
Table of contents
Maschinenfabrik Reinhausen GmbH 202045293014/01 ENVACUTAP® VR I HD-Ex
4 Packaging, transport and storage .................................................................................. 37
4.1 Packaging ......................................................................................................................................... 37
4.1.1 Suitability.............................................................................................................................................................37
4.1.2 Markings..............................................................................................................................................................38
4.2 Transportation, receipt and handling of shipments........................................................................... 38
4.3 Storage of shipments........................................................................................................................ 39
4.4 Unpacking shipments and checking for transportation damages ..................................................... 40
5 Mounting ........................................................................................................................... 41
5.1 Installation information...................................................................................................................... 41
5.2 Preparatory work .............................................................................................................................. 42
5.2.1 Fitting mounting flange on transformer cover......................................................................................................42
5.2.2 Fitting stud bolts on mounting flange ..................................................................................................................42
5.3 Installing the on-load tap-changer in the transformer (standard version) ......................................... 43
5.3.1 Fastening on-load tap-changer to transformer cover ..........................................................................................43
5.3.2 Connecting the tap winding and on-load tap-changer take-off lead....................................................................57
5.3.3 Performing transformer ratio test before drying ..................................................................................................67
5.3.4 Performing DC resistance measurement on transformer....................................................................................68
5.3.5 Drying on-load tap-changer in autoclave ............................................................................................................69
5.3.6 Drying on-load tap-changer in transformer tank..................................................................................................71
5.3.7 Filling the oil compartment of the on-load tap-changer with insulating fluid........................................................87
5.3.8 Performing transformer ratio test after drying .....................................................................................................89
5.4 Installing on-load tap-changer in transformer (bell-type tank version).............................................. 90
5.4.1 Inserting on-load tap-changer into supporting structure......................................................................................90
5.4.2 Connecting the tap winding and on-load tap-changer take-off lead..................................................................100
5.4.3 Performing transformer ratio test before drying ................................................................................................109
5.4.4 Performing DC resistance measurement on transformer..................................................................................110
5.4.5 Drying on-load tap-changer in autoclave ..........................................................................................................111
5.4.6 Lifting top part of on-load tap-changer head off supporting flange (bottom part) ..............................................113
5.4.7 Attaching the bell-type tank and connecting the on-load tap-changer to the top part of the on-load tap-changer
head ..................................................................................................................................................................120
5.4.8 Drying on-load tap-changer in transformer tank................................................................................................129
5.4.9 Filling the oil compartment of the on-load tap-changer with insulating fluid......................................................146
5.4.10 Performing transformer ratio test after drying ...................................................................................................148
5.5 Fitting protective devices and drive components............................................................................ 148
5.5.1 Electrically connecting the temperature sensor ................................................................................................148
5.5.2 Installing protective relay in piping and connecting...........................................................................................149