4
We reserve the right to modify product specifications without prior notice. SNV-INS-01 2822 © Oasis Engineering Limited
6. Joint is to be welded, connect the non
return valve to the pipe. Polish and clean weld
to the required standard.
5. Ensure the correct flow direction is
considered and nut is in place before
welding join.
7. Connect the two sides together. 8. Installation complete, check for leaks on
first use.
Look for fluid
leakage on first
use.
Tighten with a
suitable
C-spanner.
Installation
Instructions
Fully weld join.