MESON GC 1 User manual

Article no: 74504 Revision: 9
Installation and operating manual
GC Unit
Product no: GC 1-3

Installation and operating manual
GC-Unit
Article no: 74504 Revision: 9 2 (12)
Contents
1. General information.............................................................................................. 4
2. Safety precautions ............................................................................................... 4
2.1 Significance of symbols ................................................................................................................. 4
2.2 Explanatory notes on safety information...................................................................................... 4
3. Safety instruction ................................................................................................. 5
4. Technical data....................................................................................................... 5
4.1 Hydraulic oil recommendation....................................................................................................... 5
4.2 Sealing.............................................................................................................................................. 5
5. Description of function ........................................................................................ 5
5.1 System design ................................................................................................................................. 5
6. Options available.................................................................................................. 5
6.1 Header tank...................................................................................................................................... 6
6.2 Manifolds.......................................................................................................................................... 6
6.3 GC2/25B............................................................................................................................................ 6
7. Storing and Transport.......................................................................................... 7
8. Location of cabinet............................................................................................... 7
9. Installation............................................................................................................. 7
9.1 GC unit installation.......................................................................................................................... 7
9.2 Cabinet installation, for cabinet mounted GC-units only ................................................................ 8
10. Putting into operation ........................................................................................ 9
11. Testing of function ............................................................................................. 9
12. Operating instructions..................................................................................... 10
12.1 Operating with Meson Quick closing valves............................................................................ 10
13. Maintenance instructions ................................................................................ 10

Installation and operating manual
GC-Unit
Article no: 74504 Revision: 9 3 (12)
13.1 Function testing........................................................................................................................... 10
14. Troubleshooting scheme................................................................................. 11
15. Service kits........................................................................................................ 12
16. Contact info....................................................................................................... 12

Installation and operating manual
GC-Unit
Article no: 74504 Revision: 9 4 (12)
1. General information
This manual gives instructions on installation of the Hydraulic Control Station together with
maintenance recommendations and shall be read carefully before installation is started.
It is in the responsibility of the installer to ensure that the work is carried out in a satisfactorily
manner, approved materials are used and that the installation meets applicable rules and regulations.
Regional safety requirements must be applied and observed both at installation and maintenance as
well as in repair work
It is the installer/owners responsibility to define responsibility and competence of personnel for the
installation and maintenance of the valves. In case of problems which cannot be solved from
information in this manual the supplier of the valves shall be contacted. The notes and warnings
defined in following chapters must be followed as this information concerns your safety.
Note! Part numbering (..) in chapter 6.3 Part list are maintained and used as references through all
chapters.
The manufacturer reserves the right to introduce technical modifications at any time.
2. Safety precautions
2.1 Significance of symbols
Attention!
Warning of general danger.
2.2 Explanatory notes on safety information
In these Operating and Installation Instructions dangers, risks and items of safety information is
highlighted to attract special attention.
Information marked with the above symbol and "ATTENTION!" describes practices, a failure to
comply with which can result in serious injury or danger of death for users or third parties or in
material damage to the system or the environment. It is vital to comply with these practices and to
monitor compliance.
All other information not specifically emphasised such as transport, installation, operating and
maintenance instructions as well as technical data (in the operating instructions, product
documentation and on the device itself) must also be complied with to the fullest extent in order to
avoid faults which in turn can cause serious injury to persons or damage to property.

Installation and operating manual
GC-Unit
Article no: 74504 Revision: 9 5 (12)
3. Safety instruction
•Be aware of the fact that the stem with related components (hand wheel) on the QCV
will fall down very rapidly by spring force at closing of the valve.
•Avoid injury by always secure the release system when work is carried out on the
valve. When testing the remote release system, stay away from moving parts on the
valve.
•Loosening any part under system pressure can cause injury.
4. Technical data
4.1 Hydraulic oil recommendation
At normal conditions we recommend hydraulic oil in accordance with the specifications below. Use of
other media, it is the installers fully responsibility to assure the function of the GC-system.
Viscosity: at 40°C approx. 15 Cst
Viscosity index: approx. 150
Pour point: approx. -45°C
Anti wear additive: to be added.
For arctic conditions: use oil corresponding to international
specifications MIL-H-5606 B
Oil volume: 26,5 cm3.
4.2 Sealing
The GC25B-unit has O-ring seals. In case of excessive heat, make sure that these have not been
damaged. If so is the case; replace.
5. Description of function
5.1 System design
Each release handle can control a single valve or a group of maximum 6 valves. The design of the
control system and dividing of the control handle groups are in the responsibility of the system
designer.
6. Options available
•Pipe fittings for outlet connections
•Special signs
•Cabinet in mild or stainless steel.
•Header tank 1,4 litres article no 70078
•DistributionManifolds 2 –6 connections
•Shuttle valves

Installation and operating manual
GC-Unit
Article no: 74504 Revision: 9 6 (12)
6.1 Header tank
When a system has a quick closing valve or more placed above the GC unit there is a need of a header
tank to avoid empting the system of oil. The oil level glass (4) is replaced with an angel fitting for
connection with the higher located tank. The oil filling plugs in the GC units has to be replaced with
an undrilled plug and proper sealing. (For dimensions, see table in GC-2 Left and front view)
6.2 Manifolds
In the event that two GC units are connected to the same valve for closing from different locations the
system must be equipped with a shuttle valve to direct oil flow to the valve.
6.3 GC2/25B
GC- 2 Left and front view
L D H Weight (Kg) Cabinet included
GC25B-1 60 121 437 3,1 16
GC25B-2 106 121 437 6,3 18,5
GC25B-3 156 121 437 9,4 21
Pos.
Description
1
Mounting plate
2
Control handle
3
Piston
4
Oil level glass
5
Oil reservoir/house
6
7
Breakable glass
8
Emergency hammer
9
Emergency instruction
10
Filling plug
Attention!
Protect the GC-unit and cabinet against external forces. To avoid loading at the glass window the
cabinet shall be transported in standing position. For lifting, use suitable soft handling equipment
to avoid damage on painted surfaces.

Installation and operating manual
GC-Unit
Article no: 74504 Revision: 9 7 (12)
7. Storing and Transport
•The GC-unit shall be stored indoors well protected from dust and moisture.
•Long time storing must be done in warm warehouses to avoid corrosion on
unprotected surfaces.
•Plastic protection covers fitted to pipe connection threads (6) are not to be removed
until pipe assembly.
8. Location of cabinet
The cabinet shall be located in a space which has a good protection in event of fire and in easy reach
for emergency closing of the valves.
9. Installation
All installation of the GC-unit must be done by authorized personnel.
9.1 GC unit installation
The connecting pipes (connected to pos 6) from the GC-unit to the valve or groups of valves shall be
minimum metric 6x1 steel tubes or corresponding inch diameter.
The pipes must be properly cleaned and burrs must be removed before mounting.
The pipes must be installed with continuous inclination towards the GC unit to ensure proper function;
this will even ease venting the system. Excessive piping will multiply the possibility of air pockets;
keep the piping as short as possible.
To avoid thermal expansion of the oil do not place the pipes close to warm areas or areas with big
temperature differences.
Attention!
Continuous inclination from QCV to GC units is essential to bleed the system from air and secure
proper function.

Installation and operating manual
GC-Unit
Article no: 74504 Revision: 9 8 (12)
9.2 Cabinet installation, for cabinet mounted GC-units only
The cabinet is fixed to the bulkhead or wall by screws in the holes in the back of the cabinet.
Cabinet Back and right view
New version
Old version
Cabinet size
(WxHxD)
W1*H1*d
Cabinet size
(W*H*D)
W1*H1*d
Approximate
Weight (kg)
GC-1
380*600*210
340*560*9,25
400*600*200
350*550*9
16
GC-2
380*600*210
340*560*9,25
400*600*200
350*550*9
19
GC-3
380*600*210
340*560*9,25
400*600*200
350*550*9
21
GC-4
380*600*210
340*560*9,25
400*600*200
350*550*9
24
GC-5
600*600*210
560*560*9,25
600*600*200
550*550*9
29
GC-6
600*600*210
560*560*9,25
600*600*200
550*550*9
32

Installation and operating manual
GC-Unit
Article no: 74504 Revision: 9 9 (12)
10. Putting into operation
•Put the lever (2) of the GC25B unit upright position until they are fixed by the clamp.
•Fill the reservoir (5) with oil until the oil level is on top of the indicating glass (4).
•For some applications or when the GC25B unit is located below the highest placed quick
closing valve a header tank must be included in the system. When including a header tank, the
plug on the reservoir top must be replaced with a plug without venting hole. All filling of oil
must be via the header tank.
•Loosen the pipes from the release cylinders, one at the time, and let the oil flow until it is clear
and free from all air.
•If the pipes do not have an even inclination, venting can be eased by filling the pipe from the
valve-end side with a pump.
•Keep filling the reservoir (5) with oil during the filling process.
•Before connecting the pipes to the release cylinders, fill the cylinder with oil.
•Check piping system for leakage.
•Put the control handles (2) in position open.
•Reset the quick closing valves to open position. This is done by using the hand wheel on the
top of the quick closing valve. See quick closing valve; Installation and Maintenance manual.
11. Testing of function
•Make sure all control handles (2) are in upright position and fixed by the clamp.
•Be assured that the system is filled with oil and bleeded for air.
•Check the oil level (4) in the reservoir (5).
•Check that all Quick Closing Valves are loaded and in open position.
•Operate each control handle (2) and check that corresponding quick closing valve or valves
will close.
Attention!
Make sure before testing, or in any way interrupt the function of the quick closing valve system, it
will not affect the safety arrangements for the ship.
Attention!
Be aware of the fact that the hand wheel on the quick closing valve will fall down very rapidly
when the release cylinder on the quick closing valve is pressurized.
When testing, stay away from moving parts on the valve.

Installation and operating manual
GC-Unit
Article no: 74504 Revision: 9 10 (12)
12. Operating instructions
In an emergency situation follow the instruction sign located on the GC25B unit.
For GC25B units with a cabinet and emergency hammer, break the window.
For cabinets without emergency hammer, use the key and open the door.
12.1 Operating with Meson Quick closing valves
When operating with Meson Quick closing valves the lever should be subjected to a pulling force of
375N at a distance of 35mm from the edge of the lever to ensure actuation of the Meson release unit.
When pulling the lever the operator will feel the piston moving and stopping when the valve is
actuated which can occur at lower forces than 360N. The force must not exceed 440 N, as to not
damage the release cylinder. The operating range to ensure that the release unit will have enough force
to open is 25-30 Bar and must not be exceeded.
13. Maintenance instructions
The system requires no maintenance, but the following recommends to be checked at regular intervals:
•Clean and check the piston (3) for heavy scratches.
•Check the clamp ability to fix the control handle, adjust if necessary.
•Check the level of oil in the reservoir, refill if necessary.
Note
Intervals for inspection of the GC25B units can vary depending on the environment. The inspection
can be scheduled after experience or after recommendations from the classification society, other
authorities or the ship owner.
13.1 Function testing
At regular intervals or at a classification survey check the function of the system.
Attention!
When the glass window has been broken remove all sharp glass pieces before putting the hands
inside the cabinet.

Installation and operating manual
GC-Unit
Article no: 74504 Revision: 9 11 (12)
14. Troubleshooting scheme
Attention!
When testing the system, be sure that the closing of valves will not cause any disturbance for the
function of the ship.

Installation and operating manual
GC-Unit
Article no: 74504 Revision: 9 12 (12)
15. Service kits
Repair kits are available. For replaceable articles, please contact Meson.
Repair kit
Article no.
Contents
Spare part kit1 GC25/B
92380
72430 –2 pcs O-ring
70074 –1 pc Level sight glass
72423 –1 pc Wiper seal
Spare part kit2 GC25/B
92381
72419 –1 pc Lever
70060 –1 pc Chain link
70059 –1 pc Clamp
70648 –2 pcs Set screw MSK6SS
72293 –2 pcs Screw MC6S
Spare part kit1 GC30/A
92382
70531 –2 pcs O-ring
70074 –1 pc Level sight glass
70085 –1 pc Scraper
Spare part kit2 GC30/A
92385
70057 –1 pc Lever
70060 –1 pc Chain link
70059 –1 pc Clamp
70821 –2 pcs Set screw MSK6SS
72293 –2 pcs Screw MC6S
16. Contact info
Meson AB
Kullsgårdsvägen 27
SE-312 34 Laholm
SWEDEN
Phone: +46 (0)430 295 00
Fax.:+46 (0)430 171 91
E-mail: sales@mesongroup.com
Website: http://www.mesongroup.com
This manual suits for next models
5
Table of contents
Popular Control Unit manuals by other brands

Ublox
Ublox SARA-R4 Series System integration manual

Ublox
Ublox MPCI-L2 series System integration manual

IBC control
IBC control MicroMax F21009201 manual

Nibe
Nibe SAM 42 Installer manual

GEM
GEM 762 Installation, operating and maintenance instructions

Metso
Metso Ball Valves Installation maintenance and operating instructions