Posh Domaine User manual

page 11 of 19
Plumbers, please ensure a copy of the installation
instructions is left with the end user for future reference
Domaine Ensuite Floor Mount
PRIOR TO INSTALLATION CHECKLIST
This product must be installed by a qualied tradesperson and we would expect the installation to
be undertaken in a tradesperson like manner and nished to a tradesperson standard. This product
carries a full warranty against faulty workmanship and materials.
Please inspect thoroughly before installation to ensure that the product has not been damaged
and is correct. No claims for damage or incorrect items will be recognised after installation.
Check Products For Any Damages
Positioning & Ventilation
Check for Support Beams
Within 48 hours of receiving your goods, unpack your ADP
product and check for any possible freight damages or incorrect
items.
Please contact your place of purchase to report damages or
missing parts.
No claims for damages will be recognised after installation.
Please note: xing screws/bolts are not supplied for installation.
Planning your bathroom furniture placement is critical.
Furniture must be at least 300mm away from any
wet areas. Materials used in the construction of our
furntiture units are moisture resistant, not water proof.
Do not expose furniture to shower spray.
It is important that your bathroom is adequatley
ventilated to eliminate moisture build up.
High humidity will lead to permanent dampness and
mould resulting in a deterioration of the materials in
your bathroom.
Wall hung furniture & basins require xing to a support
beam tted between the studs to give a solid wall backing
to attach the vanity to.
If necessary, x additional support noggins at desired
height for cabinet and basin xing prior to sheeting the wall.
Ensure total width of support noggin exceeds vanity width.
1
2
3
Ventilation is
important to
prevent mould
& moisture
build up
300mm
(minimum clearance)
BATH
IT IS THE RESPONSIBILITY OF THE INSTALLER TO MAKE ANY ADJUSTMENTS
TO DOORS/DRAWERS AFTER INSTALLATION IF REQUIRED.
page 1 of 9

page 12 of 19
Plumbers, please ensure a copy of the installation
instructions is left with the end user for future reference
Domaine Ensuite Floor Mount
IMPORTANT TIPS
Check for Plumb Walls & Level Floors
Check Plumbing Positions Align with Product Interior Congurations.
4
5
Ensure the wall is plumb and straight, ensure oor is level. If
you x the product to a non-plumb wall or oor the following
could happen:
• Your door or drawers will not operate correctly.
• Door or drawers will not align.
• Basins will not sit level, which may cause water to pool
or not drain properly.
If it is not possible to make the wall or oor plumb and
straight you must pack the vanity out so that it does not
follow the out of aligned wall.
Floor standing vanities must sit on a level oor or be packed
so they sit level and true.
Please note if your vanity is xed to a bowed wall, the
fastening of the xings will force your cabinet to twist and
benchtop materials may crack due to increased stress on
joins and materials.
Please note if your product has any electrical ttings
please allow for this and talk to your electrician
Take note of clearances behind drawers when
considering water supply ttings inside cabinet.
ENSURE ALL TILES EXTEND BEHIND AND BENEATH THE BATHROOM FURNITURE.
ADP do not recommend tiling in furniture due to moisture and mould build up which
can damage the material and void the warranty.
ALL AREAS WHERE CABINET/TOP MEETS WALL AND/OR FLOOR MUST BE
SEALED USING A NEUTRAL CURE SILICONE.
All edges where vanity top meets cabinet, wall or surrounding furniture must be sealed
with a continuous bead of silicone.
IT IS THE RESPONSIBILITY OF THE INSTALLER TO MAKE ANY ADJUSTMENTS TO
DOORS/DRAWERS AFTER INSTALLATION IF REQUIRED.
There may have been some movement in transportation and installation which causes
doors/drawers to become unaligned.
page 2 of 9

page 13 of 19
Plumbers, please ensure a copy of the installation
instructions is left with the end user for future reference
Domaine Ensuite Floor Mount
VANITY INSTALLATION
1. LOCATION
3. LEVELING 4. SECURING THE CABINET
5a. FIX TOP / BASIN 6. SEALING
2. PREPARING THE CABINET
After completing the Prior to Installation Checklist, mark the position of
the top of the vanity. Don’t forget to factor in the top/basin thickness to
get the correct height.
Note: Vanity must attach to a minimum of two support beams, mark
these positions.
Remove doors and drawers. Measure correct plumbing loctions and
drill holes for plumbing in the back panel and/or base of the cabinet with
an appropriate sized hole saw. Pre-drill screw locations for fastening to
wall.
Position the vanity over the pipes in the correct position and x with a
single screw in centre of vanity to hold in place.
Check the vanity is completely level.
Wall Hung vanities: You may want use a level support/noggin to assist
while leveling.
Floor Mount Vanities: You may need to pack the vanity to ensure it is
sitting level & square on the oor.
Using a non-acidic silicone, apply a continuous bead of silicone to the
top four edges of the vanity and at the back where the top meets the
wall. Position the top so it has equal overhang on each side, ensuring
the top surface is level.
If using a seperate basin, position in place and fully seal the basin to the
top /cabinet using a continuous bead of silicone.
Note: Seal any visible gaps between the cabinet and the top and basin
with continuous bead of silicone.
Apply non-acidic silicone to all edges where vanity top and cabinet
meet the wall and oor.
Materials used in the construction of this unit are water resistant NOT
water proof, so all areas need to be sealed to prevent water penetration.
Note: Gap sealant can be used in place of silicone where the unit meets
tiled surfaces.
Securely fasten the vanity to the wall through back of vanity with
appropriate screws/bolts at TOP and BOTTOM of cabinet. Fix the
cabinet through the top left and right hand brackets and evenly space
apart the horizontal xings at a maximum of 300mm apart. For the
bottom start the xing points no further than 100mm from each end of
the cabinet and no higher than 50mm from the base panel.
Note: Where a stud or support beam cannot be located, use an
appropriately sized hollow wall anchor. Vanity must attach to a minimum of
two support beams. Ensure xings clear all water/electrical services in wall.
Front
Back
Diagonal
Sides
LEVEL
All edges
where water
penetration
can occur
SEAL
Equal overhang
300mm 300mm 300mm
page 3 of 9

page 14 of 19
Plumbers, please ensure a copy of the installation
instructions is left with the end user for future reference
Domaine Ensuite Floor Mount
7. ADJUST DOORS & DRAWERS 8. CLEANING
Install drawers and doors back onto cabinet and make adjusments to
align the doors and drawers correctly.
NOTE: IT IS THE RESPONSIBILITY OF THE INSTALLER TO MAKE
ANY ADJUSTMENTS TO DOORS AFTER INSTALLATION.
Clean all building residue from the cabinet. Dry any spillage or leakage
of water on or inside the cabinet during installation.
Note: Ensure drawer runners are free of any debris as this may effect
the operation.
DETACHABLE KICKBOARD INSTALLATION
1. JOIN SIDE PANELS
3. ATTACH CENTRE SUPPORT (FOR LARGER UNITS)
2. JOIN FRONT PANEL
4. JOIN KICKBOARD TO VANITY
Join each side panel with rear panel. Use a phillips head screw driver to
fasten the cam-locks clockwise into the pre-drilled holes.
For larger units (1200mm and bigger), insert the centre support panel
supplied and secure all cams.
Your kickboard is now assembled.
Attach and fasten the front panel to each side panel.
Ensure all cam-locks are fastened.
Note: The cam-locks should be pointing directly up on the front and rear
panel.
Carefully lay vanity unit on its back on a at surface. Using the pre-
drilled holes at the base of the unit as a guide, insert the cam-locks at
the top of the kicboard and fasten to vanity unit.
Note: The cam-locks should be pointing up on the front and rear panel.
FRONT PANEL
REAR PANEL
LH
SIDE
RH
SIDE
page 4 of 9

page 15 of 19
Plumbers, please ensure a copy of the installation
instructions is left with the end user for future reference
Domaine Ensuite Floor Mount
PRESSED METAL DRAWERS
REMOVING & INSERTING DRAWER
DRAWER HEIGHT ADJUSTMENT
DRAWER FRONT REMOVAL
AND INSTALLATION
TROUBLESHOOTING - HOW TO RE-ENGAGE THE SOFT-CLOSE ADAPTER
DRAWER LATERAL ADJUSTMENT
Slide drawer out, lift up and out to remove. Insert drawer on an angle. Align top of metal
sides onto runners in cabinet and push into
place.
Loosen the front screw.
Loosen top and bottom screws on both sides
of drawer.
To remove drawer front: Loosen front screw
on both sides until drawer front comes off.
To install drawer front: Align drawer front
with sides of drawer and tighten front screw to
secure in place.
Soft-close not working?
1. Remove drawer.
2. On inside of cabinet, re-set the trigger by pulling the tab towards the front
of the cabinet.
3. Insert drawer and the soft-close should re-engage.
Note: If this does not solve the problem, your cabinet may not be level or
plumb as there could be an alignment issue.
When drawer height is aligned, tighten the
front screw. Repeat on both sides of drawer if
needed.
When drawer front is aligned, tighten all screws
in place.
Turn the back screw to adjust the height of the
drawer front. Turn anti-clockwise to go up and
clockwise to go down.
Slide drawer front left or right.
FRON T
BACK
REMOVING INSERTING
page 5 of 9

page 16 of 19
Plumbers, please ensure a copy of the installation
instructions is left with the end user for future reference
Domaine Ensuite Floor Mount
PREMIUM SOLID SIDED DRAWERS
REMOVING & INSERTING DRAWER
DRAWER FRONT REMOVAL AND INSTALLATION
To remove drawer front: Turn centre screw
and pull drawer front forwards. Repeat on
other side.
First you will need to remove the Solid or LED drawer side:
Pull drawer all the way out then lift the front up,
a little force is needed to release the drawer
from the runner.
Extend drawer runners out and place drawer
on runners and push closed until it is about
2cm out from the vanity.
Apply a little extra force on the drawer front
(near the bottom of drawer) to push closed.
and connect runners in place.
The drawer should then be automatically
connected to the runner by the two catches.
Listen for a click!
With a screw driver push
into the lug to realease the
side and start pulling up.
Pull the drawer side up and off with
both hands, sliding off the xing
brackets. Repeat on both sides.
Identify plastic lugs - lugs
are at the back of the drawer
on each side at the top.
TOP VIEW
DRAWER FRONT
To replace drawer front: Align front panel with
drawer sides, apply some pressure at the
bottom on both sides and push in to secure.
Slide the drawer sides down onto the xing
brackets until the lug secures side in place.
Repeat on both sides.
Depending on width of drawer you may need
to unscrew and remove middle bracket on the
under side of the drawer.
REMOVING INSERTING
CLICK!
DRAWER HEIGHT ADJUSTMENT LATERAL ADJUSTMENT TILT ADJUSTMENT
Remove ADP cap to access screws.
Turn the back screw to adjust the height of the
drawer front. Turn clockwise to go up and
anti-clockwise to go down.
To move drawer front to the right, turn right
screw clockwise and left screw anti-clockwise.
Turn the opposite way to move to the left.
To tilt drawer front, turn adjustment screws
on inside of drawer at the front and back, on
both sides.
page 6 of 9

page 17 of 19
Plumbers, please ensure a copy of the installation
instructions is left with the end user for future reference
Domaine Ensuite Floor Mount
DOOR HINGE ALIGNMENT
DOOR HINGE INSTALLATION
REMOVING & INSTALLING DOORS
REMOVING HINGE FROM DOOR
REPLACING HINGE ON DOOR
SIDE ADJUSTMENT DEPTH ADJUSTMENT HEIGHT ADJUSTMENT
TO REMOVE DOORS:
Apply nger pressure to clip at back of hinge and pull forward to release.
TO INSTALL DOORS:
Align door hinge with hinge mount on carcass, press back of hinge into place and listen for a
‘click’ to lock the hinge in place. You may need to apply a little force to lock the hinge in place.
Once you have
removed door from
the cabinet, using a
at head screw driver,
lift and release the top
cover plate.
With top cover plate
lifted, place hinge into
position on door and
insert into holes until
ush.
Once secured in position,
click cover plate down to lock
into place.
Pull hinge up and out from
door. You may need to
wiggle the hinge to loosen
and use a little force.
Use front screw to move door to the left or
right, or to level each door.
Use back screw to move door inward or
outward from carcass.
Loosen the top and bottom screw on mount
plate, adjust door height by moving door up
or down, then retighten screws.
page 7 of 9

page 18 of 19
Plumbers, please ensure a copy of the installation
instructions is left with the end user for future reference
Domaine Ensuite Floor Mount
UNIVERSAL PLUG & WASTE INSTALLATION
1) Remove washers and removable plug (A) & check waste ts in hole.
2) For ceramic basins - Place thin foam washer (C) in position under rim of Waste Neck (B) & seal in place with a
non-acidic silicone. For all other basin material types, you do not need foam washer (C) before sealing in place.
3) Insert into centre of waste hole.
4) Insert Rubber Washer (D) on top of section (E) and screw on (hand tight only).
5) Insert Removable Plug (A) into the Waste Neck (B), ensuring you align the grooves until the waste is seated &
locked into place.
Please Note: Ensure Rubber Seal (A.2) and O-Ring (A.3) are installed on Removable Plug (A) in order to provide
a watertight seal.
IMPORTANT
Avoid overtightening
waste to prevent stress &
damage to the basin or top
HAND TIGHTEN ONLY
Must be sealed with
NON-ACIDIC
silicone sealant
TO INSTALL
Note: All plumbing components must be installed by a licensed plumber.
B
A.
C
D
E
A.2 Rubber Seal
Waste Neck
Thin Foam Washer
Thick Rubber Washer
Threaded Connector (40mm)
A.3 O-Ring
Removable Plug
Simply align & insert
It’s that easy!
Ensure Rubber Seal & O-Ring
are in position on removable plug.
A.3 O-Ring
A.2 Rubber Seal
page 8 of 9

page 19 of 19
Plumbers, please ensure a copy of the installation
instructions is left with the end user for future reference
Domaine Ensuite Floor Mount
CARE & MAINTENANCE
If you cannot identify basin, top or cabinet material of your product, contact your merchant or see product information at www.adpaustralia.com.au.
TIPS
• ADP products are produced from materials that are well suited to the bathroom, however it is important that your bathroom
has sufcient ventilation to avoid excessive moisture. High humidity will lead to permanent dampness and mould, resulting
in deterioration of the materials.
• Care must always be taken to dry any excessive moisture or water spillage.
CABINETS
• To maintain the nish on your cabinet use only a soft cloth and weak solution of non abrasive detergent.
• To remove scratches, marks, etc. on two pack polyurethane, rub gently with car cutting compound, car polish or household
brass/silver cleaner.
• Goods used in construction are water/moisture-resistant, but not water-proof.
• All cabinets should be installed at least 300mm away from showers or bathtubs to avoid water damage.
ACRYLIC TOPS
• To maintain the nish on your Acrylic top use only a soft cloth and weak solution of non-abrasive detergent.
• To remove scratches, marks, etc. rub gently with car cutting compound, car polish or household brass/silver cleaner.
CERAMIC TOPS
• To maintain the nish on your ceramic top use only a soft cloth and weak solution of non abrasive detergent.
• Due to the glazed surface of ceramic tops, scratches cannot be repaired or removed.
• Due to ceramic being a handcrafted product that is red at high temperatures, some visual distortion may occur. This is not
a defect but can be seen to add to the beauty of the product.
CHERRY PIE / FRIDAY HYBRID QUARTZ
• Wipe clean with a soft damp cloth or sponge.
• For basic stains clean with mild detergents. For gloss and semi-gloss surfaces you can use a non abrasive polish or Brasso.
For matte surface use a scourer pad or scotch bright to maintain the matte nish.
• Cherry Pie and Friday Hybrid Quartz™ benchtops have excellent heat and chemical resistant properties compared to other
surfacing products, however to preserve the surface and protect against damage from heat, do not place hot items directly
on the surface. Even though Cherry Pie and Friday™ can withstand high temperatures, prolonged periods or extreme heat
can cause permanent damage.
BAMBOO
• Use a soft dry microber cloth and mild detergent. Remove residual detergent with a damp cloth.
• All spills should be cleaned immediately. Dry the surface with a soft, clean dry cloth to remove all water and to reduce
streaking.
• A non-abrasive household cleaner may be used.
page 9 of 9
Other manuals for Domaine
2
Table of contents
Popular Indoor Furnishing manuals by other brands

Next
Next Harper Highsleeper Assembly instructions

Round Hill Furniture
Round Hill Furniture B132D Assembly instruction

Otto
Otto MONA 33 Assembly instructions

Sister Bay
Sister Bay Newport 36-1 manual

BED BATH & Beyond
BED BATH & Beyond WF311144AAK Assembly instructions

Furniture of America
Furniture of America Potterville CM-DK6490 Assembly instructions

Unfinished Furniture of Wilmington
Unfinished Furniture of Wilmington S-192 Assembly instructions

Ameriwood HOME
Ameriwood HOME 5323321COM Assembly instructions

ATOMI
ATOMI AT1372 user manual

kitko
kitko 600mm BASE CABINET Assembly instructions

Jahnke
Jahnke LIBRE C 155 E manual

The Land of Nod
The Land of Nod Terrace Bunk Bed Assembly instructions