
HYD 3K~6K-EPUser manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd。
- 2
skilled,aware and mature for the
described tasks and must have the reliability to
correctly interpret what is described in the manual. For safety reason only a
qualified electrician, who has received training and / or has demonstrated skills and
knowledge in construction and in operation
of this unit, can install this inverter.
Shenzhen SOFARSOLAR Co., Ltd.
does not take any responsibility for the
property destruction and personal injury because of any incorrect use.
Installation requirements
Please install inverter according to the follo
wing section. Fix the inverter on
an appropriate objects with enough load bearing capacity (such as walls, PV racks
etc.), and ensure that inverter is vertical placed. Choose a place suitable for
installing electrical devices. And assure there is enough fi
re exit space, convenient
for maintenance. Maintain proper ventilation to ensure enough air cycle to cool the
inverter.
Transport requirements
If you find packing problems that may cause the damage of the inverter, or
find any visible damage, please immedi
ately notice the responsible transportation
company. You can ask solar equipment installation contractor or Shenzhen
SOFARSOLAR Co.Ltd. for help if necessary.
Transport of the equipment, especially by road, must be carried out with by
suitable ways and mea
ns for protecting the components (in particular, the electronic
components) from violent shocks, humidity, vibration, etc.
Labels on the equipment
described tasks and must have the reliability to
correctly interpret what is described in the manual. For safety reason only a
qualified electrician, who has received training and / or has demonstrated skills and
of this unit, can install this inverter.
does not take any responsibility for the
property destruction and personal injury because of any incorrect use.
wing section. Fix the inverter on
an appropriate objects with enough load bearing capacity (such as walls, PV racks
etc.), and ensure that inverter is vertical placed. Choose a place suitable for
re exit space, convenient
for maintenance. Maintain proper ventilation to ensure enough air cycle to cool the
If you find packing problems that may cause the damage of the inverter, or
ately notice the responsible transportation
company. You can ask solar equipment installation contractor or Shenzhen
Transport of the equipment, especially by road, must be carried out with by
ns for protecting the components (in particular, the electronic