Raychem RayClic-PC User manual

Approvals
Description
These kits are for use with Raychem IceStop, XL-Trace and HWAT heating
cables. The connection is designed to be strapped to the pipe or mounted
on the wall at the start of the heating cable circuit. These installation
instructions should be used in conjunction with the IceStop, XL-Trace
and HWAT System Installation and Operation Manuals. For technical
support, contact your Tyco Thermal Controls representative or call Tyco
Thermal Controls (800) 545-6258.
Tools Required
• Utility knife • Wire cutters
• TORX® T20 screw driver • Wrenches (2)
Additional UL Listed or CSA Certified materials required:
• 1/2-inch conduit and fittings • Junction box
Optional Accessories (not included in this kit):
• RayClic-SB-02 Wall mounting bracket
RayClic
®
F
M
APPROVED
withHWAT, IceStop,
andXL-Trace heating
cables.
CLI, Div. 2, Gr. A,B,C,D
HazardousLocations
withGM-XT only.
WARNING:
Do not open while energized
Shock Hazard
718KPipe Heating Cable
alsoListed De-icing and
SnowMelting Equipment
-W
A B C ED F
A B C ED F
A B C ED F
G
G
G
This component is an electrical device that must be
installed correctly to ensure proper operation and to
prevent shock or fire. Read these important warnings
and carefully follow all the installation instructions.
• Tominimizethedangeroffirefromsustainedelectrical
arcing if the heating cable is damaged or improperly
installed, and to comply with the requirements of Tyco
Thermal Controls, agency certifications, and national
electrical codes, ground-fault equipment protection
must be used. Arcing may not be stopped by conven-
tional circuit breakers.
• Buswireswillshortiftheycontacteachother.Keep
bus wires separated.
• Keepcomponentsandheatingcableendsdrybefore
and during installation.
• Theblackheatingcablecoreisconductiveandcan
short. It must be properly insulated and kept dry.
• Componentapprovalsandperformancearebasedon
the use of Tyco Thermal Controls-specified parts only.
Do not use substitute parts or vinyl electrical tape.
• Leavetheseinstructionswithenduserforreference
and future use.
A B C ED F
A B C ED F
A B C ED F
G
G
G
A B C ED F
A B C ED F
A B C ED F
G
G
G
RayClic Connection System
RayClic-PCPowerConnectionandEndSealKit
RayClic-PSPoweredSpliceandEndSealKit
RayClic-PTPoweredTeeandEndSealKit
Installation Instructions
RayClic-PSPoweredSpliceKit
Item Qty Description ItemQty Description
A 1 Powered splice D 2 Clips
B 1 Pipe mounting bracket E 2 End seals
C 2 Plastic cable ties F 4 Labels (1 HWAT, 1 De-Icing &
Snow Melting, 2 Warning)
G 1 Cable lubricant
RayClic-PTPoweredTeeKit
Item Qty Description ItemQty Description
A 1 Powered splice D 3 Clips
B 1 Pipe mounting bracket E 3 End seals
C 2 Plastic cable ties F 4 Labels (1 HWAT, 1 De-Icing &
Snow Melting, 2 Warning)
G 1 Cable lubricant
KitContents
RayClic-PCPowerConnectionKit
Item Qty Description ItemQty Description
A 1 Power connection D 1 Clip
B 1 Pipe mounting bracket E 1 End seal
C 2 Plastic cable ties F 4 Labels (1 HWAT, 1 De-Icing &
Snow Melting, 2 Warning)
G 1 Cable lubricant
718K Pipe Heating Cable
877Z De-Icing and Snow Melting
Not UL Listed with XL-Trace
heating cable for buried piping.
APPROVED
-w
For HWAT, IceStop, and XL-Trace only
Hazardous Locations: For IceStop (GM-XT) only
Class I, Div. 2, Groups A,B,C,D

2
RayClic-PC, RayClic-PS, RayClic-PT Installation Instructions
54
• Score around and down the outer jacket of the heating cable
3 1/8 inches from the end.
• Remove the outer jacket.
• Place the metal clip over the base of the exposed braid.
Do not cut through
metal braid or
inner jacket.
12A
32B
• Using the plastic cable ties, attach* the bracket to the pipe.
• For the RayClic-PS powered splice and the RayClic-PT powered
tee, fold up two center snaps, then position the connector over the
snaps and press down.
• Allow enough extra heating cable to make service loops as required.
• Make sure the end of the heating cable is cut clean.
• For the RayClic-PC power connection, fold up the four outer snaps,
then position the connector over the snaps and press down.
Power Connection, Splice and Tee Installation
3 1/8"
1"
* For roof-mounted applications,
follow steps 3 through 9 (pages 2–4),
then turn to “Roof Installation” on page 5.
If you experience difficulty during installation, refer to the “Troubleshooting Guide” on page 7.

3
RayClic-PC, RayClic-PS, RayClic-PT Installation Instructions
6B
6A
• Pull exposed braid back over metal clip.
8
• Insert prepared heating cable
end into connector. Push until heating
cable is fully inserted and end is visible
through opening in connection cover plate.
HWAT Only IceStop and XL-Trace Only
3 1/8"
1"
9
• For HWAT only:
Apply HWAT label on
insulated hot water tank.
• Using wire cutters, cut away 1-inch of the braid.
• Pull exposed braid back over metal clip.
IceStop and XL-TraceHWAT
7
• Using wire cutters, cut away aluminum wrap.
Note: RayClic connection kits are designed to be installed only
once; the heating cable cannot be removed once installed.
• Apply a small amout of lubricant to the
jacket surface near the end of the cable.
• Avoid using large amounts of lubricant
on the exposed end of the cable.

Moisture
seal
Moisture
seal
Moisture
seal
Moisture
seal
• Using glass cloth tape,
attach heating cable to pipe.
• Apply insulation, cladding and warning labels.
• Terminate power wiring in user-supplied junction box.
• Using glass cloth tape,
attach heating cable to pipe.
• Apply insulation, cladding and warning labels.
• Terminate power wiring in user-supplied junction box.
• Using glass cloth tape,
attach heating cable to pipe.
• Apply insulation, cladding and warning labels.
• Terminate power wiring in user-supplied junction box.
• Using two wrenches, attach user-supplied 1/2-inch conduit.
To avoid breaking housing, do not exceed 15 ft-lbs of torque.
Broken connectors must be replaced.
13B 13C
11
Power Connection
• To prevent damage to heat-
ing cables, protect from
sharp cladding edges.
• To prevent water ingress, seal
the heating cable where it
penetrates the insulation.
Powered Tee
• To prevent damage to heating cables,
protect from sharp cladding edges.
• To prevent water ingress, seal the heating
cable where it penetrates the insulation.
Powered Splice
• To prevent damage to heating cables,
protect from sharp cladding edges.
• To prevent water ingress, seal the heating
cable where it penetrates the insulation.
WARNING: Firehazard.Loosescrewscancauseexcessive
heating.Besurescrewsarefullytightened.
• Securely tighten the two connection screws, alternating as they are
being tightened.
• For Powered Splice and Tee kits, repeat steps 3 through 8 for all
remaining heating cable entries.
Tighten the screws
until the metal top
surface is at the
same height as the
inner clear plastic
module.
• Close the lid and snap the lever shut. Do not force lid closed; if lid does
not close, check the connection to ensure all screws are fully tightened.
• Tighten the nuts on the heating cable entries until grommets are com-
pressed.
4
RayClic-PC, RayClic-PS, RayClic-PT Installation Instructions
10
13A12

RayClic-SB-02
Drip
loop
1 2
• Attach the connector to the mounting bracket
by pressing until it snaps in place.
• Complete heating cable installation and install
a drip loop as shown.
• Protect heating cable from sharp edges.
Power Connection
• Connect user-supplied 1/2-inch conduit
by following step 11 on page 4.
• Apply Electric De-Icing and Snow
Melting label on or near junction box.
RayClic-PC RayClic-PS
and RayClic-PT
• Mount flat (wall mounting) bracket under eaves by installing screws
through the center holes.
Do not mount in gutter or where it may be immersed in water.
• Position attachment clips on mounting bracket based on the type of
the connector being installed.
• Connect heating cable as
detailed in steps 3 through
9 (pages 2–4).
3 4
5
5
RayClic-PC, RayClic-PS, RayClic-PT Installation Instructions
Roof Installation

6
RayClic-PC, RayClic-PS, RayClic-PT Installation Instructions
1"
2
1
• Remove exposed braid.
• Push end seal completely onto heating cable.
End Seal Installation
3 1/8"
1"
HWAT
H
W
A
T
IceStop and XL-Trace
HWAT
IceStop and XL-Trace
HWAT
H
W
A
T
IceStop and XL-Trace
HWAT
IceStop and XL-Trace
Note: The end seal is designed to be
installed only once; it cannot be removed from the
heating cable once installed. Do not use until ready
for final installation.
HWAT
H
W
A
T
IceStop and XL-Trace
HWAT
IceStop and XL-Trace
2A
3
• Score around and down the outer
jacket 1-inch from the end.
• Remove the outer jacket.
• Do not cut or damage the inner jacket.
• Using wire cutters, cut away aluminum wrap
close to braid and outer jacket.

7
RayClic-PC, RayClic-PS, RayClic-PT Installation Instructions
Troubleshooting Guide
Problem Solution
Braidclipsaremissing. The braid clips are attached to the cardboard packing insert under the lid. The braid clips must be used to
ensure a ground connection. If clips are missing or lost, call Tyco Thermal Controls at (800) 545-6258.
Mounting bracket is missing. A pipe mounting bracket is supplied with the Power Connection, Powered Splice and Powered Tee kits. A
wall mounting bracket or additional pipe mounting bracked may be ordered using one of the catalog num-
bers listed under “Optional Accessories” on the front page of these instructions when you place your order.
Connector does not snap onto bracket. The bracket has two sets of attachment clips. Fold up the four outer clips for the Power Connection
kit. Fold up only the center clips for the Powered Splice and Powered Tee kits.
Heating cable type not mentioned. RayClic connection kits are approved for use only with Raychem HWAT, XL-Trace, and IceStop heat-
ing cables. Do not use with other heating cables.
Braidclipdoesnotfit. Be sure the clip is installed on the metal braid, not on the outer jacket.
Heating cable does not have Only HWAT heating cables have the aluminum wrap under the braid. Skip the aluminum wrap
aluminum wrap. removal step for XL-Trace and IceStop heating cables.
Heating cable cannot be Check for the following:
inserted into connector. • Apply cable lubricant to the heating cable primary (white) jacket.
• Outer jacket strip length is 3 1/8-inches.
• Braid clip is installed on top of the metal braid, not on the outer jacket.
• Braid is pulled back over braid clip.
• For HWAT, 1-inch of braid is removed.
• Sealing nut is loose (but not removed).
• Connection screws are loose.
Lid does not close. Be sure all screws are fully tightened before closing the lid.
Heating cable cannot be The outer jacket must be removed from the heating cable before the end seal is installed (see the
inserted into end seal. “End Seal Installation” instructions on page 6). Make sure 1-inch of the outer jacket, braid, and alumi-
num wrap (HWAT only) are removed.
Heating cable cannot be removed. The power connection and end seal are designed to be installed only once; the heating cable cannot be
removed once installed. Additional RayClic -E end seals can be ordered from Tyco Thermal Controls.

8
RayClic-PC, RayClic-PS, RayClic-PT Installation Instructions
© 2011 Tyco Thermal Controls LLC INST-172 PN 511491-000 H55092 05/11
Tyco, HWAT, IceStop, RayClic, and XL-Trace are registered and/or unregistered trademarks
of Tyco Thermal Controls LLC or its affiliates.
TORX is a registered trademark of Textron., Inc.
Worldwide Headquarters
Tyco Thermal Controls
7433 Harwin Drive
Houston, TX 77036
USA
Tel: 800-545-6258
Tel: 650-216-1526
Fax: 800-527-5703
Fax: 650-464-7711
info@tycothermal.com
www.tycothermal.com
Canada
Tyco Thermal Controls
250 West St.
Trenton, Ontario
Canada K8V 5S2
Tel: 800-545-6258
Fax: 800-527-5703
Important: All information, including illustrations, is believed to be reliable. Users, however,
should independently evaluate the suitability of each product for their particular application.
Tyco Thermal Controls makes no warranties as to the accuracy or completeness of the
information, and disclaims any liability regarding its use. Tyco Thermal Controls’ only obli-
gations are those in the Tyco Thermal Controls Standard Terms and Conditions of Sale for
this product, and in no case will Tyco Thermal Controls or its distributors be liable for any
incidental, indirect, or consequential damages arising from the sale, resale, use, or misuse
of the product. Specifications are subject to change without notice. In addition, Tyco Thermal
Controls reserves the right to make changes—without notification to Buyer—to processing
or materials that do not affect compliance with any applicable specification.
Heating Cable Circuit Testing
The RayClic Power Connection Kits (RayClic-PC, RayClic-PS and RayClic-PT) now include test ports in the blank module. Voltage can measured at
these points to confirm continuity or power to the installed heating cable circuit. For detail heating cable operation refer to the appropriate installation
and operating manual.
Instructions:
1. Open the RayClic Cover.
2. Set multimeter to AC voltage function.
3. Insert multimeter test probes into the two test ports.
Test
ports
WARNING: To avoid shock do not cross the test
probes or touch them to the metal pressure plate when
measuring voltage.
This manual suits for next models
2
Table of contents
Other Raychem Cables And Connectors manuals

Raychem
Raychem JBS-100-EP User manual

Raychem
Raychem Gardian W51 User manual

Raychem
Raychem FROSTGUARD User manual

Raychem
Raychem t-100 User manual

Raychem
Raychem S-150-E User manual

Raychem
Raychem E-150 User manual

Raychem
Raychem nvent MI Series User manual

Raychem
Raychem IEK-25-04 User manual

Raychem
Raychem TraceTek TT3000 SERIES User manual

Raychem
Raychem FTC-XC User manual