2. Use the network wire stripper to strip the insulation layer of the communication cable.
According to the standard line sequence TIA/EI A 568B, connect the wire to the plug of
RJ45, and then use a network cable crimping tool to make it tight. Among the network
cables, pin 1 (white and orange) and pin4 (blue) is for R S485 +A; pin 2 (orange) and pin 5
(white and blue) is for R S485B. (As shown in figure 5.22)
3. Connect the R J45 to C OM2 or COM3, and tighten the nut.
Figure 5.22 Strip the insulation layer and connect to RJ45 plug
Figure 5.23 Tighten the nut
Correspondence between the
cables and the stitches of plug
Pin 1: white and orange ; Pin 2: orange
Pin 3: white and green; Pin 4: blue
Pin 5: white and blue; Pin 6: green
Pin 7: white and brown; Pin 8: brown
Pin 1 with 4 and 2 with 5 are
used for communication connection
Pin 1 and 4 are connected with RS485+A
Pin 2 and 5 are connected with RS485 - B
1--8
Rj45 plug Rj45terminal
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
R S 4 8 5 + A R S 4 8 5 - B
4. For the cables of connecting the monitoring device or converter, the insulation of the
communication cable needs to be stripped by a network wire stripper. Connect the
corresponded signal wires of R S485 A/B to the monitoring device or RS232 converter.
Pin 1 and 4 are defined as R S485+A while pin 2 and 5 are defined as RS485 – B.
6.2 Stop the inverter
To stop the Solis three phase string inverter, it is important to follow the
steps here below:
1. Switch the Supply Main Switch (AC) OFF.
2. Wait 10 seconds. Switch the DC switch OFF or directly disconnect the DC output connector.
The LEDs and LCD of the inverter will be off within one minute.
6.1 Start the inverter
To start up the Solis three phase string inverter, it is important to follow the steps here below:
1. Switch the Supply Main Switch (AC) ON first.
2. Turn on the DC switch of PV array. If the voltage of PV arrays is higher than the start up
voltage, the inverter will turn on, and the initial interface of LCD will show “Current status:
Waiting” on the upper left corner.
3. Then the inverter will check both its internal parameters and the parameters of the
AC and DC input to ensure that they are within the acceptable limits.
4. After around 30-180 second (based on local requirment), the inverter will start to generate
power. The green LED will be on continually and the LCD displays “Current status:
Generating.”
Current status: Waiting
Current status: Generating
NOTE:
If turn on DC input switch before grid breaker, inverter may show fault message
“No_Grid” on current status, the fault will be clear if grid voltage is normal.
6. Start and Stop
5. Installation
.22. .23.