
i
How This Manual Is Configured
GT10 Main Unit
Before Using the GT10 for the First Time
This section describes items that should be confirmed and precautions that should
be observed before the GT10 is used for the first time.
Chapter 1. Specifications
This chapter contains the names and specifications of the various parts of the GT10,
as well as a table of functions, wiring diagrams, and dimensions.
Chapter 2. Installation and Wiring
This chapter explains how the GT10 should be installed and how wiring should be
connected.
Chapter 3. Setup
This chapter describes the setup procedures necessary when using the GT10 for the
first time.
Chapter 4. Connecting and Communicating with the PLC
This chapter explains how to connect the GT10 to the PLC and the FP series by
Matsushita, and how to set up communications between the units.
Chapter 5. GT Configuration Settings
This chapter describes the configuration settings for the GT10, and how they should
be entered.
Chapter 6. Using the Various Functions
Functions such as switching GT10 screens, backlighting, and buzzer control are
explained here.
Chapter 7. Servicing and Maintenance
This chapter describes servicing and maintenance procedures for the GT10, as well
as how optional items are handled.
Chapter 8. Troubleshooting
This explains what to do if there appears to be something wrong with the GT10, or an
error occurs.
Chapter 9. Documentation
This section includes BIN/HEX/BCD code correspondence tables, ASCII code tables,
cable specifications, and other information.
Screen Creation Tool Terminal GTWIN
Before Using Terminal GTWIN for the First Time
This section contains special precautions that should be read if you are using GTWIN
for the first time.
Chapter 1. Preparation
This section explains how to install GTWIN in the personal computer, how to boot it,
and how to exit it.