
7
GB
<Temperature Setting>: Under the working status, press and hold the “ ” key
or “ ” key to set the temperature, press and hold the “ ” key or the “ ” key
to quickly set the temperature; after setting the temperature, have
non-operation for 5 seconds, exit the temperature setting screen. After the
initial use or memory clear, the whole machine runs according to the factory
settings. The default setting temperature is 35° C and the gear position is
high-end.
<Scheduled work>: Tap the timer key “ ”in standby mode to enter the
scheduled work setting screen. Press “ ” key or “ ”key to set the scheduled
time, press “ ” key or “ ”key for along time to quickly set the scheduled time,
and the scheduled time will reach the working status of the machine. The
buzzer will ring with along beep.
<Scheduling standby>: Under the working status, press the timer key “ ” to
enter the scheduling standby setting screen. Press “ ”key or “ ” key to set
the scheduling time, press “ ”key or “ ”key for along time to quickly set the
scheduling time, and the scheduling time is in the standby state to the
machine.
A: The scope of scheduling is for 0~24 hours, and press “ ”key or “ ”key each
time to increase or decrease 1 hour. When the set value is 0H, press the “ ”key
to set the time for 24H. When the set value is 24H, press the " " key, and the
setting time is 0H. When the set value is 0H, the scheduling is canceled. When
the set value is not 0H, the scheduling is started.Set the appointment time,
press the timing key “ ”key or "MODE" key, or without operation for 5
seconds, exit scheduling mode.
B: If the scheduling time is set, press the standby key “ ”to enter the standby
state and cancel the scheduling.
C: After the scheduling is started, press the scheduling key “ ”to check the
remaining time of the appointment and reset the scheduling time. During the
scheduled time, the machine is shut down or started up under temperature
control, and the scheduled time is always normal, and free from down time.
During the scheduled time, it is cleared incase of power failure.
[Inspection before start]
1.The mains power cable should not be damaged or fractured.
2.Check that the rated current of the mains power socket is in line with the
requirements and is equipped with a safety grounding device before use;
otherwise, replace the socket.
[Operating Instructions]
<Work/Standby>: Plug in the power, the buzzer will “beep” for along time, press
the standby key “ ” to enter the high-grade heating working state, and then
press the standby key “ ” to enter the standby state.
<Gear selection>: For work status, press “MODE” key to select one of the work
modes such as high gear, medium gear, low gear and energy saving gear.
OPERATING INSTRUCTION