
Eject and Power
The Eject and Power section includes functions to eject volumes,
optimize the system and shut down or restart the IES. Options are
self-explanatory in most cases.
•Volumes should be ejected before
removal to minimize the chance of
data corruption.The eject also stops
playback and the MultiMedia
application!
•The “Repair/Optimize IES” option can
be launched as frequently as
necessary. Optimization ensures the
best performance for the system.!
•The IES should be shut down using
the “Shutdown” option rather than
via the power supply breaker.This
minimizes the chance of hard disk
corruption.