
. EDICIÓN 2004
MP-6/10
WWW.ORBINOX.COM
MODELO
4.-MAINTENANCE
It is important to observe the following warnings to avoid personal injuries or damage to
property when handling and installing the valve:
-Qualified and trained personnel must carry out the handling and maintenance of the valve.
-Use suitable Individual Protection Equipment (IPE) (gloves, safety footwear...).
-Disconnect all lines affecting the valve and put up a notice notifying that work is being carried
out on the valve.
-Isolate the valve Completely from the process.
-Release process pressure.
-Drain the fluid from the valve.
The MP valves do not require any maintenance other than the replacement of the packing (21)
and seals (2) in the tight valves.
The service life of these watertight elements depends on the valve’s operating conditions such
as pressure, temperature, abrasion and the number of operations.
4.1. Replacement packing kit (21) Drawing MP8260A2:
The packing kit includes 2 lines of synthetic packing made of 98% pure carbon filaments (MG-
420), at the head and bottom which are wrapped around pre-formed pure mineral graphite
rings (grafoil).
SEE DETAIL J
The circuit has to be depressurised before beginning any type of maintenance work.
1) Loosen the indication for the detectors or limit switches (46).
2) Loosen the guards on the support plate (49 and 50).
3) Take out the stud bolt (54) fastening the main lever (27) to the valve stem (7). If the nut
has a welding point remove it in order to be able to remove the stud bolt easily.
4) Loosen the bolts and nuts (53) joining the main support plate (26) to the intermediate valve
extension cover (20).
5) Due to its weight use a crane to remove the whole assembly, composed of the support
plate, cylinder and main lever.
6) Remove the packing gland (22 and 23) completely and take out the packing using a
screwdriver and / or a packing extractor.
Ensure that nothing is left behind inside the groove.
7) Position the new packing fitting the bottom line (MG-420) and all the grafoil rings without
fitting the head line. Position the packing gland (22 and 23) and tighten the
abovementioned assembly with a torque of 2 kg.m.
8) Remove the packing gland (22 and 23) and fit the head line (MG-420). Put the packing
gland back (22 and 23) and tighten until the whole assembly is tightened.
9) Position the assembly composed of the support plate, cylinder and main lever. Proceed in
reverse order from the disassembly for the assembly of the aforementioned assembly.
10) Carry out some operations with a loaded circuit and retighten the packing gland (22 and
23), only enough to prevent leaks. This check can be carried out using soapy water.