Floor Mounted Active Beam
ACBC Series
v300 –Issue Date: 07/16/20
© 2020 Price Industries Limited. All rights reserved.

FLOOR MOUNTED ACTIVE BEAM
TABLE OF CONTENTS
204.669.4220
priceindustries.com
APPLICATION SUPPORT
Having difficulty installing this product?
Price is here to help.
Installation Instructions
Before You Start ............................................................ 1
Maintenance ................................................................. 1
Required Tools/Parts ..................................................... 3
Dimensional Data........................................................... 3
Installation ..................................................................... 5
Water System Preparation ............................................. 7
Air System Preparation .................................................. 7
Damper Installation ........................................................ 8
Interpretation of Beam Tag............................................. 9
Airflow Calibration Chart for 3ft ACBC.......................... 10
Airflow Calibration Chart for 4ft ACBC.......................... 11
Airflow Calibration Chart for 5ft ACBC.......................... 12
Airflow Calibration Chart for 6ft ACBC.......................... 13
Airflow Calibration Chart for 7ft ACBC.......................... 14
Installing an Active Bookshelf....................................... 15
Installing an Inactive Bookshelf..................................... 20
Installing a Filler Section............................................... 24
Installing a Utility Cabinet ............................................. 28

ACBC
Before You Start
Inspect all cartons and boxes for flaws and shipping damage.
If shipping damage has occurred, take photos and contact the
shipping company to file a freight claim immediately.
Ensure all tools (as listed on the following page) are on site and
ready for use.
A minimum of two (2) people are required for safe installation.
ACBC:
• 1 or 2 way discharge units
• Vertical Coil
• 13.5 inch depth
• 60 to 87.438 inch length
Handling
• Avoid introducing contaminants into the unit; such
as dust or dirt. Keep the induction grille face, the
duct inlet, and the water connection piping covered
at all times during the installation process.
• To avoid smudging the unit while handling, the use
of clean white cotton gloves is recommended.
• Storage of the units should be in a covered, dry
location while waiting for installation. Location should
be cleaned of excess dust before installation.
Typical installation on the floor
Determine where beams should be located using building
drawings and identification tags on schedule and units. Ensure
the beam’s length, nozzle size, number of pipe connections,
pipe circuiting, duct size, duct inlet location and air discharge
configuration (1 way or 2 way) match the requirements
specified for that particular beam by cross referencing the Price
provided schedule, the order linestring and line instructions
with the units that are on site.
Maintenance
Maintenance required is accessing the coil from the room side
through the removable face and vacuuming the water coil with
a soft bristle brush based on space and owner requirements.
Maintain water conditions which prevent corrosion of copper
tubing and ensure that safeguards against air accumulation
through leaks or oxygen diffusion in system piping are
functioning.
If included in the system design, check the condensate
sensor(s) or humidity sensor(s) according to sensor
manufacturer’s methods and schedule.
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
1www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual

L
LEFT SIDE INLET
R
RIGHT SIDE INLET
LR
LEFT & RIGHT SIDE DUAL INLET
TL
TOP LEFT CASING OPENING
WITH LEFT SIDE INLET
TR
TOP RIGHT CASING OPENING
WITH RIGHT SIDE INLET
TLR
TOP LEFT CASING OPENING
WITH LEFT & RIGHT SIDE DUAL INLET
TRL
TOP RIGHT CASING OPEN
WITH LEFT & RIGHT SIDE DUAL INLET
ACBC
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
2FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com

Required Tools/Parts
To be supplied by contractor
• Laser Level
• Cordless Drill/Impact
• Damp cloth(s) (for cleaning)
• Tape Measure
• Clamps/Locking Plier
• Wood Blocks
• Mounting Screws
Dimensional Data
DIMENSIONAL DATA
OF REV: 0
SHEET
Solid Edge
26
ACBC
ACTIVE CHILLED BEAM
CABINET
2019/04/29
PROJECT:
ENGINEER:
CUSTOMER:
SUBMITTAL DATE: SPEC. SYMBOL:
©
Copyright PRICE INDUSTRIES 2018
Submittal Sheet
ACTIVE CHILLED BEAM CABINET
270567
KHH
ACBC-1-1
ACBC 1-WAY
13 1/2"
25 3/8"
WALL
MOUNT
9 7/8"
INLET
2 11/16"
INLET
OVERALL LENGTH (L)
30"
3 9/16"
13 11/16"
WATER COIL
8 3/4"
WATER COIL
8 5/8" TYP.
WATER COIL
9 1/4"
DRAIN PIPE
(OPTION)
10 5/8"
DRAIN PIPE
(OPTION)
1 1/2" TYP.
WALL MOUNT
5 1/8"
FIN TUBE HEATER
(OPTION)
3 5/8"
FIN TUBE HEATER
(OPTION)
OVERALL LENGTH / ACTIVE COIL LENGTH / INLET OPTION CONFIGURATIONS:
3 1/2" TYP. WALL MOUNT
OVERALL LENGTH (L) ACTIVE COIL
LENGTH (CL)
INLET LOCATION
36.000 L, R, LR, TL, TR, TLR, TRL
60.000 L, R, LR
36.000 L, R, LR, TL, TR, TLR, TRL
60.000 L, R, LR
48.000 L, R, LR, TL, TR, TLR, TRL
72.000 L, R, LR
60.000 L, R, LR, TL, TR, TLR, TRL
84.000 L, R, LR
72.000
87.438 (2000)
60.000
67.750 (1500)
9 3/4"
PIPING
OPENING
2 3/4"
PIPING
OPENING
ACBC 2-WAY
13 1/2"
8 9/16" TYP.
WATER COIL
25 3/8"
WALL
MOUNT
1 1/2" TYP.
WALL MOUNT
9 1/4"
DRAIN PIPE
(OPTION)
9 7/8"
INLET
2 11/16"
INLET
10 5/8"
DRAIN PIPE
(OPTION)
13 11/16"
WATER COIL
6 1/4"
WATER COIL
1 5/8"
WATER COIL
3 3/4"
WATER COIL
3 1/2" TYP. WALL MOUNT
9 3/4"
PIPING
OPENING
2 3/4"
PIPING
OPENING
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
3www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual

DIMENSIONAL DATA
OF REV: 0
SHEET
Solid Edge
66
ACBC
ACTIVE CHILLED BEAM
CABINET
2019/04/29
PROJECT:
ENGINEER:
CUSTOMER:
SUBMITTAL DATE: SPEC. SYMBOL:
©
Copyright PRICE INDUSTRIES 2018
Submittal Sheet
ACTIVE CHILLED BEAM CABINET
270567
KHH
ACBC-1-1
MQ6 - 6" DAMPER W/
MANUAL LOCKING QUADRANT
MQ8 - 8" DAMPER W/
MANUAL LOCKING QUADRANT
•
•
VAV6 - 6" DAMPER W/ 24VAC
FLOATING POINT ACTUATOR
VAV8 - 8" DAMPER W/ 24VAC
FLOATING POINT ACTUATOR
•
•
O
+ 1/2"
O
+ 1/2"
*SEE SUBMITTAL 255245 FOR AVAILABLE FIXED
VOLUME FLOW REGULATORS
INLET DAMPER / VOLUME FLOW FLOW REGULATOR (SHIPPED LOOSE):
(DAMPERS SHOULD NOT BE MOUNTED DIRECTLY TO THE INLET
AND SHOULD ONLY BE USED FOR TRIMMING AIRFLOW)
VAV6 - 6" ACTUATED DAMPER
VAV8 - 8" ACTUATED DAMPER
MQ6 - 6" DAMPER W/ MANUAL LOCKING QUADRANT
MQ8 - 8" DAMPER W/ MANUAL LOCKING QUADRANT
FIN TUBE HEATER (ONLY SELECTABLE FOR 1-W DISCHARGE):
FTH - FIN TUBE HEATER (1" NOM. COPPER TUBE. FLARED ONE END TO ACCEPT 1" NOM. COPPER TUBE)
STANDARD
•
•
FIN TUBE HEATER
•
•
5 1/8"
3 5/8" FIN TUBE HEATER
VFR6-105 - 6" DUCT VFR, 105 CFM
VFR6-125 - 6" DUCT VFR, 125 CFM
VFR6-140 - 6" DUCT VFR, 140 CFM
VFR6-160 - 6" DUCT VFR, 160 CFM
VFR6-175 - 6" DUCT VFR, 175 CFM
VFR8-125 - 8" DUCT VFR, 125 CFM
VFR8-140 - 8" DUCT VFR, 140 CFM
VFR8-160 - 8" DUCT VFR, 160 CFM
VFR8-175 - 8" DUCT VFR, 175 CFM
VFR8-205 - 8" DUCT VFR, 205 CFM
VFR8-235 - 8" DUCT VFR, 235 CFM
VFR8-265 - 8" DUCT VFR, 265 CFM
VFR8-295 - 8" DUCT VFR, 295 CFM
OF REV: 0
SHEET
Solid Edge
56
ACBC
ACTIVE CHILLED BEAM
CABINET
2019/04/29
PROJECT:
ENGINEER:
CUSTOMER:
SUBMITTAL DATE: SPEC. SYMBOL:
©
Copyright PRICE INDUSTRIES 2018
Submittal Sheet
ACTIVE CHILLED BEAM CABINET
270567
KHH
ACBC-1-1
SIDE CASING ACCESS
(FOR WATER PIPES, DUCT, AND MOUNTING WOOD BLOCKS TO PASS THROUGH):
SCA-L - SIDE CASING ACCESS LEFT
SCA-R - SIDE CASING ACCESS RIGHT
SCA-LR - SIDE CASING ACCESS LEFT & RIGHT
SCA-NA - SIDE CASING ACCESS NOT AVAILABLE
SCA-R
SIDE CASING ACCESS RIGHT
••
SCA-LR
SIDE CASING ACCESS LEFT & RIGHT
••
SCA-L
SIDE CASING ACCESS LEFT
••
LEFT RIGHT
RIGHT
LEFT RIGHT
LEFT LEFT RIGHT
SCA-NA
SIDE CASING ACCESS NOT
AVAILABLE
••
ACTIVE COIL LENGTH SECTION
CORE SHIFT
(ONLY SELECTABLE FOR FOLLOWING OVERALL LENGTH /
ACTIVE COIL LENGTH COMBINATION LISTED BELOW):
SL - SHIFT LEFT
SR - SHIFT RIGHT
SL - SHIFT LEFT
•
•
SR - SHIFT RIGHT
••
ACTIVE COIL LENGTH SECTION
OVERALL LENGTH
ACTIVE COIL LENGTH
A
60.000 36.000 23.500
67.750 (1500) 36.000 27.500
72.000 48.000 23.500
87.438 (2000) 60.000 25.500
A
A
OF REV: 0
SHEET
Solid Edge
56
ACBC
ACTIVE CHILLED BEAM
CABINET
2019/04/29
PROJECT:
ENGINEER:
CUSTOMER:
SUBMITTAL DATE: SPEC. SYMBOL:
©
Copyright PRICE INDUSTRIES 2018
Submittal Sheet
ACTIVE CHILLED BEAM CABINET
270567
KHH
ACBC-1-1
SIDE CASING ACCESS
(FOR WATER PIPES, DUCT, AND MOUNTING WOOD BLOCKS TO PASS THROUGH):
SCA-L - SIDE CASING ACCESS LEFT
SCA-R - SIDE CASING ACCESS RIGHT
SCA-LR - SIDE CASING ACCESS LEFT & RIGHT
SCA-NA - SIDE CASING ACCESS NOT AVAILABLE
SCA-R
SIDE CASING ACCESS RIGHT
••
SCA-LR
SIDE CASING ACCESS LEFT & RIGHT
••
SCA-L
SIDE CASING ACCESS LEFT
••
LEFT RIGHT
RIGHT
LEFT RIGHT
LEFT LEFT RIGHT
SCA-NA
SIDE CASING ACCESS NOT
AVAILABLE
••
ACTIVE COIL LENGTH SECTION
CORE SHIFT
(ONLY SELECTABLE FOR FOLLOWING OVERALL LENGTH /
ACTIVE COIL LENGTH COMBINATION LISTED BELOW):
SL - SHIFT LEFT
SR - SHIFT RIGHT
SL - SHIFT LEFT
••
SR - SHIFT RIGHT
•
•
ACTIVE COIL LENGTH SECTION
OVERALL LENGTH
ACTIVE COIL LENGTH
A
60.000 36.000 23.500
67.750 (1500) 36.000 27.500
72.000 48.000 23.500
87.438 (2000) 60.000 25.500
A
A
OF REV: 0
SHEET
Solid Edge
56
ACBC
ACTIVE CHILLED BEAM
CABINET
2019/04/29
PROJECT:
ENGINEER:
CUSTOMER:
SUBMITTAL DATE: SPEC. SYMBOL:
©
Copyright PRICE INDUSTRIES 2018
Submittal Sheet
ACTIVE CHILLED BEAM CABINET
270567
KHH
ACBC-1-1
SIDE CASING ACCESS
(FOR WATER PIPES, DUCT, AND MOUNTING WOOD BLOCKS TO PASS THROUGH):
SCA-L - SIDE CASING ACCESS LEFT
SCA-R - SIDE CASING ACCESS RIGHT
SCA-LR - SIDE CASING ACCESS LEFT & RIGHT
SCA-NA - SIDE CASING ACCESS NOT AVAILABLE
SCA-R
SIDE CASING ACCESS RIGHT
••
SCA-LR
SIDE CASING ACCESS LEFT & RIGHT
••
SCA-L
SIDE CASING ACCESS LEFT
••
LEFT RIGHT
RIGHT
LEFT RIGHT
LEFT LEFT RIGHT
SCA-NA
SIDE CASING ACCESS NOT
AVAILABLE
••
ACTIVE COIL LENGTH SECTION
CORE SHIFT
(ONLY SELECTABLE FOR FOLLOWING OVERALL LENGTH /
ACTIVE COIL LENGTH COMBINATION LISTED BELOW):
SL - SHIFT LEFT
SR - SHIFT RIGHT
SL - SHIFT LEFT
••
SR - SHIFT RIGHT
••
ACTIVE COIL LENGTH SECTION
OVERALL LENGTH
ACTIVE COIL LENGTH
A
60.000 36.000 23.500
67.750 (1500) 36.000 27.500
72.000 48.000 23.500
87.438 (2000) 60.000 25.500
A
A
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
4FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com

Installation
Handling Prior to Installation
• Avoid introducing contaminants into the unit.
• When handling the unit, we recommend wearing
clean, white cotton gloves to avoid smudging.
• Store the units in a covered, dry location while
waiting for installation. Location should be
cleaned of excess dust before installation.
Pre-Installation Review
Read manual in its entirety before installation. Determine
where the beams should be located. The beam construction
determines the beam performance. Ensure the following match
the beam schedule:
• Length
• Nozzle size
• Number of pipe connections
• Coil handing
• Coil circuiting
• Inlet size and location
Unit Installation
STEP 1 – INSTALL BLOCKING
ACBC active beams come standard with mounting brackets
that utilize blocking to secure the beam to the wall. The
location of the mounting brackets is shown on page 3.
Secure blocking that runs across the wall at the height of the
beam mounting brackets. The blocking should be securely
fastened to the stud wall or similar structure. Blocking and
fasteners are by others. Please see Figure 2.
It is recommended to perform a dry fit installation at this stage
to ensure blocking and mounting bracket alignment. Remove
the face of the beam using a 4mm hex key for the ¼ turn
latches and set aside on a clean, flat surface to avoid damage.
Place beam in desired location against the wall and blocking
and verify proper alignment. The ACBC can then be removed
for installation of the water headers in between the blocking.
NOTE: Multiple ACBC can be installed continuously along
a wall. All units should be dry fit together to ensure proper
alignment and location of inlet and water. If piping and air
connections require additional space between wall and chilled
beam, consider using flashing pieces to cover gap. Flashing
pieces by others.
FIGURE 1: MOUNTING BRACKETS
FIGURE 2: UNIT ALIGNMENT
ACBC 1-WAY
WALL MOUNTING
BRACKETS
ACBC 2-WAY
WALL MOUNTING
BRACKETS
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
5www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual

STEP 2 – INSTALL WATER HEADERS
The ACBC is designed with a recessed cavity on the rear of
the beam to accommodate water supply and return headers.
Install headers securely to the wall, as shown in Figure 2.
Ensure piping fits within recessed cavity. See previous pages
for dimensions.
The ACBC can be supplied with a right hand or left hand water
coil connection. These can be plumbed using sweat, NPT or
push on connections. The beams are to be piped in parallel to
maintain the scheduled inlet water temperature. The final water
connections are completed in Step 4.
STEP 3 – SECURE THE ACBC TO THE BLOCKING
With the face removed, the mounting brackets will be visible
on either side of the beam, as shown on right. Position the
ACBC in the desired location according to the approved plans.
Ensure the casing is flush against the wall. The mounting
brackets should then be securely fastened to the blocking.
STEP 4 – CONNECT THE WATER
SUPPLY AND RETURN LINES
Connect the supply and return piping to the beam water
coil. Hard pipe connections or flexible hose can be used. As
water lines are being connected, ensure geometry allows for
installation of any accessories on following pages.
STEP 5 – CONNECT THE CONDENSATE
LINE (IF APPLICABLE)
Connect the drain line to the buildings drain return;
connections can be made with either hard pipe or flexible
hose. Ensure a water tight connection is made.
STEP 6 – CONNECT THE AIR INLET COLLAR
Connect the supply air to the ACBC inlet collar. The air
connection can be made with either hard duct or flex duct.
Ensure an airtight connection to achieve desired performance.
As air inlets are being connected, ensure geometry allows for
installation of any accessories on following pages.
STEP 7 – CONNECTING ADDITIONAL
BEAMS (IF APPLICABLE)
It is acceptable to duct multiple beams in series. Use field
supplied duct interconnects to attach adjacent beams
together.
UNIT ALIGNMENT
ACBC 1 WAY
ACBC 2 WAY
MOUNTING
BRACKETS
MOUNTING
BRACKETS
COLD WATER
RETURN
COLD WATER
SUPPLY
HOT WATER
RETURN
HOT WATER
SUPPLY
COLD WATER
RETURN
COLD WATER
SUPPLY
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
6FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com

Water System Preparation
• Water connection options:
– Sweat, Threaded, Push Connect.
• Before connecting beams to the water system,
flush and drain the water main piping to remove
contaminants from the construction process.
• Pressure test the water system for
leaks. Isolate and fix leaks.
Water Balancing - Manual
• Adjust balancing valves based on fluid flow rates
scheduled on Price performance data.
Water Balancing - Auto/Pressure Independent
• Ensure correct pressure independent valves are
installed based on design drawings. Confirm the
correct flow rate is on the correct branch. (i.e. hot
waterflow rate going through hot water coil.)
Air System Preparation
• Ensure an air tight connection between the supply duct
and the active beam. Duct connections are recommended
to meet SMACNA class B standard up to 2 in. w.g.
• Air connections will ideally have straight duct sections
upstream of the air inlet. Although bends in the duct
are permitted close to the air inlet, there should be
3 duct diameters straight leading into inlet to ensure
laminar flow only straight ductwork connections
will yield a reliable pressure port measurement.
Air Balancing
• Measure static pressure in the plenum of the
active beam by connecting a static pressure
measurement device to the port included on the
beam. The pressure port is located inside the
discharge slot, near the end of the beam.
• Adjust balancing damper to match the Price project
schedule static pressure to the measured result.
• Damper should be used for trimming only.
• Contact the Price Application Engineering
department for high altitude locations.
• See Air flow calibration charts on pg 9. Chilled
beams should be balanced based on active
length of water coil, not casing size.
NOTE: Traversing the duct work before a beam will not
guarantee that the beam is properly balanced because
performance is based on internal plenum pressure.
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
7www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual

DAMPER INSTALLATION
VAV DAMPER
MQ DAMPER
Damper Installation
Select the appropriate MQ/VAV Damper
required for the location based on the
diameter of the unit or zone duct.
The MQ/VAV damper should always be
installed in locations that are accessible
for inspection and removal if necessary.
In order to avoid additional noise in the
occupied space:
1. The MQ/VAV damper should be
installed at least 5 duct diameters
upstream of the active beam.
2. The MQ/VAV damper should be
used as a trimming damper and not
a balancing damper.
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
8FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com

Interpretation of Beam Tag
All beams come shipped with a tag on the unit and on the outer packaging. This tag should be checked to ensure that the beam is
placed in the proper location, and contains the correct options.
1Model
2Discharge (2W: 2-Way, 1W: 1-Way)
3Casing Length (in.)
4Coil Length (in.)
5Nozzle (1W only)
6Coil Type
7Coil Connection
8Coil Orientation
9Fin Tube Heater (Option, 1W only)
10 Inlet Size
11 Inlet Location
12 Damper Type
13 Core Shift
14 Side Panel
15 Face Style (P: Perforated, G: Grille)
16 Drain Pan
17 Insulation
18 Protection Film
19 Finish
1Model
2Active / Inactive Bookshelf
3Length (in.)
4Inlet Locations
5FInish
1Model
2Length (in.)
3Inlet Locations
4FInish
1Model
2Length (in.)
3FInish
ACBC-1-1/I/1W//72.00/48.000/////504/2P1C-NODV/SWT/LH//FTH///8E/L/VFR8-160/SL/LRO//P//////DP///////INT///////PF/B12
Bookshelf Linestring
ACBCBK-1-1/S/I/AB/24.000/LR/B12
Filler Panels Linestring
ACBCUC-1-1/I/24.000/LR/B12
Utility Cabinet Linestring
ACBCFL-1-1/I/24.000/B12
0 75992500210001 8001
ORDER
744629 LINE
1UNIT
1PART
ASECTION
1/6 TAG: (EXAMPLE)
1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 19
1 1 12 2 23 3 34 45
ACBC Linestring
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
9www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual

Airflow Calibration Chart for 3ft ACBC
Plenum Static Pressure (in. w.g.)
Primary Air Flow at Sea Level (SCFM)
1009080706050403020100
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
2-WAY
SIZE 70 - 1 WAY
SIZE 50 - 1 WAY
NOTE: Data presented for Standard Atmosphere at sea level
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
10 FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com

Airflow Calibration Chart for 4ft ACBC
Plenum Static Pressure (in. w.g.)
Primary Air Flow at Sea Level (SCFM)
50403020100
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
60 70 80 90 100 110 120 130 140 150
2-WAY
SIZE 70 - 1 WAY
SIZE 50 - 1 WAY
NOTE: Data presented for Standard Atmosphere at sea level
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
11www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual

Airflow Calibration Chart for 5ft ACBC
Plenum Static Pressure (in. w.g.)
Primary Air Flow at Sea Level (SCFM)
50403020100
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
60 70 80 90 100 120 140 160 180
110 130 150 170 190
2-WAY
SIZE 70 - 1 WAY
SIZE 50 - 1 WAY
NOTE: Data presented for Standard Atmosphere at sea level
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
12 FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com

Airflow Calibration Chart for 6ft ACBC
Plenum Static Pressure (in. w.g.)
Primary Air Flow at Sea Level (SCFM)
100806040200
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
120 140 160 180 200 220 240
2-WAY
SIZE 70 - 1 WAY
SIZE 50 - 1 WAY
NOTE: Data presented for Standard Atmosphere at sea level
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
13www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual

Airflow Calibration Chart for 7ft ACBC
Plenum Static Pressure (in. w.g.)
Primary Air Flow at Sea Level (SCFM)
75604530150
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
90 105 120 135 150 165 180 195 210 225 240 255 270 285
2-WAY
SIZE 70 - 1 WAY
SIZE 50 - 1 WAY
NOTE: Data presented for Standard Atmosphere at sea level
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
14 FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com

Installing an Active Bookshelf
Bookshelf (Active) Parts
List Quantity of parts per beam:
A. (1) Bookshelf
B. (1) Back Panel
C. (1) Access Door
D. (6) Screws
E. (1) 4mm Allen Key A. (1) BOOKSHELF B. (1) BACK PANEL
C. (1) ACCESS DOOR
E. (1) 4MM ALLEN KEY
D. (6) SCREWS
BOOKSHELF PARTS
SCREW IN
SCREW IN
E
DETAIL E
FRONT OF UNIT
Figure 6
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
15www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual

Casing Length
24.000
30.000
36.000
ACTIVE BOOKSHELF
OF REV: 0
SHEET
Solid Edge
23
ACBCBK
ACTIVE CHILLED BEAM
CABINET BOOKSHELF
2019/04/29
PROJECT:
ENGINEER:
CUSTOMER:
SUBMITTAL DATE: SPEC. SYMBOL:
©
Copyright PRICE INDUSTRIES 2018
Submittal Sheet
ACTIVE CHILLED BEAM CABINET BOOKSHELF
270571
KHH
ACBCBK-1-1
WALL MOUNTING
BRACKETS
ACTIVE BOOKSHELF SHOWN
30.000
CASING LENGTH 13.500
INACTIVE BOOKSHELF SHOWN
30.000 WALL MOUNTING
BRACKETS
CASING LENGTH
24.000
30.000
36.000
CASING
LENGTH
3.545
3.545
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
16 FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com

Bookshelf (Active) Installation for
ACBC
Step 1: Determine bookshelf locations
and orientation according to approved
plans.
Step 2: Secure blocking that runs
across the wall at the height of the
bookshelf mounting brackets. The
blocking should be securely fastened
to the stud wall or similar structure.
Blocking and fasteners provided by
others.
Step 3: Place the bookshelf flush
against the wall and connecting unit(s)
pictured in Figure 3.
Step 4: Open access door by using
4mm allen key and turn both spring
latches to the left until access door is
opened pictured in Figure 4.
FIGURE 3
FIGURE 4
ROTATE
WALL
A
DETAIL A
Figure 2
Figure 1
ACTIVE
BOOKSHELF
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
17www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual

FIGURE 5
FIGURE 6
Step 5: Locate the bottom mounting
brackets and secure bookshelf with two
screws, reference Figure 5.
Step 6: Remove the two screws from
the back panel, pictured in Figure 6. Do
not discard screws.
Step 7: Place hands in both slots in the
back panel and lean the top part of the
panel towards you and remove the back
panel, as pictured in Figure 6. Do not
discard back panel, place it on a clean
and flat surface.
SECURE
BOTH SCREWS
B
DETAIL B
ROTATE AND LIFT
PLACE HANDS HERE
D
DETAIL D
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
18 FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com