
Fig 2. - Fi ng of Post Supports
Op on 1:
Original Spiked System
Op on 2:
Bolt Down System
Op on 3:
Concrete-in System
x 4 Ankerbolts
included
MOD 5 – ASSEMBLY INSTRUCTIONS
Parts List
A - 4 x Main Beams, scarfed one end, pre-drilled –
2.43mtrs Length
B - 7 x Cross Ra er, scarfed both ends – 2.7mtrs Length
C - 4 x Posts Notched and Pre-Drilled - 2.4mtrs Length
D - 2 x Centre Posts Notched – 2.4mtrs Length
E - 14 x Struts Pre-Drilled
F - 28 x Angle Brackets
G - 4 x Coach Bolt Sets (bolt, washer and nut)
H - 168 x Wood Screws (for angle brackets) 25mm x
No.8
I - 28 x Wood Screws (for struts) 50mm x No.8
J - 2 x ‘T’ Brackets plus non-recessed, self-tapping
screws
K - 6 x Post Fixings (Spike, Concrete-In or Bolt-Down
incl. ankerbolts)
Fig 1. - Module 5
Fig 3. - Marking Out Post Posi ons
With a measure make sure lines
A and B are the same length.
2160mm
2160mm2160mm
Ar s c impression – not to scale
Perfect Pergolas Ltd, PO Box 283
Cirencester, Glos GL7 9EY
t: 0844 800 4703
w: www.perfectpergolas.co.uk
* N.B.: Please take measurement
dimensions to CENTRE of post fi xings.