1 Safety Precautions 5
1.1. General Guidelines 5
1.2. Leakage Current Check 5
1.3. UV Precaution and UHM Lamp Precautions 5
2 Specifications 6
3 Function for Safety 8
3.1. Temperature Detection inside the Lamp Unit 8
3.2. Interlock Switch 8
4 Serviceman Mode 8
4.1. Setting to Serviceman Mode 9
4.2. Resetting to User Mode 9
4.3. Functions in Serviceman Mode 10
5 Self-diagnosis Display 14
5.1. Code Table 14
5.2. Comparison Table of Self-diagnosis Display and Code
16
6 Using the Serial Terminals 18
6.1. Example of Connection 18
6.2. Pin Assignments and Signal Names 19
6.3. Communication Conditions (Factory Setting) 19
6.4. Procedure of Communication Condition Settings 19
6.5. Control commands 20
6.6. Cable specifications 20
7 Using a Wired Remote Control 22
7.1. Connection Example 22
7.2. Setting Projector ID Number to Remote Control 22
8 Support for Service 23
8.1. Supporting Methods 23
8.2. Note for Replacement of A-P.C.Board 23
8.3. Replacement of the lithium battery on the A-P.C.Board
23
9 Cautions for Service 23
9.1. Servicing Methods 23
10 Parts Location 25
10.1. Electrical Parts Location 25
10.2. Electromechanical Parts Location 25
11 Replacement of Lamp Unit 26
11.1. Precautions on Lamp Unit Replacement 26
11.2. Timing of Lamp Unit Replacement 26
11.3. Indication of Lamp Monitor 27
12 Disassembly Instructions 28
12.1. Flowchart for Disassembly 28
12.2. Removal of Upper Case 29
12.3. Removal of A-P.C.Board 30
12.4. Removal of CL-P.C.Board 31
12.5. Removal of FH-Module 31
12.6. Removal of G-P.C.Board 32
12.7. Removal of J-P.C.Board 33
12.8. Removal of J2-/J3-P.C.Board 34
12.9. Removal of L1-/L2-/L3-/L4-P.C.Board 34
12.10. Removal of NN-Module 35
12.11. Removal of R-P.C.Board 36
12.12. Removal of R2-P.C.Board 36
12.13. Removal of R3-P.C.Board 37
12.14. Removal of S-P.C.Board 38
12.15. Removal of SL-P.C.Board 39
12.16. Removal of K-Module 39
12.17. Removal of Ballasts 1 and 2 (B/Q-Module) 40
12.18. Removal of Ballasts 3 and 4 (B/Q-Module) 42
12.19. Removal of PFC-Modele 44
12.20. Removal of PC-Module 45
12.21. Removal of WF-Module (PT-DZ12000*/D12000* only) 46
12.22. Removal of Projection Lens 47
12.23. Removal of Lamp Unit 47
12.24. Removal of Iris Unit 49
12.25. Removal of Analysis Block 49
12.26. Removal of Synthesis Block 53
12.27. Removal of DMD Block and Liquid Cooling Unit 53
12.28. Removal of Analysis Mirror 55
12.29. Removal of Lens Mount Unit 55
13 Troubleshooting 56
14 Interconnection Block Diagram 75
14.1. Interconnection Block Diagram (1/4) 75
14.2. Interconnection Block Diagram (2/4) 76
14.3. Interconnection Block Diagram (3/4) 77
14.4. Interconnection Block Diagram (4/4) (PT-
DZ12000*/D12000*) 78
14.5. Interconnection Block Diagram (4/4) (PT-DW100*) 79
15 Block Diagram 81
15.1. Power Supply (1/2) 81
15.2. Power Supply (2/2) 82
15.3. Signal Processing (1/2) 83
15.4. Signal Processing (2/2) (PT-DZ12000*/D12000*) 84
15.5. Signal Processing (2/2) (PT-DW100*) 85
15.6. Control and Driving System (1/2) 86
15.7. Control and Driving System (2/2) 87
16 Schematic Diagram 89
16.1. A-P.C.Board (1/11) 90
16.2. A-P.C.Board (2/11) 91
16.3. A-P.C.Board (3/11) 92
16.4. A-P.C.Board (4/11) 93
16.5. A-P.C.Board (5/11) 94
16.6. A-P.C.Board (6/11) 95
16.7. A-P.C.Board (7/11) 96
16.8. A-P.C.Board (8/11) 97
16.9. A-P.C.Board (9/11) 98
16.10. A-P.C.Board (10/11) 99
16.11. A-P.C.Board (11/11) 100
16.12. G-P.C.Board (1/5) 101
16.13. G-P.C.Board (2/5) 102
16.14. G-P.C.Board (3/5) 103
16.15. G-P.C.Board (4/5) 104
16.16. G-P.C.Board (5/5) 105
16.17. J-P.C.Board 106
CONTENTS
Page Page
3
PT-DZ12000U / PT-DZ12000E / PT-D12000U / PT-D12000E / PT-DW100U / PT-DW100E