manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Remote Control
  6. •
  7. Controllers
  8. •
  9. Remote Control RCEL003 User manual

Remote Control RCEL003 User manual

Other Remote Control Controllers manuals

Remote Control Twin Power User manual

Remote Control

Remote Control Twin Power User manual

Remote Control RCEL005X User manual

Remote Control

Remote Control RCEL005X User manual

Remote Control RCEL 005 User manual

Remote Control

Remote Control RCEL 005 User manual

Remote Control RCEL User manual

Remote Control

Remote Control RCEL User manual

Remote Control RCEL Series User manual

Remote Control

Remote Control RCEL Series User manual

Popular Controllers manuals by other brands

Sunricher SR-ZV9003T3-RGBW-US Installation

Sunricher

Sunricher SR-ZV9003T3-RGBW-US Installation

Ksenia intro Installation and configuration manual

Ksenia

Ksenia intro Installation and configuration manual

Inovance CAN200 Series manual

Inovance

Inovance CAN200 Series manual

Gauzy LC6 FLEX Controller Installation and operation guide

Gauzy

Gauzy LC6 FLEX Controller Installation and operation guide

Viking SLP-1 Technical practice

Viking

Viking SLP-1 Technical practice

CKD KBX-30E-U Series instruction manual

CKD

CKD KBX-30E-U Series instruction manual

Sharp Energy Sun Flux User manual & installation guide

Sharp Energy

Sharp Energy Sun Flux User manual & installation guide

Yamaha RCX40 user manual

Yamaha

Yamaha RCX40 user manual

AB Quality PowerFlex 400 Frames D-H Service bulletin

AB Quality

AB Quality PowerFlex 400 Frames D-H Service bulletin

Yamaha MJC8 owner's manual

Yamaha

Yamaha MJC8 owner's manual

AL-KO ATC operating instructions

AL-KO

AL-KO ATC operating instructions

Savant SmartControl 2 Deployment guide

Savant

Savant SmartControl 2 Deployment guide

GameSir T3S user manual

GameSir

GameSir T3S user manual

Kostal inveor operating manual

Kostal

Kostal inveor operating manual

Emerson Yarway 20-55 Operating and safety instructions

Emerson

Emerson Yarway 20-55 Operating and safety instructions

CoCo ACM-LV24 Quick installation guide

CoCo

CoCo ACM-LV24 Quick installation guide

Brooks SLA5810/20 Installation and operation manual

Brooks

Brooks SLA5810/20 Installation and operation manual

SIGMA TEK SR 011 Technical manual

SIGMA TEK

SIGMA TEK SR 011 Technical manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

www.rotork.com
- 1 -
Top Quality Valve Actuators
Rotork Sweden AB
Tel +46 (0)23 587 00
Fax +46 (0)23 587 45
www.remotecontrol.se
falun.info@rotork.com
Installation
1. Mounting on valve, see instruction A.
2. Electric wiring, see instruction B.
3. Adjusting, see instruction C.
4. Manual operation, see instruction D.
Note:
Only electric wiring, according to instruction B, is
required when the actuator is delivered from Remote
Control mounted on a valve. It is adjusted and ready
for operation.
1. Operate the valve manually to fully open
or fully closed position before the actuator
is mounted.
2. Operate the actuator manually (see D) to
fully open or fully closed position.
3. Check that the actuator and valve stem
are in correct position. Please note, valve
and actuator must be in the same mode
(fully open / fully closed) prior to the
assembly.
4. Mount the actuator on the valve and
check that the actuator and valve stems
are centered and aligned. If a mounting
bracket is used, the t must be checked
so that no distortion or play exists.
5. Operate the valve manually with the aid of
allen key (see D) and check that the valve
moves with normal resistance.
6. Check that all screws are correctly
tightened.
Note:
Electric wiring must be carried out by
qualied personnel only!
1. Loosen the screws on the cover and lift it off.
2. Check the voltage marked on the actuator
label.
3. Connect according to the enclosed wiring
diagram or, if the actuator is of standard
design, according to the wiring diagram
below. The wiring diagram is drawn in
unaffected position (the valve in intermediate
position).
4. Test run the actuator from the intermediate
position checking that the actuator turns in
the correct direction.
5. Test run the actuator and check that the limit
switches work correctly.
6. Check that the cable entries and possible
blind plug are sealed.
7. Mount the cover.
Wiring diagram No. SU12000A
A. MOUNTING ON VALVE
B. ELECTRIC WIRING
WARNING!
Remove power before the cover
is dismantled! The actuator must be handled
with the utmost care when the cover is
removed and the power is connected.
Instruction
Electric Actuators
RCEL003
- 2 -
www.rotork.com
Rotork Sweden AB
Box 80
Kontrollvägen 15
SE-791 22 Falun
Sweden
Tel +46 (0)23 587 00
Fax +46 (0)23 587 45
www.remotecontrol.se
falun.info@rotork.com
Ref No 729 / Art No 980729
1. Make the nal cam adjustments for the limit
switches (if necessary) according to instruc-
tion (a) below.
2. Run the actuator from one end position to
the other a number of times.
3. Adjust the indicator for visual indication
so that it relates to the valve position. by loosen
ing the bolt and turning the indicator to the proper
position, then retighttening the bolt.
4. Test run the actuator and check that the limit
indicators are working correctly.
5. Mount the cover.
1. Pull the Auto-Manual selector lever to Manual
position
2. Take the attached 6mm Allen key mounted
underside the actuator.
3. Insert the 6mm Allen key and turn the valve
to the required position.
4. Turn clockwise to close and anti-clockwise
to open.
5. Put allen key back in the holder after manual
operation.
6. Pull the Auto-Manual selector to Auto position.
1. Operate the actuator manually to closed
position.
2. Adjust the cams for closed position (lower
cam) marked CLS and 3:rd cam marked ACLS
on the electronic card.
3. Operate the actuator manually to open
position.
4. Adjust the cams for open position (upper
cam marked OLS and 2:nd cam marked AOLS)
on the electronic card.
5. Test run the actuator.
(a) Adjustment of cams for limit switches:
C. ADJUSTING D. MANUAL OPERATION
We reserve the right to