
HYPERION R-Lite Accent is one of the most advanced and
versatile LED illumination products on the marketplace today. It
is a proven performer in the harshest environments having been
utilized for outdoor Sign Illumination for over 8 years.
Today, HYPERION R-Lite is used in cove, under/over cabinet, light
box, menu board, toe kick, display case, and for other accent
illumination needs.
HYPERION R-Lite Accent is superior to other LED illumination
products based upon its superior design, thermal management,
even illumination, ease of installation and use, and true energy
savings that it provides.
The versatility of the product leads to unlimited possibilities while
the ease of installation provides significant savings when compared
to nearly any other product. R-Lite uses a continuous flexible
conductor carrier to electronically connect the LED modules, which
can be mounted to the surface with adhesive that covers 100% of
the strips backing. The flexible conductive tape is extremely strong
and can be crimped to turn corners or adjusted to meet the needs
of the application.
1.A) Surface must be free of dust, dirt, and
grease. Use non-oil based solvent (409,
alcohol) to clean surface. Area must be
dry before application. HYPERION R-Lite™
bonds to all non porous surfaces.
(Note: Application temperature range: 32˚F
to 100˚F or 0˚C to 38˚C)
(Note: For porous surfaces use Hyperion
HY-Lite support clamps (HRL-SC).
The support clamps can be purchased in
packages of 50 (HRL-SC-P).)
STEP 1
SURFACE PREPERATION
INSTALLING THE HYPERION R-LITE STRIP
STEP 2
2.A) Determine Linear footage required for each area to be illuminated.
(Note: HYPERION Hy-Lite comes in 25 foot sections, so before beginning
your application it is recommended that you review your plans and layout
longer runs first. Please follow layout diagrams and if needed consult with
a Lumificient representative. By doing this you will cut down on waste,
maximize strip, and limit the need for added components)
2.B) BALANCE THE LOAD. When planning your installation please
consider LOAD requirements. For optimal power distribution divide the load
evenly between terminals 1 and 2. Minimum load per terminal is 10 linear
ft. (Maximum load is 35 linear feet when power supply is located within 25ft
of runs.)
2.C) Unroll necessary amount of HYPERION R-Lite strip and visually inspect the
contents for shipping damage. Expose approximately 6 inches of the adhesive
backing for installation by placing the strip between left and right thumb and
forefingers and using a fingernail to being peeling the paper backing off the back of
the strip.
(Note: Do not touch adhesive tape with greasy or wet hands!)
2.D) Adhere the strip inch by inch to non porous surface. It will take some time for
the adhesive to bond to the surface (24-48 hours).
2.E) To make a curve, bend HYPERION R-lite™flexible conductor strip between the
sockets. Pinch excess strip between thumb and forefinger together. After pinching
adhere corner of the turn by firmly pushing with your forefinger.
2.F) To trim HYPERION R-Lite™strip to desired length, cut strip with scissors
directly between sockets.
(Note: Don’t make cut near any socket, and don’t use wire cutters to trim the strip.
Doing this might cause damage.)
STEP 3
INSTALLING THE POWER CONNECTOR
3.A) Power Connector should be placed in the center of the run. Unplug
the light module from the socket designated for the power connector. When
removing an LED module, place thumb and forefinger on side edges of LED
module and pull directly upwards until LED module is released from the socket.
3.B) With thumb and forefinger at base of the connector and aligned parallel
with the strip, place connector pins into socket and lightly push down on top
of connector with forefinger until the connection is secure. Plug - In Power
Connector should be placed in the center of the run.
3.C) Plug in previously unplugged light module to the top of the power connector.
3.D) Secure the connector with the power connector holder. Secure connector
cable with 1/4” wire clamp.
3.E) Connect plug - in power connector leads to 12 AWG Class 2 wire using
the brown ICD connectors supplies with the Plug - In Power connector kits. The
Class 2 wire leads to power supply.
(Note: FOR INTERNAL applications ONLY: Connect plug - in power connector
leads to 12 AWG Class 2 wire using the brown ICD connectors supplies with the
Plug - In Power connector kits. The Class 2 wire leads to power supply..)
(Note: When the plug – in power connection can not be made in the CENTER of
the strip, then the maximum run length is 12 feet.)
STEP 4
INSTALLING THE JUMPER CABLE (OPTIONAL)
Some applications may require multiple
runs of Hyperion Hy-Lite. In cases like this
use the jumper connector to connect two
separate runs as shown in picture at left.
(Note: The runs must be within 8 inches of
each other as the jumper connectors are
only 8 inches in length.)
4.A) Attach the power connector to longer
Hyperion Hy-Lite strip and secure with connector holder. Then attach (1) end
of the jumper connector to the longer strip and secure with connector holder
and plug in removed LED module. Avoid tight areas or severe bending or
stretching of the jumper.
4.B) Attach the other end of jumper to the smaller (separate) Hyperion Hy-
Lite strip located nearby and secure with connector holder. Plug in removed
LED module.
4.C) Secure all wires with self adhesive clamp. (See figure 2)
(Note: Each jumper connector equals 1 ft of LED strip and must be factored
into the footage for the power supply. Important: Please see figure 2 for
important jumper connector notes.)
LOW VOLTAGE WIRING USING
HRL-06-PFC-96 Power Unit
5.A) The HRL-06-PFC-96 is an 8VAC power unit, HYPERION R-Lite is an AC
driven system.
5.B) The power supply should be placed within 25 feet of the Hyperion
R-Lite Strip. Should you be required to locate the power supply further away
please consult with LUMIFICIENT.
5.C) Place the power unit between two selected load groups For optimal
power distribution divide the load evenly between terminals 1 and 2.
Minimum load per terminal is 10 linear ft. (Maximum load is 35 linear feet
when power supply is located within 25ft of runs.) Run a pair of 10 or 12
AWG Class 2 rated power wires from the power unit to the ends of the
selected groups. 12 AWG Class 2 wires can be purchased from Lumificient
Technologies in 50 foot spools.
(Note: Using higher than 12AWG wire will result in increased voltage drop.)
(Note: All secondary wiring must comply with Article 725 of the 2002
National Electrical Code (NEC). Class 3 PLTC wire can be used as a
substitution of Class 2 wire. Please refer to NEC 725.61 “Cable Substitution
Hierarchy.”)
5.D) Connect power connector leads to power wires (parallel electrical
connection) by using “tap and run” IDC connectors.
(Note: Do not use wire nuts for connecting power connectors to wires)
5.E) Use wire nuts ONLY to insulate end of the power wires.
5.F) Secure power wires on the wall with wire clamps
(Note: All free hanging wires must closely follow the building structure and
must be supported by wire clamps every 4.5 ft. and at least 1ft from the
power unit.)
5.G) Connect class 2 power wires to power unit terminal 1 and 2.
(Note: For better power distribution divide load between terminal 1 and 2.)
(Important: Minimum load per terminal is 10 linear feet, maximum load 35
linear feet.)
STEP 5
2C 2E 2E 2F
3A 3B 3C 3D