ratio.
As an example: If using 100/5A CT, you will need to insure CT2 (Secondary) is set to 5 and CT rate is 0020. You divide
the primary by the secondary to get the CT rate to be entered (100/5=20).
This uses an RS485 serial port with Modbus RTU protocol to provide a
means of remotely monitoring and controlling the Unit.
Set up screens are provided for setting up the RS485 port.
This provides two pulse outputs that cloc k up measured active
and reactive energy. The constant for active energy is 3200imp/k
W h (Terminals 11& 12). The pulse width for pulse 1(Terminals 9&10)
can be set from the s et up menu.
C1C2
U/I
ESC MPE

02 4047 0777 www.mercs.com.au02 4047 0788 3
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
Voltage and Current
Each successive press of the button selects a new parameter:
Phase to neutral voltages
Current on each phase.
Phase to neutral voltage THD%.
Current THD% for each phase.
U/I
ESC
1 2 3 4
Frequency and Power Factor
(total) Power Factor of each phase Maximum Power Demand Maximum Current Demand
Frequency and Power Factor and Demand
Each successive pressing of the button selects a new range:
M

02 4047 0777 www.mercs.com.au02 4047 0788 4
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
1 -1 Import active energy in kWh
1-2 Export active energy in kWh
2-1 Import reactive energy in kVArh
2-2 Export reactive energy in kVArh
Energy Measurements
Each successive pressing of the button selects a new range:
1 2 3 4
Instantaneous Active Power
in kW
Instantaneous Reactive
Power in kVAr
Instantaneous Volt-Amps
in KVA Total kW, kVArh, kVA
Power
Each successive pressing of the button selects a new range:
P
E

02 4047 0777 www.mercs.com.au02 4047 0788 5
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
3 -1 Total active energy in kWh
3-2 Total reactive energy in kVArh
Setting Up
To enter set-up mode, pressing the button for 3 seconds, until the password screen appears.
Setting up is password-protected so you must enter the correct password (default ‘1000’) before processing. If an incorrect password is entered, the
display will show: PASS Err
To exit setting-up mode, press repeatedly until the measurement screen is restored.
E
U/I
ESC
Set-up Entry Methods
Some menu items, such as password and CT, require a four-digit number entry while others, such as supply system, require selection from a number
of menu options.

02 4047 0777 www.mercs.com.au02 4047 0788 6
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
Menu Option Selection
1. Use the and buttons to select the required item from the menu . Selection does not roll over between bottom and top of list
2. Press to conrm your selection
3. If an item ashes, then it can be ad justed by the and buttons. If not, there maybe a further layer.
4. Having selected an option from the current layer, press to conrm your selection. The SET indicator will appear.
6. On completion of all setting up, press repeatedly until the measurement screen is restored.
5. Having completed a parameter setting, press to return to a high er menu level. The SET indicator will be removed and you will be able
to use the and buttons for further menu selection.
E
MP
MP
E
U/I
ESC
U/I
ESC
MP
When setting up the unit , some screens require the entering of a number. In particular, on entry to the setting up section, a password must be
entered. Digits are set individually, from left to right. The procedure is as follows:
1. The current digit to be set ashes and is set using the and buttons.
2. Press to conrm each digit setting. The SET indicator appears after the last digit has been set.
3. After setting the last digit, press to exit the number setting routine. The SET indicator will be removed.
Number Entry Procedure
MP
E
U/I
ESC
Change Password
1Use the and to choose the change pass-
word option.
2-1
Press the to enter the change password routine.
The new password screen will appear with the rst
digit ashing
MP
E

02 4047 0777 www.mercs.com.au02 4047 0788 7
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
2-2
Use and to set the rst digit and
press to conrm your selection. The next
digit will ash.
2-3 Repeat the procedure for the remaining three digits.
2-4 After setting the last digit, SET will show.
MP
E
Press to exit the number setting routine and return to the Set-up menu. SET will be removed
U/I
ESC

02 4047 0777 www.mercs.com.au02 4047 0788 8
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
DIT Demand Integration Time
This sets the period in minutes over which the current and power readings are integrated for maximum demand measurement. The options are: o,
5, 8, 10, 15 20, 30, 60 minutes
1
From the set up menu, use and buttons
to select the DIT option. The screen will show the cur-
rently selected integration time.
2-1 Press to enter the selection routine. The cur-
rent time interval will ash
2-2 Use and buttons to select the time
required.
2-3 Press to conrm the selection.
SET indicator will appear.
M
M
P
P
E
E

02 4047 0777 www.mercs.com.au02 4047 0788 9
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
Supply System
This Unit has a default setting of 3 Phase 4 wire (3P4).
Use this section to set the type of power supply being monitored.
From the Set Set-up menu, use and
buttons to select the System option. The screen will
show the currently selected power supply supply.
Press to enter the selection routine. The cur-
rent selection will ash
Use and buttons to select the required
system option: 1P21P2(W),3P33P3(W) ,3P43P4(W)
Press to conrm the selection. SET indicator
will appear.
MP
E
MP
E
Press to exit the system selection routine and return to the menu. SET will disappear and you will be returned to the main Set Set-up Menu
U/I
ESC

02 4047 0777 www.mercs.com.au02 4047 0788 10
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
From the Set Set-up menu, use and
buttons to select the CT option.
Secondary CT setting
Press to enter the CT secondary current
selection routine. routine.:5A/1A
Set CT Ratio value
Press to enter the CT Ratio setting screen. The
range is from 0001 to 9999.
MP
E
E
CT Settings
The CT option sets the secondary current (CT2 1A or 5A) of the current transformer (CT) that wires to the meter.
For example, if using a 100/5A current transformer you will enter 0020, as you need to divide the primary by the secondary to get the ratio
(CT rate).
* Please note for the MID approved version device,you will only have one opportunity to set the ratio.
From the Set Set-up menu, use and
buttons to select the CT option.
MP
PT Settings
The PT option sets the secondary voltage (PT2 100 to 500V) of the Voltage transformer (PT) that wires to the meter.

02 4047 0777 www.mercs.com.au02 4047 0788 11
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
For example,
if set the ratio to be 100,it means the primary voltage equals secondary voltage x 100
From the Set up menu, use and buttons
to select the Pulse output option.
Press to enter the selection routine. The unit
symbol will ash.
Use and buttons to choose kWh or kV
A rh.
MP
Pulse output
This option allows you to congure the pulse output. The output can be set to provide a pulse for a dened amount of energy active or reactive.
Use this section to set up the pulse output - Units: Total kW h , Total kV A rh
Secondary CT setting
Press to enter the CT secondary current
selection routine. routine.:5A/1A
Set CT Ratio value
Press to enter the CT Ratio setting screen. The
range is from 0001 to 9999.
E
E
E
MP
E
On completion of the entry procedure, press to conrm the setting and press to return to the main set up menu.
U/I
ESC

02 4047 0777 www.mercs.com.au02 4047 0788 12
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
From the Set up menu, use and buttons
to select the Pulse Rate option.
Press to enter the selection routine. The cur-
rent setting will ash. 0.01/0.1/1/10/100/1000 kWh/
kV A rh per pulse
E
E
M
M
P
P
Use and buttons to choose pulse rate. On Completion of the entry procedure, press to conrm the setting and press to
return to the main set up menu.
U/I
ESC
Pulse rate
Use this to set the energy represented by each pulse. Rate can be set to 1 pulse per 0.01kWh/0.1kWh/1kWh/10kWh/100/1000 kWh.
(It shows 1 impulse = 10kWh/kVArh)
Pulse Duration
The energy monitored can be active or reactive and the pulse width can be 200, 100 or 60ms.
(It shows pulse wid th of 200ms)

02 4047 0777 www.mercs.com.au02 4047 0788 13
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
From the Set up menu, use and buttons
to select the Pulse width option.
Press to enter the selection routine. The current
setting will ash.
Use and buttons to choose pulse width.
E
E
M
M
P
P
On completion of the entry procedure , press to conrm the setting and press to return to the main set up menu.
U/I
ESC
RS485 Address
Communication
There is a RS485 port can be used for communication using Modbus RTU protocol. For Modbus RTU, parameters are selected from Front panel.
(The range is from 001 to 247)
From the Set up menu, use and buttons
to select the Address ID
Press button to enter the selection routine. The
current setting will be ashing.
E
MP

02 4047 0777 www.mercs.com.au02 4047 0788 14
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
Use and buttons to choose Modbus Ad-
dress(001 to 247)
Primary address:001 to 250
Use and buttons to select the address
value
Press button to enter the selection routine. The
current setting will be ashing.
Secondary address: 00 00 00 01 to 99 99 99 99
E
M
M
P
P
On completion of the entry procedure, press button to conrm the setting and press button to return the main set up menu.
EU/I
ESC
M-Bus Address
On completion of the entry procedure, press button to conrm the setting and press button to return the main set up menu.
EU/I
ESC

02 4047 0777 www.mercs.com.au02 4047 0788 15
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
From the Set up menu, use and buttons
to select the Baud Rate option.
Press to enter the selection routine. The current
setting will ash.
Use and buttons to choose Baud rate
2.4k. 4.8k, 9.6k, 19.2k, 38.4k
MP
E
Baud Rate
The PT option sets the secondary voltage (PT2 100 to 500V) of the Voltage transformer (PT) that wires to the meter.
MP
On completion of the entry procedure, press to conrm the setting and press to return to the main set up menu.
EU/I
ESC
Parity
From the Set up menu, use and buttons
to select the Parity option.
Press to enter the selection routine. The current
setting will ash.
MP
E

02 4047 0777 www.mercs.com.au02 4047 0788 16
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
Use and buttons to choose Parity (EVEN
/ ODD / NONE) Default is NONE.
U/I
ESC
U/I
ESC
On completion of the entry procedure, press to conrm the setting and press to return to the main set up menu.
On completion of the entry procedure, press to conrm the setting and press to return to the main set up menu.
MP
E
E
Stop bits
From the set-up menu, use and buttons
to select the stop bit option.
Press to enter the selection routine. The cur
rent setting will ash.
Use and buttons to choose stop bit
(2 or 1)
Note: Default is 1, and only when the parity is
NONE that the stop bit can be changed to 2.
M
M
P
P
E
Backlit set-up
Default:60
If it’s setted as 5,the backlit will be o in 5minutes.
The meter provides a function to set the blue backlit lasting time( 0/5/10/30/60/120 minutes).
Option 0 means the backlit always on here.

02 4047 0777 www.mercs.com.au02 4047 0788 17
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
Use and buttons to choose the time
MP
1From the Set up menu, use and buttons
to select the reset option.
2-1 Press to enter the selection routine. The dlt
will ash.
MP
E
CLR
The meter provides a function to reset the maximum demand value of current and power.
Press to conrm the setting and press to return to the main set up menu.
U/I
ESC
E
Press to conrm the setting and press to return to the main set up menu.
U/I
ESC
E
Specications
Measured Parameters
The unit can monitor and display the following parameters of a single phase two wire(1p2w) 1p2w), three phase three wire (3p3w) or four phase
four wire (3p4w) system.
Voltage and Current
• Phase to neutral voltages 100 to 289V a.c.
(not for 3p3w supplies)
• Voltages between phases 173 to 500V a.c.
(3p supplies only)
• Percentage total voltage harmonic distortion
(THD%) for each phase to N ( not for 3p3w supplies)
• Percentage voltage THD% between phases
(three phase supplies only)
• Current THD% for each phase

02 4047 0777 www.mercs.com.au02 4047 0788 18
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
Measured Inputs
Voltage inputs through 4-way xed connector with 2.5mm² stranded wire capacity.single phase two wire(1p2w), three phase three wire(3p3w) or
three phase four wire(3p4w) unbalanced. Line frequency measured from L1 voltage or L3 voltage.
Three current inputs (six physical terminals) with 2.5mm² stranded wire capacity for connection of external CTs. Nominal rated input current 5A or
1A a.c. Rms.
Power factor and Frequency and Max. Demand
Energy Measurements
• Frequency in Hz
• Instantaneous power:
• Power 0 to 3600 MW
• Reactive Power 0 to 3600
• MVAr
• Volt
• Volt-amps 0 to 3600 MVA
• Maximum demanded power since last Demand reset Power factor
• Maximum neutral demand current, since the last Demand reset
( for three phase supplies only)
Accuracy
Imported/Exported active energy 0 to 9999999.9 kWh
Imported Exported reactive energy 0 to 9999999.9 kVArh
Total active energy 0 to 9999999.9 kWh
Total reactive energy 9999999.9 kVArh
Voltage 0.5% of range maximum
Current 0.5% of nominal
Frequency 0.2% of mid-frequency
Power factor 1% of unity (0.01)
Active power (W) ±1% of range maximum
Reactive power (VAr) ±1% of range maximum
Apparent power (VA) ±1% of range maximum
Active energy (Wh) Class 0.5S IEC 62053-21
Reactive energy (VArh) ±1% of range maximum
Total harmonic distortion 1% up to 31st harmonic
Response time to step input 1s, typical, to >99% of nal reading,
at 50 Hz
Auxiliary Supply
Two-way xed connector with 2·5mm2 stranded wire capacity. 85 to 275V a.c. 50/60Hz ±10% or 120V to 380V d.c. ±20%. Consumption < 10W.

02 4047 0777 www.mercs.com.au02 4047 0788 19
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
Interfaces for External Monitoring
Three interfaces are provided:
• RS485 communication channel that can be programmedfor Modbus RTU protocol
• Relay output indicating real-time measured energy.(congurable)
• Pulse output 3200imp/kWh (not congurable)
The Modbus conguration (baud rate etc.) and the pulse relay output assignments (kW/kVArh, import/export etc.) are congured through the set-up
screens.
Pulse Output
The pulse output can be set to generate pulses to represent kWh or kVArh.
Rate can be set to generate 1 pulse per:
0.01 = 10 Wh/VArh
0.1 = 100 Wh/VArh
1 = 1 kWh/kVArh
10 = 10 kWh/kVArh
100 = 100 kWh/kVArh
1000 = 1000 kWh/kVArh
Pulse width 200/100/60 ms.
Relay Rating 240V ac 50mA
RS485 Output for Modbus RTU
For Modbus RTU, the following RS485 communication parameters can be congured from the set-up menu:
Baud rate 2400, 4800, 9600, 19200, 38400
Parity none (default) / odd / even
Stop bits 1 or 2
RS485 network address nnn – 3-digit number, 1 to 247
ModbusTM Word order Hi/Lo byte order is set automatically to normal or reverse. It cannot be congured from the set-up menu.
Reference Conditions of Inuence Quantities
Inuence Quantities are variables that aect measurement errors to a minor degree. Accuracy is veried under nominal value (within the specied
tolerance) of these conditions.
Ambient temperature 23°C ±1°C
Input frequency 50 or 60Hz ±2%
Input waveform Sinusoidal (distortion factor < 0·005)
Auxiliary supply voltage Nominal ±1%
Auxiliary supply frequency Nominal ±1%
Auxiliary supply waveform (if AC) Sinusoidal (distortion factor < 0·05)
Magnetic eld of external origin Terrestrial ux

02 4047 0777 www.mercs.com.au02 4047 0788 20
Strider M4 V2 ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardi, NSW, 2285, Australia | 2019 V1.1
Environment
Mechanics
• Operating temperature: -25OC to + 55OC*
• Storage temperature: -40OC to + 70OC*
• Relative humidity: 0 to 95%, non-condensing
• Altitude: Up to 3000m
• Warm up time: 1 minute
• Vibration: 60068-2-6, 2g
• Shock: 30g in 3 planes
• DIN rail dimensions: 72 x 94.5 mm (WxH) per DIN 43880
• Mounting: DIN rail (DIN 43880)
• Sealing: Ip51 (indoor)
• Material: Self-extinguishing Ul94 V-0
* Maximum operating and storage temperatures are in the context of typical daily and seasonal variation.
Dimensions
This manual suits for next models
1
Table of contents
Other MerCs Measuring Instrument manuals
Popular Measuring Instrument manuals by other brands

Shinyei
Shinyei OMX-ADM Operation manual

Chauvin Arnoux
Chauvin Arnoux Ulys MD45 Series quick start

Alti-2
Alti-2 D-90114 user manual

Etatron
Etatron eSelectM 2 PH-CL Operating instructions and maintenance

Oakton
Oakton 35700-00 operating instructions

Teledyne Lecroy
Teledyne Lecroy WaveMaster 8000HD Getting started guide