3
We reserve the right to modify product specifications without prior notice. BV700-INS-06 2822 © Oasis Engineering Limited
2. Tighten by hand.
4. Apply thread tape and thread sealant.
3. Tighten connection.
6. Complete, check the connections for
leakage on first use.
5. Join and tighten the connection
1. Apply thread tape and thread sealant.
3 to 4 turns
If galling is a concern or
unable to cover all threads,
apply a light coating over
thread tape and uncovered
threads.
Please ensure that the tape
covers all threads, but does not
overlap the end of the fitting
(Optional)
Apply two full turns
with wrench
Please ensure that the tape
covers all threads, but does not
overlap the end of the fitting
If galling is a concern or
unable to cover all threads,
apply a light coating over
thread tape and uncovered
threads.
(Optional)
Tighten connection
hand tight before apply
two full turns with
wrench
We reserve the right to modify product specifications without prior notice. BV700-INS-06 2822 © Oasis Engineering Limited
Installation
Instructions