In order to maintain maximum performance, please clean your fans
regularly using a duster, slightly moist tissue or canned air. Please be
careful not to use too much force in order to prevent any damage to
the fan. Please don’t use a vacuum cleaner as this may apply excessive
force to the fan.
In order to ensure flawless operation over many years of usage, the
NF-A8 5V PWM’s premium grade SSO2 bearing is fully sealed to prevent
the entering of fine dust particles. Please note that the fan is not designed
to be taken apart by the user. Removing the impeller from the frame will
break the sealing of the bearing and results in a loss of warranty.
Cleaning and Maintenance
If you replace an existing fan, it is usually best to use the screws (or other mounting mechanisms) used for the original fan.
CAUTION: Being a 5V PWM fan, the NF-A8 5V PWM can not be run at 12V and will be damaged when used with typical 12V power sources such as PC
mainboard fan headers.
Depending on the application, it may also be possible to use the supplied mounting screws or silicone anti-vibration mounts.
For installing the fan using the NA-AV1 anti-vibration mounts, please first pull the mounts through the mounting holes of the case. Then put the fan onto the
mounts and pull them through the mounting holes of the fan:
Installation
After you’ve fixed the original fan’s cable to the OmniJoin adaptor using
the cable connectors, simply connect the NF-A8 5V PWM to the adaptor
in order to use it in your device.
Warranty and Support
Even with high-grade products and strict quality control, the possibility of
defects cannot be eliminated entirely. Therefore, we aim at providing the
highest possible level of reliability and convenience by offering a warranty
period of 6 years and direct, fast and straightforward RMA service.
Should you encounter any problems with your NF-A8 5V PWM, please
www.noctua.at
NF-A8 5V PWM | User Manual
2-3cm minimum!
Step 3
Then use flat nose pliers to push down the yellow button of the
cable connector. Make sure that the button is not jammed and
pushed all the way down. If the button is jammed, push it down from
both sides of the cable connector using the flat nose pliers.
Repeat Step 2 and 3 for the +5V lead.
Step 2
Then take one of the supplied cable connectors and insert the GND lead
of the original cable and the black lead of the OminJoin adaptor into
the two holes of the cable connector. Make sure that both leads are fully
inserted and pushed all the way back.
Connection
The NF-A8 5V PWM comes with a 4-pin PWM fan connector for PWM
based speed control. Please note that the fan can also be connected
to standard 3-pin fan headers though. When connected to 3-pin fan
headers, the fan will run at full speed. If you would like to run the fan on
USB power sources such as devices with USB host ports, power banks or
USB power supplies, please use the included NA-AC7 USB power adaptor
cable. Please note that the NA-AC7 must be used exclusively with the
NF-A8 5V PWM fan because using it with other fans bears the risk of
damaging sensitive USB host devices.
If you would like to connect the fan to other fan headers, please use the
supplied OmniJoin adaptor set as described below. The fan features a
short 20cm primary cable in order to help you minimise cable clutter in
typical applications. If you need a longer cable, please add the supplied
30cm extension (NA-EC1).
Using the OmniJoin adaptor set
The supplied OmniJoin adaptor set allows you to easily connect the
NF-A8 5V PWM to proprietary fan headers.
Please first identify the individual leads of the OmniJoin adaptor and
the original fan. The OmniJoin adaptor uses black for ground (GND) and
red for +5V. The black lead of the adaptor has to be matched with the
original GND lead and the red adaptor cable with the original +5V lead.
After you’ve identified the individual leads, please proceed
with the following steps to install the OmniJoin adaptor:
Step 1
Cut off the connector of the fan that was originally used in the device.
Make sure not to cut the cable directly at the connector, there should be
least a 2-3 cm of cable left:
Many fan cables use the same colours as the OmniJoin adaptor, but
please note that there is no guarantee for this, so make sure to correctly
identify the GND and +5V leads of the original fan. Please refer to the
manual that came with the device or contact the device manufacturer
if in doubt.
OmniJoin adaptor
Cable connectors
Connector of the original fan
GND Make sure to correctly
identify the GND and
+5V leads of the
original fan!
+5V