Heated & humidified 5%CO2
2
2) Open the Air and CO2regulators
(looking to the screen the regulators are on
the left wall at the end of the LSM700 row)
Down = open
Up = close AirCO2
1) Check the H2O level in the bottle
(if empty fill it with distilled H2O)