PERCo ST-11 Installation and operating instructions

Speed gate
ST-11
and double-sided section
STD-11
ASSEMBLY AND OPERATION MANUAL

Speed gate
ST-11
and double-sided section
STD-11
Assembly and operation manual

CONTENTS
1FUNCTION ............................................................................................................................3
2OPERATING CONDITIONS .................................................................................................. 3
3TECHNICAL SPECIFICATIONS............................................................................................ 6
4DELIVERY SET .....................................................................................................................7
4.1 Standard delivery set.......................................................................................................7
4.1.1 ST-11 Speed gate.................................................................................................................. 7
4.1.2 STD-11 double-sided section ................................................................................................ 8
4.2 Optional equipment that can be ordered in addition to the standard delivery set ............. 9
5DESIGN AND OPERATION...................................................................................................9
5.1 Main features...................................................................................................................9
5.2 Design ...........................................................................................................................10
5.2.1 Section ................................................................................................................................. 12
5.2.2 Indication blocks .................................................................................................................. 12
5.2.3 RC-panel.............................................................................................................................. 12
5.2.4 Control board ....................................................................................................................... 13
5.2.5 Control signals ..................................................................................................................... 15
5.2.6 Control modes...................................................................................................................... 16
5.2.7 Speed gate operation algorithm........................................................................................... 17
5.3 Operating devices..........................................................................................................17
5.3.1 RC-panel connection ........................................................................................................... 17
5.3.2 Fire Alarm device ................................................................................................................. 18
5.3.3 Operation from the ACS ...................................................................................................... 19
5.4 Optional devices connected to the speed gate ..............................................................19
5.4.1 PASS outputs....................................................................................................................... 19
5.4.2 Siren..................................................................................................................................... 19
5.4.3 External indication ............................................................................................................... 20
6MARKING AND PACKAGING .............................................................................................20
7SAFETY REQUIREMENTS ................................................................................................. 21
7.1 Installation safety requirements .....................................................................................21
7.2 Operation safety requirements.......................................................................................21
8INSTALLATION ...................................................................................................................21
8.1 Installation details ..........................................................................................................22
8.2 Use the following tools during the installation: ...............................................................22
8.3 Cable length ..................................................................................................................22
8.4 Installation order............................................................................................................22
8.5 Mounting surface marking layouts .................................................................................25
8.6 Speed gate wiring diagram ............................................................................................26
8.7 Training mode ...............................................................................................................28
8.8 “Auto-opening in the selected direction” mode...............................................................28
8.9 Assembly and disassembly of the speed gate components ........................................... 30
8.9.1 Central post cover plate....................................................................................................... 30
8.9.2 Front panel of the side post ................................................................................................. 31
8.9.3 Swing panel ......................................................................................................................... 32
8.9.4 Swing panel cover plate....................................................................................................... 32
8.9.5 Central post indication block................................................................................................ 33
8.9.6 Section top cover ................................................................................................................. 33
8.9.7 Intrusion detectors duct covers............................................................................................ 34
9OPERATION........................................................................................................................35
9.1 Power-up.......................................................................................................................36
9.2 Pulse control mode........................................................................................................36
9.3 Potential control mode ...................................................................................................37
9.4 In case of an emergency ...............................................................................................37
9.4.1 “Emergency” mode .............................................................................................................. 37
9.4.2 "Fire Alarm” mode ................................................................................................................ 37
9.5 Potential failures............................................................................................................38
10 MAINTENANCE...................................................................................................................38
11 TRANSPORTATION AND STORAGE ................................................................................. 38
Appendix 1. Operation algorithm at pulse control mode............................................................ 39
Appendix 2. Operation algorithm at potential control mode....................................................... 39

ST-11 Speed gate, STD-11 Double-sided section
3
Dear Customer!
Thank you for purchasing PERCo product. Please follow instructions given in this Manual
carefully and this high-quality product will provide many years of trouble-free use.
Assembly and Operation Manual for the ST-11 speed gate and STD-11 double-sided section
(hereinafter – the Manual) contains the instructions on safe transportation, storage, installation,
operation and maintenance of the above-mentioned products. The installation must be carried out
by qualified installers in strict accordance with the Manual.
Abbreviations adopted in the Manual:
CLB – control logic board;
PS – power supply;
RC-panel – remote control panel;
WRC – wireless remote control;
ACS – access control system;
Due to continuous improvement of products, the Manufacturer reserves the right to modify, without
previous notice, the product design not aggravating its technical specifications.
1 FUNCTION
ST-11 speed gate (hereinafter – the speed gate) is designed for pedestrian passage control at
entrance points of administrative buildings, banks, shops, railway terminals, airports, etc.
Attention!
ST-11 speed gate is de
signed for the passage of pedestrians taller than 1 m,
otherwise correct operation of the speed gate is not guaranteed. Pass through the
speed gate of children less than 1 m height tall can
only be carried by the hand
accompanied by adults1.
The speed gate features two sections: ST-11/M (hereinafter – Master section) and ST-11/S section
(hereinafter – Slave section). In a standard delivery set the speed gate allows to arrange one
passage lane. The width of the passage lane depends on the chosen swing panel width.
Use STD-11 double-sided section (hereinafter – double-sided section) to arrange more passage
lanes. Each double-sided section provides one extra passage lane.
Note:
Inside the turnstile sections, it is possible to install access card readers as m
anufactured by
PERCo (IR03.1, MR07 OEM, RP-15.2), and by third-party manufacturers.
Access card
readers are not included in the standard delivery set of the turnstile!
The choice of the type
of the reader, the purchase and installation according to the che
ckpoint blueprint and the
ACS
characteristics is the client's (installer's) responsibility. Readers must meet the
following requirements:
Overall dimension (length × width × height) .................................... max. 155×68×28 mm
Read range .................................................................................................... min. 40 mm
2 OPERATING CONDITIONS
The product with regard to resistance to environmental exposure complies with GOST15150-69
category NF4 (operation in premises with climate control).
Operation of the speed gate is allowed at an ambient air temperature from +1°C to +50°C and
relative air humidity 80% at +25°C.
1If the turnstile is installed in children's institutions or in organizations working with children, where more
secure passage mode is required, it is recommended to reflash turnstile controller with a special firmware
(ST11_Children). Its main feature is the safety zone increased to the whole passage zone of the turnstile and
particular operation algorithm when swing panels do not close if at least one sensor of the turnstile is active.
In order to get necessary recommendations regarding the firmware installation, please contact PERCo
technical support team.

Assembly and Operation Manual
4
Figure. 1ATG-300 overall dimensions
Figure. 2ATG-300H overall dimensions

ST-11 Speed gate, STD-11 Double-sided section
5
Figure. 3ATG-425 overall dimensions
Figure. 4ATG-475 overall dimensions

Assembly and Operation Manual
6
Figure. 5Turnstile's overall dimensions when organizing several passage zones
3 TECHNICAL SPECIFICATIONS
Operating voltage1...................................................................................................... 24±2.4 VDC
Current consumption2..................................................................................................... max.6.5 A
Power consumption ..................................................................................................... max. 160 W
Throughput rate in a single passage mode .................................................. up to 60 persons / min
Passageway width:
with ATG-300, ATG-300H swing panel .......................................................................... 650 mm
with ATG-425 swing panel ............................................................................................. 900 mm
with ATG-475 swing panel ........................................................................................... 1000 mm
Number of intrusion detectors:
upper level .............................................................................................................................. 24
lower level .............................................................................................................................. 24
RC-panel cable length 3 min ................................................................................................... 6.6 m
IP rating ................................................................................................................ IP41 (EN 60529)
Electric shock protection class ................................................................................. III (IEC 61140)
1The power supply is connected to the control board located in the Master section (on the Master side of
the double-sided section) and has the “ST-11.771” marking.
2Current consumption and power consumption are given for each product ST-11 and STD-11 individually.
3Maximum allowable cable length of the RC panel is 40 m (supplied upon request).

ST-11 Speed gate, STD-11 Double-sided section
7
Mean time to failure ................................................................................. min. 5,000,000 passages
Mean lifetime ....................................................................................................................... 8 years
Overall dimensions (L × W × H): see Fig. 1 - 5), mm:
with ATG-300 swing panel ......................................................................... 1236×944×1022 mm
with ATG-300H swing panel ....................................................................... 1236×944×1300 mm
with ATG-425 swing panel ....................................................................... 1236×1194×1022 mm
with ATG-475 swing panel ....................................................................... 1236×1294×1022 mm
Note:
Use the following formula to ca
lculate the overall speed gate width in case several passage
lanes are arranged (Fig. 5): L overall= 864 n + 1114 m +1214 k +130 (mm), where:
n–number of ATG-300 and ATG-300H swing panel sets installed;
m – number of ATG-425 swing panel sets installed;
k – number of ATG-475 swing panel sets installed.
Weight (net):
ST-11/M section ..........................................................................................................max 85 kg
ST-11/S section .......................................................................................................... max 85 kg
STD-11 double-sided section ................................................................................... max 100 kg
ATG-300 swing panel ................................................................................................... max 6 kg
ATG-300H swing panel ................................................................................................ max 9 kg
ATG-425 swing panel ................................................................................................... max 8 kg
ATG-475 swing panel ................................................................................................... max 9 kg
4 DELIVERY SET
4.1 Standard delivery set
4.1.1 ST-11 Speed gate
Main equipment:
Section ST-11/M (Master)1....................................................................................................... 1
Section ST-11/S (Slave)1.......................................................................................................... 1
Top cover ................................................................................................... 2 (in a separate box)
Note:
The
type of top cover is to be chosen by the Customer. The following top cover models for
theST-11 speed gate are available:
•STC-11M – made of artificial stone with a built-in indication unit;
•STC-11S – made of stainless still with a built-in rubber patch with a mnemonic image.
Central post indication block ..................................................................................................... 2
Swing panel cover .................................................................................................................... 4
Glass swing panel ...................................................................................... 2 (in a separate box)
Note:
The type of the swing panel is chosen by the customer. The following swing panel models
are available (see Fig. 1, 2, 3, 4):
•ATG-300 – for 650 mm passageway arrangement;
•ATG-300H – increased height swing panel for 650 mm passageway arrangement;
•ATG-425 – for 900 mm passageway arrangement;
•ATG-475 – for 1000 mm passageway arrangement.
RC-panel with cable ................................................................................................................. 1
Jumper ..................................................................................................................................... 3
Installation tools:
Section top cover mounting kit:
M4×16 screw ....................................................................................................................... 8
washer (4) ............................................................................................................................ 8
1Both sections are delivered with dismantled: top covers, swing panels and central indication units.

Assembly and Operation Manual
8
Central post indication block mounting kit:
M5×16 screw ....................................................................................................................... 4
washer (5) ............................................................................................................................ 4
Swing panel cover plate mounting kit:
M4×10 screw ....................................................................................................................... 8
washer (4) ............................................................................................................................ 8
Swing panel mounting kit:
M10×30 bolt ......................................................................................................................... 6
screw nut M10 ..................................................................................................................... 6
washer ............................................................................................................................... 12
plastic plug ........................................................................................................................... 6
Cardboard template for the settling surface marking ................................................................ 1
Technical documentation:
Certificate ................................................................................................................................. 1
Assembly and Operation manual .............................................................................................. 1
Packaging:
Transportation box for the Master and Slave sections .............................................................. 1
Box for section top covers ........................................................................................................ 1
Box for swing panels ................................................................................................................ 1
4.1.2 STD-11 double-sided section
Main equipment:
Double-sided section1............................................................................................................... 1
Section top cover ........................................................................................ 1 (in a separate box)
Note:
The type of top cover is to be chosen by the Customer. The following top cover models for
the STD-11 are available:
•SDC-11M – made of artificial stone with a built-in indication unit;
•SDC-11S – made of stainless still with a built-in rubber patch with a mnemonic image.
Central post indication block ..................................................................................................... 2
Swing panel cover .................................................................................................................... 4
Glass swing panel ...................................................................................... 2 (in a separate box)
Note:
The type of the swing panel is chosen by the customer. The following swing panel models
are available (see Fig. 5):
•ATG-300 – for 650 mm passageway arrangement;
•ATG-300H – increased height swing panel for 650 mm passageway arrangement;
•ATG-425 – for 900 mm passageway arrangement;
•ATG-475 – for 1000 mm passageway arrangement.
RC-panel with cable ................................................................................................................. 1
Jumper ..................................................................................................................................... 3
Installation tools:
Section top cover mounting kit:
M4×16 screw ....................................................................................................................... 4
washer (4) ............................................................................................................................ 4
Central post indication block mounting kit:
M5×16 screw ........................................................................................................................ 4
washer (5) ............................................................................................................................ 4
Swing panel cover plate mounting kit:
M4×10 screw ....................................................................................................................... 8
washer (4) ............................................................................................................................ 8
Swing panel mounting kit:
M10×30 bolt ......................................................................................................................... 6
1The section is delivered with dismantled: top covers, swing panels, top covers and central indication units.

ST-11 Speed gate, STD-11 Double-sided section
9
screw nut M10 ..................................................................................................................... 6
washer ............................................................................................................................... 12
plastic plug ........................................................................................................................... 6
Technical documentation:
Certificate ................................................................................................................................. 1
Packaging:
Transportation box for the double-sided section ....................................................................... 1
Box for section top cover .......................................................................................................... 1
Transportation box for swing panels ......................................................................................... 1
4.2 Optional equipment that can be ordered in addition to the standard
delivery set
IR03.1 (HID / EMM),or MR07 OEM (Mifare), or RP-15.2 (HID / EMM, Wiegand)
type card readers ...................................................................................... 2 per a passage lane
Anchor PFG IH10 ("SORMAT" company, Finland) with screw and washer:
for the ST-11 speed gate ........................................................................................................ 12
for STD-11 section ................................................................................................................... 8
Wireless remote control 1.............................................................................................................. 1
5 DESIGN AND OPERATION
5.1 Main features
•The speed gate allows to perform several authorized single passages in a row in one direction
without the swing panels being closed.
•The speed gate is a normally-open device, which means that when the equipment is de-
energized the swing panels move freely at ±90º angle.
•The intrusion detectors are installed on two levels throughout the speed gate passage lane.
This allows monitoring user’s location inside the passage lane. The speed gate also makes it
possible for several users to be in the same passage lane at the same time.
•There are several swing panel models, that can be chosen according to the passage lane width
and to the operation peculiarities upon making an order.
•Section top covers may be chosen when ordering; they can be made of tempered glass or
stainless steel.
•The number of the passage lanes can be increased with STD-11 double-sided section
installation.
•The turnstile supports two control modes: pulse and potential.
•It is possible to switch the speed gate to “Auto-opening in the selected direction” mode –
entering the speed gate will force the swing panels to automatically open in the preset direction
and to close after the passage is finished.
•The speed gate will generate an alarm signal in all operating modes if the passage lane is
occupied for more than 30 seconds.
•The equipment can operate as an operating device as a part of ACS or as a standalone unit
operated from the RC-panel.
•The speed gate provides the possibility of proximity card readers installation inside the posts
under the glass section top cover.
•The top covers made of the artificial stone (STC-11M,SDC-11M) have the indication units built-in.
•The speed gate features the swing panel position adjustment in the initial (locked) position
(training mode).
•The pass denial / grant indication units on the central block are well seen by the user when
passing the turnstile. It allows the users not to look for other indication units and pass faster.
•The equipment provides the possibility of external indication block connection to duplicate
passage grant / denial indication.
•Acoustic alarm (siren) connection is provided to warn the operator about unauthorized access
attempt.
1The WRC set contains a receiver that is connected to the control board and the transmission unit (pendent).

Assembly and Operation Manual
10
•Automatic emergency opening of the passage is provided upon receipt of an “Fire Alarm” signal.
The “Fire Alarm” signal can be sent by the emergency system device or by the operator using
the emergency button (hereinafter – emergency passage opening device).
•The components are made of polished stainless steel. The swing panels and the filling glass are
made of tempered glass of 8 -10 mm thick.
5.2 Design
The speed gate design is shown in Fig. 6 the double-sided section design is shown in Fig. 7. The
numbers of the equipment parts are stated in the Manual in accordance with Fig.6 and 7.
Figure. 6ST-11 overall view:
1 – central post; 2 – central post cover plate; 3 – swing panel cover plate; 4 – swing panel;
5 – central post indication block; 6 – front end indication block; 7 – the section top duct;
8 – section top cover; 9 – central post rear panel; 10 – side post;
11 – the intrusion detectors top duct; 12 – filling glass; 13 – central post rear panel;
14 – the intrusion detectors lower duct; 15 – intrusion detectors duct cover; 16 – DC cable;
17 – CAN cable; 18 – power supply with a cable; 19 – bottom duct; 120 – Fire Alarm cable1.
1Not included in the standard delivery set.

ST-11 Speed gate, STD-11 Double-sided section
11
Figure. 7STD-11 overall view:
1 – central post; 2 – central post cover plate; 3 – swing panel cover plate; 4 – swing panel;
5 – central post indication block; 6 – front end indication block; 7 – the section top duct;
8 – section top cover; 9 – central post rear panel; 10 – side post;
11 – the intrusion detectors top duct; 12 – filling glass; 14 – the intrusion detectors bottom duct;
15 – intrusion detectors duct cover; 16 – DC cable; 17 – CAN cable; 18 – power supply cable;
19 – bottom duct; 120 – Fire Alarm cable1.
The speed gate consists of two sections, Master and Slave, and an RC-panel. Each section is
equipped with a motorized swing panel (4). Slave section is connected to Master section with two
connection cables (16, 17).
Use double-sided sections to arrange more passage lane. Double-sided section is complemented
by the RC-panel It has two rotating panels (4): on the Master side and on the Slave side. Each
swing panel has its motor drive. Slave side is connected to the speed gate Master section or to the
Master side of another double-sided section with two connection cables (16, 17). The speed gate
Slave section (Slave side of the next double-sided section) is connected to Master side with two
connection cables (21, 22) from the standard delivery set.
1Not included in the standard delivery set.

Assembly and Operation Manual
12
5.2.1 Section
Each section consists of three posts: one central (1) and two side (9) posts. The posts are
connected by the section top duct (7) with the two intrusion detectors top ducts (11) and two
intrusion detectors bottom duct. Each section features a section top cover (6), which covers a top
duct. The intrusion detectors casings are closed with the covers (15).
The spacing between posts is completed with filling glass (12), which prevents unauthorized entry
into the passageway. Bolts, which fasten the filling glasses to the central post, are covered with
central post rear panel (13). Bolts, which fasten the filling glasses to the side posts, are covered
with the front panels (10).
The central post (1) features an indication block (5) with square color indicators of passage grant /
denial.
The swing panel (4) is fixed to the central post rotating support. The rotating support is covered
with the central post cover plate (3). The rotating support is driven by motor, located under the
swing panel cover plate (2).
The top covers made of the artificial stone (STС-11M and SDC-11M) have the indication units built
in (8).
The bottom part of the Master section central post features ST-01.771 speed gate control board
(hereinafter – control board). The PS, the RC-panel (WRC receiver), Fire Alarm device and Slave
section connection cables are connected to the control board.
5.2.2 Indication blocks
Each section features the following indication blocks:
•The indication unit (8) on the top covers made of the artificial stone (one on the STС-11M cover
and two - on the SDC-11M) is a red indicator marking the access card presentation area. When
the access card is presented and in case of the access permission the indicator turns green.
•Central post indication block (5) is designed for passage grant (green light) / denial (red light)
indication for each direction.
5.2.3 RC-panel
The overall view of the RC-panel is shown in Fig. 8.
Figure. 8Overall view and dimensions of the RC-panel:
1, 2, 3 – LEFT, RIGHT,Stop, buttons for mode setting;
4, 6 – green “Left”, “Right” indicators; 5 – red “Stop” indicator
RC-panel (18) is a small table device made of shockproof ABS plastic. RC-panel is designed for
speed gate operation in the manual mode, in which the operator sends commands to the
equipment.
RC-panel housing features three control buttons for sending commands. The middle STOP button
serves for setting the “Always locked” mode. The LEFT and RIGHT buttons serve to open the

ST-11 Speed gate, STD-11 Double-sided section
13
passage in the chosen direction. Up above the buttons there are LED lights, indicating passage
direction status. The red “Stop” indicator shows the “Always locked” operating mode. The possible
operation commands and RC-panel indication for pulse and potential operating modes are stated
in Tables 7 and 8.
5.2.4 Control board
Speed gate control board (Fig. 9) is installed in the central post of Master section. Remove the
central post cover plate in order to access the board (see Sect.8.9.1).
The control board features a microcontroller, which processes the incoming control commands,
transferred to Unlock A, Stop, Unlock B and Fire Alarm control inputs, monitors the status of swing
panels turn optical sensors and creates commands for the motor drive of the speed gate swing
panels on the basis of the data received.
Figure. 9Control board overall view
The microcontroller also creates signals on the control board outputs: for indication on the
RC-panel (Led A, Led Stop and Led B outputs), for the external indication (Light A, Light B
outputs), about the passage registration in the corresponding direction (PASS Aand PASS B),
about the Alarm (Alarm).
The control board features:
Connector blocks to connect: 1):
•X1 (Power)– speed gate power supply.
•X2 (RC) – operating devices: RC-panel, wireless remote control, control outputs of the
ACS-controller, Fire Alarm device.
•X3 (ACS) – sirens and ACS-controller inputs to the control board outputs.
•X4 – remote indication blocks to the controller board relay outputs.
•X5 – DC and CAN connection cables of swing panel motor drives.
•X9 – mini-USB connector for speed gate built-in software update.
Connectors for jumper installation:
•XP1 (Program) – secondary connector.
•XP2 (Mode 1) – connector not used (jumper is not installed upon delivery). During operating
the jumper should be removed.
•XP3 (+12V) – connector for turning on LED indication on the control board. The jumper is
installed by default, which corresponds to the activated buzzer.
•XP4 (Update) – connector for switching the control board to a Software update mode through
USB interface. During the operation the jumper should be removed.

Assembly and Operation Manual
14
•XP6 (BUZZ) – connector for turning on the buzzer on the control board. Buzzer operation
duplicates operation unit sound indication and siren activation. The jumper is installed by
default, which corresponds to the activated buzzer.
•XP7 (Mode2) – not used. During operating the jumper should be removed.
Switches:
•Pulse – to turn the speed gate to a pulse control mode. By default, the switch is in ON
position, which corresponds to a pulse speed gate operating mode.
•FA_Dir – to choose swing panel direction of rotation in case an emergency passage opening
(Fire Alarm) signal is sent. By default, the switch is in OFF position, which corresponds to the
swing gate being opened in B direction.
•Size1, Size2 – to set the speed gate swing panels size. 2). By default, both switches are in
OFF position.
•Test1 – not used. When operating, the switch must be in OFF position.
•Test2 – for turning on LED indication on intrusion detectors boards. By default, both switches
are in OFF position, which corresponds to the indication being switched off.
•R1 – turns on the “Auto-opening in the selected direction” mode (Sect. 8.8). When switching
the switch is in OFF position– turned off (Table 3).
•R2 – switches the speed gate to the training mode (Sect. 8.7), if the R1 switch is in OFF
position, or is used for selecting the direction of “Auto-opening” mode if the R1 switch is in ON
position. By default, the switch is set in OFF position (see Table.3).
Table1. Function of the control board terminal block contacts
Connector
block
№Contact Function
X1 (Power)
1
+24V
External power supply connection
2
GND
X2 (RC)
1
GND
General
2
Unlock A
A direction control input
3
Stop
Passage denial control Input
4
Unlock B
B direction control input
5
Led A
A direction control input on the RC-panel
6
Led Stop
Passage denial control input on the RC-panel
7
Led B
B direction control input on the RC-panel
8
Sound
RC-panel sound signal output
9
Fire Alarm
Emergency passage unlocking control input
10
GND
X3 (ACS)
1
+12V
+12V output for additional equipment powering
2
GND
General
3
Alarm1
Siren connection output
4
Alarm2
5
Common
Common for PASS A, PASS B outputs
6
PASS A
PASS A relay contact (passage in A direction)
7
PASS B
PASS B relay contact (passage in B direction)
X4
1
NO1
Normally open contact of the Light A output
2
C1
Common contact of the Light A output
3
NC
Normally closed contact of the Light A output
4
NO2
Normally open contact of the Light B output
5
C2
Normally open contact of the Light B output
6
NC2
Normally closed contact of the Light B output

ST-11 Speed gate, STD-11 Double-sided section
15
Table 2. Positioning of Size1according to the swing panel type
Swing panel model
Switches positioning
Size1
Size2
ATG-300
ON
OFF
ATG-300H
ON
ON
ATG-425, ATG-475
OFF
OFF
Table3. Speed gate operating modes in different positions of R1 and R2 switches
Switch position
Mode
R1
R2
OFF
OFF
Training and “Auto-opening” modes are turned on
OFF
ON
Training mode is switched on (Sect. 8.7)
ON
OFF
"Auto-opening” mode is switched on in A direction (Sect. 8.8)
ON
ON
“Auto-opening” mode is switched on in B direction (Sect. 8.8)
5.2.5 Control signals
Speed gate operation is performed by sending control signals to Unlock A, Stop and Unlock B
outputs. The control signal is sending a low-level signal to Unlock A, Stop and Unlock B contacts
regarding GND contacts. Normally open relay contact or layout with an open collector output can
serve as a control element (Fig. 10 and 11).
Figure. 10 The external device control elements – normally open relay contact
Figure. 11 The external device control elements –open collector output layout
Speed gate emergency unlocking is performed by sending a control signal to Fire Alarm input. The
control signal is a low-level signal release from Fire Alarm contact regarding GND contact. A
normally closed relay contact or an open collector output layout can serve as a control element. In
this case all other incoming control commands are ignored. Sending a low-level signal to
Fire Alarm input, “Always locked” mode is activated, in which the swing panels get closed.
Note:
Use 1 kOhm resistors connected to + 3,3 V voltage plane to generate a high-level signa
l on
all input contacts (Unlock A, Stop, Unlock B, Fire Alarm).

Assembly and Operation Manual
16
Control element is to provide the following characteristics of the signals:
control element – relay contact:
minimum commutated current ............................................................................. max 4 mA
closed contact resistance (regarding connection cable resistance) ................. max 200Ohm
control element – open collector output layout:
closed contact voltage (low level signal, on the control board input) .................... max 0.8 V
5.2.6 Control modes
There are two speed gate control modes – pulse and potential. In both modes the speed gate is
controlled by sending commands (i.e. control signals combinations) to Unlock A, Stop and
Unlock B control inputs and to a special Fire Alarm control input. Control command sending
algorithm changes depending on the chosen mode.
The control mode is chosen by Pulse switch on the speed gate control board (Fig. 9). Upon
delivery the switch is in ON position, which corresponds to pulse speed gate mode.
Attention!
Change the position of the switches only when the speed gate is turned off.
Shift the switch into OFF position to place the speed gate into potential control mode. Control
mode will be changed after speed gate being powered.
Pulse control mode
The mode is used for speed gate operation from RC-panel, wireless remote control and
ACS-controller with the outputs supporting pulse control mode. Speed gate operation at pulse
control mode is described in Table.7.
Control signal duration at sending control command to control inputs is to be not less than 100 ms.
The initial passage waiting time is 8 seconds and it is independent of control signal (pulse)
duration.
Control command sending algorithm, which is a combination of control signals, is given in
Appendix 1. A control command is an active front of the control signal (signal shifting from high
level to a low level) at any of the control inputs (Unlock A, Unlock Band Stop), in case there are
corresponding signal levels at other inputs.
Note:
Push the corresponding button on RC-
panel to send control signals from the
RC-panel /
WRC to the signal active front. Pressing the button corresponds to the low level
of the signal; non-pressing the button corresponds to the high level of the signal.
Potential control mode
The mode is used for speed gate operation with ACS-controller. The outputs of the ACS-controller
are to support potential control mode. Speed gate operation in potential control mode is described
in Table.8.
Control signal duration at sending control command to control inputs is to be not less than 100 ms.
The passage waiting period equals the control signal duration. i.e. that if by the moment of
passage completion in the permitted direction, there is a low-level signal at the input of this
direction, the speed gate remains open in this direction.
Control command sending algorithm is given in Appendix 2. Sending a low-level signal to Stop
input, both directions are locked for signal duration time independently of signal levels at Unlock A
and Unlock B inputs. Removing low-level signal from Stop input, the directions shift into the modes,
according to signal levels at Unlock A and Unlock B inputs.
Note:
When the speed gate is operated from the ACS, high level
of the control signal corresponds
to the open contacts of the controller output relay or to the closed output transistor. Low
level of the control signal corresponds to the closed contact of the controller output relay or
to the open output transistor.

ST-11 Speed gate, STD-11 Double-sided section
17
5.2.7 Speed gate operation algorithm
Speed gate operation algorithm in pulse control mode in case of single passage in one of the
directions:
1. A command (control signals combination) for single passage performance in one of the
directions is sent from the control device (RC-panel, WRC, ACS-controller) to the control
board inputs.
2. The microcontroller on the control board processes the received combination of signals and
creates a command for the swing panels motor drive to open the passage. The Time of
holding in unlocked state (8 seconds by default) countdown begins.
3. The speed gate swing panels open in the chosen direction. The user can pass through the
speed gate in the chosen direction.
4. Any movement detected in the passageway is registered as a completed passage. PASS A or
PASS B relay output, corresponding to the passage direction, is activated for 80 ms. User’s
location in the passageway is monitored by the intrusion detectors.
Note:
In order to prevent contact with the swing panels, the speed gate is equipped w
ith the
danger zone detection. When user enters the danger zone, the swing panels moving
(opening or closing) is blocked. Danger zone range varies depending on the swing panels
dimensions.
5. After the user passes through the open swing panels he gets into a safe zone (zone, in which
it is impossible to get in contact with the swing panels) and the control board microcontroller
sends a command for the motor drive to close the swing panels. The swing panels get closed.
6. If at the moment of passage performance by the first user, another user’s passage has been
authorized in the same passage direction, the swing panels will not get closed and the new
user will be able to follow the first one.
7. If at the moment of passage performance, another user’s passage has been authorized in the
opposite passage direction, then after the first user’s passage completion the swing panels
will be closed and open in the opposite direction for the second user to pass.
Note:
In order to increase throughput rate, arrangement of separ
ate passage lanes for each
direction is recommended.
8. If the user does not enter the passageway during the Time of holding in unlocked state, the
swing panels will close the passage lane.
9. After the passage is completed and the swing panels are closed, the speed gate is ready for
another passage.
In potential speed gate control mode, the control signal can be released after receiving a signal
from PASS output for the same direction.
5.3 Operating devices
Speed gate operation can be performed through the following devices: RC-panel / WRC;
ACS-controller, Fire Alarm device. These devices can be connected to the speed gate separately,
simultaneously or in any combination with each other.
In case several operating devices are connected simultaneously there can be a control signal
overlap. In this case speed gate will operate according to the command, generated by the signal
combination (Appendixes 1 and 2).
5.3.1 RC-panel connection
RC-panel is connected with a flexible multicore cable to Unlock A, Stop, Unlock B, Led A,
Led Stop, Led B, Sound and GND contacts of the X2 terminal block according to the speed gate
connection layout (Fig. 18).
Standard RC-panel orientation regarding speed gate sections12. If the operator’s workspace is
located on the opposite side regarding Master section, it will be more convenient to change the

Assembly and Operation Manual
18
RC-panel wires, which are connected to Unlock Aand Unlock Bcontacts, as well as Led A and
Led B respectively (Table 4).
Figure. 12 Standard RC-panel orientation regarding sections
Note:
•When the turnstile functions as a part of the ACS
it is recommended to connect the RC to
the ACS controller according to the operational documentation.
•WRC is connected to Unlock A, Stop, Unlock B and GND contacts of the X2
terminal
block and to +12V contact of the X3 terminal block.
Table. 4Connection of RC-panel cable wires to the X2 connector block
№Contact
RC-panel orientation
Standard
Reverse
1
GND
black
black
2
Unlock A
white
green
3
Stop
blue
blue
4
Unlock B
green
white
5
Led A
yellow
red
6
Led Stop
orange
orange
7
Led B
red
yellow
8
Sound
brown
brown
5.3.2 Fire Alarm device
Connect the Fire Alarm emergency passage unlocking device to control board Fire Alarm input
(Fire Alarm and GND contacts of the X2 terminal block) according to the speed gate connection
layout (Fig. 18).
If the Fire Alarm input is not used, a jumper between Fire Alarm and GND contacts of the control
board is to be installed. This jumper is installed by default.
Sending a control signal to Fire Alarm input, the speed gate switches to “Fire Alarm” mode.
•In this mode the following operations take place speed gate swing panel open in the
direction, chosen with FA_Dir switch (Fig.9).
•Green passage permission indicators of the top cover and the central post indication blocks
switch on to the flashing mode with a period of 1.25 sec simultaneously for both directions.
•All the incoming speed gate control commands are ignored.

ST-11 Speed gate, STD-11 Double-sided section
19
If the control signal is sent to Fire Alarm input at the moment of passage performance, the speed
gate turns to “Fire Alarm” mode. The swing panels remain open until the signal release. After control
signal release the “Always locked” command is sent automatically and the swing panels get shut.
5.3.3 Operation from the ACS
Operating as a part of the ACS, the speed gate can serve as an operating device. Speed gate also
provides an opportunity of built-in proximity card readers installation under the section top cover.
ACS-controller outputs are connected to Unlock A, Stop, Unlock B and GND contacts of the X2
terminal block. ACS-controller inputs are connected to PASS A, PASS B and to Common contacts
of the X3 terminal block. Connection is performed in accordance with the speed gate connection
layout (Fig. 18).
5.4 Optional devices connected to the speed gate
The speed gate control board features the following outputs for optional devices connection:
•PASS A, PASS B – for connection to ACS-controller inputs (Sect. 5.4.1).
•ALARM – for siren connection (Sect. 5.4.2).
•Light A and Light B – for external indication blocks connection (Sect. 5.4.3).
5.4.1 PASS outputs
Connection to PASS A, PASS B relay outputs is performed through Pass A, Pass B, Common
contacts of the X3 terminal block on control board in accordance with the speed gate connection
layout (Fig. 18).
Relays have normally open contacts. The Common relay contact is not connected to the speed
gate power supply return. Normalized voltage is not supplied to relay winding.
Outputs are activated at passage registration through speed gate in a corresponding direction.
During the activation process, voltage is supplied on relay winding and relay contacts get closed.
Voltage supply to relay winding is indicated by the red LED light on the control board by the
corresponding relay (if the jumper on the control board is installed on XP3 output).
Pass elements – relay contacts (Fig. 13) with the following signal characteristics:
maximum commutation DC voltage ..................................................................................... 42 V
maximum commutation current ........................................................................................ 0.25 A
closed contact resistance .................................................................................... max 0.15 Ohm
Figure. 13 PASS A, PASS B and Alarm pass elements
5.4.2 Siren
Siren is connected to ALARM relay output on the control board through Alarm 1, Alarm 2, GND
and +12V contacts of the X3 terminal block in accordance with the speed gate connection layout
(Fig. 13, 18).
Normalized voltage is not supplied on relay winding and the relay contacts are open. Output is
activated when intrusion detectors register an unauthorized passage. 9.4). During the activation
process, voltage is supplied on relay winding and relay contacts get closed. Voltage supply to relay
This manual suits for next models
1
Table of contents
Other PERCo Fencing & Gate manuals
Popular Fencing & Gate manuals by other brands

Motorline professional
Motorline professional ECO User's and installer's manual

Petsafe
Petsafe PPA11-14766 PPA11-14767 PPA11-14768 installation guide

Fortress Building Products
Fortress Building Products A2 installation instructions

Horizont
Horizont RANGER N80 operating instructions

Wolpac
Wolpac WOLVISION Technical manual

Stratco
Stratco QUICK SCREEN PLUS Assembly guide