Revere Aero Compact 2 User manual



REVISION RECORD
Feb 25/11
9105 RR - 1
RR
DOCUMENTING A REVISION
Record the Revision No. and Revision Date. Remove the old sheet and replace it with the revised copy.
Record the Insert Date and then initial in the Inserted By column.
Revisions made ONLY by Revere Supply, Inc.
REV. No.
REV.
DATE
INSERTED
REV. No.
REV.
DATE
INSERTED
DATE
BY
DATE
BY
Original
Feb 25/11

Feb 25/11
RR - 2 9105
THIS PAGE INTENTIONALLY LEFT BLANK

SERVICE BULLETIN
Feb 25/11
9105SB - 1
SB
All service bulletins which are incorporated into this manual are required to be recorded in this list.
All updates to this list will be made by the owner of the manual.
SERVICE
BULLETIN No.
DATE
TITLE/DESCRIPTION
REV. No.
DATE OF
INCORPORATION

Feb 25/11
SB - 2 9105
THIS PAGE INTENTIONALLY LEFT BLANK

SERVICE BULLETIN NO. 09/16A
Sept 20/2016
9105SB - 1
5323 Highway Avenue
Jacksonville, FL 32254
(T) 904.503.9733
(F) 904.503.9719
1. INTRODUCTION
This service bulletin is to advise service stations of the change in valves, firing heads and cylinders
for the Aero Compact liferafts.
Starting from July, 2014 all Aero Compact rafts produced by Revere will now be equipped with the
following valves
Pressure Relief Valve: Thanner OTS-45 (Revere P/N 95-324-004)
Topping Off Valve: Mirada A-52030 (Revere P/N 95-326-009)
Inlet Check Valve: Mirada B-51994 (Revere P/N 95-325-005) 3/8-18NPSM
Universal Flange (PU): Mirada B-51073 (Revere P/N 95-326-001)
As a result of the inlet check valve replacement, new firing heads are required for all rafts starting
in July 2014.
Raft Number
Firing Head
Cylinder
Aero Compact 2 (45-AC2V)
95-41115-103
(Circor M70 w/ 3/8-18 NPSM)
95-327-061 (61in3) Re-fillable
Aero Compact 4 (45-AC4V)
95-41115-103
(Circor M70 w/ 3/8-18 NPSM)
95-327-061 (61in3) Re-fillable
The purpose of the technical update is to show the new items and procedures to follow for the
servicing of the inflation system with the new firing heads.
2. EMBODIMENT DATE
Mandatory at next service.

SERVICE BULLETIN NO. 09/16A
Sept 20/2016
9105SB - 2
5323 Highway Avenue
Jacksonville, FL 32254
(T) 904.503.9733
(F) 904.503.9719
3. VALVE IDENTIFICATION
Thanner OTS-45 Mirada A-52030 Mirada B-51994
4. FIRING HEAD 95-41115-103 (M70) OPERATING INSTRUCTIONS
See Chapter 8 –Assembly and Packing, Inflation Valve Disassembly & Rebuilding Process for
instructions on servicing the 41115 inflation valve. All service instructions remain the same, but
note the outlet fitting is now 3/8-18 NPSM rather than the previous fitting of 1/2-20 UNF.
3/8-18 NPSM

SERVICE BULLETIN NO. 09/16A
Sept 20/2016
9105SB - 3
5323 Highway Avenue
Jacksonville, FL 32254
(T) 904.503.9733
(F) 904.503.9719
5. PRV OTS-45 INSTALLATION
The OTS 45 relief valve consists of 4 main elements:
1. Valve body section.
2. Nut.
3. Washer / washer with closing cap.
4. O-ring.
The valve parts are produced from Acetal Copolymer (1+2+3)
The seal/o-ring (4) is made of silicone rubber.
INSTALLATION:
When the nut (2) is in position inside the tube, the washer (3) is placed over the hole with the
o-ring (4) in the center.
Cutting hole in the fabric: 22 mm
IMPORTANT
The grip rings of the washer (3) must be placed towards the fabric.
The valve body (1) is screwed into the nut through the fabric by hand, before any tools are used. The
valve is tightened to the raft and finally by torque tool. Depending of the fabric –reinforcement can be
necessary. Check the color code of the valve for the right pressure.
TIGHTENING:
To tighten the valve use a 32 mm top spanner/torque tool.
Tightening torque: 6 –8 Nm

SERVICE BULLETIN NO. 09/16A
Sept 20/2016
9105SB - 4
5323 Highway Avenue
Jacksonville, FL 32254
(T) 904.503.9733
(F) 904.503.9719
NOTE:
The valve must not be re-tightened after installation. If a leakage appears between the fabric and the
relief valve, the valve must be taken apart and reinstalled until tight.
IMPORTANT:
If using the closing cap, be careful the cap is not fitted to the valve during packing. The locked valve
may damage the raft during inflation.
CAUTION:
Do not separate the spring, washer and valve piston.

SERVICE BULLETIN NO. 09/16A
TRANSMITTAL
Sept 20/2016
9105SB - 5
7720 Philips Highway
Jacksonville, FL 32256
(T) 904.786.0033
(F) 904.786.0890
This page transmits the issue of the above numbered Revere Service Bulletin, which consists of this
transmittal sheet plus four pages.
Title: Revere Aero Compact Liferafts –Gas Inflation System
Service Bulletin Number 09/16A has technical approval by Revere Survival Inc.
Signed: ______________________________ Date: 09/20/2016
Jessica Hughes
Director of Technical Services
Revere Survival Inc.
Signed: ______________________________ Date: 09/20/2016
Thomas Mastrella
VP of Operations
Revere Survival Inc.


LIST OF EFFECTIVE PAGES
Feb 25/11
9105EP - 1
EP
PAGE TITLE
PAGE
No.
ISSUE DATE
PAGE TITLE
PAGE
No.
ISSUE DATE
Title Page
Revision Record
Service Bulletin
Effective Pages
Associated
Publications
Abbreviations
Table of Contents
Introduction
Section 1
Description
Section 2
1
RR-1
RR-2
SB-1
SB-2
EP-1
EP-2
EP-3
EP-4
AP-1
AP-2
AB-1
AB-2
TC-1
TC-2
1-1
1-2
1-3
1-4
2-1
2-2
2-3
2-4
2-5
2-6
2-7
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Disassembly
Section 3
Testing
Section 4
2-8
2-9
2-10
2-11
2-12
2-13
2-14
2-15
2-16
3-1
3-2
3-3
3-4
3-5
3-6
3-7
3-8
4-1
4-2
4-3
4-4
4-5
4-6
4-7
4-8
4-9
4-10
4-11
4-12
4-13
4-14
4-15
4-16
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11

Feb 25/11
EP - 2 9105
PAGE TITLE
PAGE
No.
ISSUE DATE
PAGE TITLE
PAGE
No.
ISSUE DATE
Cleaning
Section 5
Service/Check
Section 6
Repair
Section 7
Assembly
Section 8
4-16
4-17
4-18
5-1
5-2
5-3
5-4
5-5
5-6
6-1
6-2
6-3
6-4
6-5
6-6
6-7
6-8
7-1
7-2
7-3
7-4
7-5
7-6
7-7
7-8
7-9
7-10
7-11
7-12
7-13
7-14
8-1
8-2
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
8-3
8-4
8-5
8-6
8-7
8-8
8-9
8-10
8-11
8-12
8-13
8-14
8-15
8-16
8-17
8-18
8-19
8-20
8-21
8-22
8-23
8-24
8-25
8-26
8-27
8-28
8-29
8-30
8-31
8-32
8-33
8-34
8-35
8-36
8-37
8-38
8-39
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11

Feb 25/11
9105EP - 3
PAGE
No.
ISSUE DATE
PAGE TITLE
PAGE
No.
ISSUE DATE
Storage
Section 9
Tools
Section 10
IPL
Section 11
8-40
8-41
8-42
8-43
8-44
8-45
8-46
8-47
8-48
8-49
8-50
9-1
9-2
9-3
9-4
10-1
10-2
10-3
10-4
10-5
10-6
10-7
10-8
11-1
11-2
11-3
11-4
11-5
11-6
11-7
11-8
11-9
11-10
11-11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Appendix A
Certificate
11-12
11-13
11-14
11-15
11-16
11-17
11-18
11-19
11-20
11-21
11-22
11-23
11-24
11-25
11-26
A-1
A-2
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11
Feb 25/11

Feb 25/11
EP - 4 9105
PAGE
No.
ISSUE DATE
PAGE TITLE
PAGE
No.
ISSUE DATE
THIS PAGE INTENTIONALLY LEFT BLANK

LIST OF ASSOCIATED PUBLICATIONS
Feb 25/11
9105AP - 1
AP
None Listed

Feb 25/11
AP - 2 9105
THIS PAGE INTENTIONALLY LEFT BLANK

LIST OF ABBREVIATIONS/SYMBOLS
Feb 25/11
9105 AB - 1
AB
DEFINITION
ABBREVIATION
Degrees
Percent
Calories
Centigrade/Celcius
Cubic Centimeter(s)
Centimeter
Centimeters of Mercury
Cubic Inch
Farenheit
Figure
Foot or Feet
Gram
Gram per Square Centimeter
Inch (s)
Inches of Mercury
Inside Diameter
Kilogram
Kilogram per Square Centimeter
Ounce (s)
Outside Diameter
Package
Pound (s)
Pound Force Inch
Pound Force Foot
Meter (s)
Millibar
Millimeter
Millimeters of Mercury
Minutes
Maximum
Minimum
Newton Meter (s)
Number
Per square inch
Per square inch gauge
Polyvinylchloride
Square inches
Square centimeters
°
%
cal.
C
cm3
cm
cm Hg
in3
F
Fig.
ft.
g
g/cm2
in.
inHg
i/d
Kg.
kg/cm2
oz.
o/d
pkg.
lb.
lbf. in.
lbf. ft.
m
mbar
mm
mm Hg
min.
MAX
MIN
Nm
No.
psi
psig
PVC
in2
cm2

Feb 25/11
AB - 2 9105
THIS PAGE INTENTIONALLY LEFT BLANK
This manual suits for next models
3
Table of contents
Other Revere Marine Safety Device manuals
Popular Marine Safety Device manuals by other brands

Baltic
Baltic 100N user manual

ACR Electronics
ACR Electronics SM-2 Product support manual

Baltic
Baltic 100N user guide

Sirius Signal
Sirius Signal C-1002 Operation manual

ACR Electronics
ACR Electronics NAUTICAST Y1-03-0212-1 Installationshandbuch

Marine Rescue Technologies
Marine Rescue Technologies sMRT AU10 user manual