
Bespoke Showcase Engineers
5
Preparation WorkSixth110 Assembly Guide
You will need
If you are joining the display cases
horizontally, do not insert the C-Channel
on the connecting bar.
If you are joining the display cases
horizontally, do not insert the C-Channel
on the connecting bar.
Please make sure the C-channel
does not cover the pilot hole.
Please make sure the C-channel
does not cover the pilot hole.
C-Channel
Pilot Hole
• Side Frame Top Bottom Bar x 4
• Side Frame Back Bar x 2
• Side Frame Front Bar x 2
• Horizontal C-Channel x 4
• Vertical C-Channel x 4
Side Frame Top Bottom Bar
Position the bar on any side. Install a Horizontal
C-Channel into the top slit of the bar. Repeat for all bars.
Side Frame Front Bar
Place a bar with the magnets facing down.
Install a Vertical C-Channel into the top slit.
Repeat for all bars.
Side Frame Back Bar
Position the bar with the pilot holes facing
the flat surface. Install a Vertical C-Channel
into the top slit of the bar. Repeat for all bars.
Steps to install C-Channel
Step 1. Flatten one end of the C-Channel by
pressing the open edges together.
Step 2. Push the compressed tip into the slit
of the bar.
Step 3. Press down the rest of the C-Channel
You will need
Steps to insert M5-Long Screw
Step 1. Insert the M5-Long Screw fully into
the M5-Washer.
Step 2. Position the screw with washer into
the pilot hole on the left side of the
bar. Turn clockwise to tighten the
screw. Leave a 15mm gap between
the washer and bar.
Step 3. Repeat steps 1-2 for the other side
of the bar.
Step 4. Repeat steps 1-3 for
15mm
M5 Washer
M5 Washer
M5 Washer
• M5-Long Screw x 16
• M5-Washer x 16
• Side Frame Top Bottom Bar x 4
• Back Frame Top Bottom Bar x 2
• Front Frame Top Bottom Bar x 2
• Side Frame Top Bottom Bar x 4
• Front Frame Top Bottom Bar x 2
•Back Frame Top Bottom Bar x 2