Series PA/F, PA/S Page 2
9510-060-en Revision 17
TM 9549 Edition 07/2016
List of Contents
List of Contents.................................................2
Relevant documents.........................................3
1Technical Data.............................................3
1.1 Name plate and body markings .................... 4
1.2 Tightening torques .......................................... 4
1.3 Flow rates......................................................... 4
1.4 Pressure-temperature diagram..................... 4
1.5 Viscosity-pressure diagram ........................... 5
2Notes on safety............................................5
2.1 Intended use .................................................... 5
2.2 For the customer / operator........................... 6
2.3 Improper operation.......................................... 6
3Safety notes for applications in potentially
explosive areas based on the Directive
2014/34/EU (Atex)........................................6
3.1 Intended use .................................................... 6
4Safety note for valves, certified to German
Clean Air Act (TA Luft)................................7
5Transport, storage and disposal...............8
5.1 Storage ............................................................. 8
5.2 Return consignments...................................... 8
5.3 Disposal............................................................ 8
6Installation....................................................9
6.1 Flange caps and gaskets............................... 9
6.2 Direction of flow and installation position.... 9
6.3 Grounding......................................................... 9
6.4 Test pressure................................................... 9
6.5 Star knop .......................................................... 9
6.6 High-viscosity media / Low operating
pressure............................................................ 9
6.7 Setting instructions.......................................... 9
6.8 Needle adapter for PA/S DN25................... 10
7Operation....................................................10
7.1Initial commissioning................................10
7.2 Improper operation and their consequences.
..................................................................... 10
7.3 Sampling (standard)...................................... 11
7.4 Shutdown........................................................ 11
8Malfunctions...............................................11
9Maintenance...............................................12
9.1 Disassembling PA/F en removing the
packing rings.................................................. 12
9.2 Disassembling PA/S and removing the
packing rings.................................................. 13
9.3 Assembling PA/F and inserting the packing
rings................................................................. 14
9.4 Assembling PA/S and inserting the packing
rings................................................................. 16
10 Sectional drawings and options..............19
10.1 Legend PA/F.................................................. 19
10.2 Legend PA/S.................................................. 19
10.3 Sectional drawing PA/F horizontal installation
..................................................................... 20
10.4 Details............................................................. 21
10.5 PA/F vertical installation............................... 22
10.6 PA/F, PAP/F Option high-viscosity media. 22
10.7 Sectional drawing PA/S................................ 23
10.8 Detail PA/S DN 25......................................... 24
10.9 PA/S, PAP/S Option high-viscosity media. 24
10.10 PA/S Vertical installation............................ 25
10.11 PAP/F, PAP/S............................................ 25
10.12 Dimensional drawing PA/F....................... 26
10.13 Dimensional drawing PA/F vertical
intallation......................................................... 27
10.14 Dimensional drawing PA/F with handwheel
..................................................................... 28
10.15 Dimensional drawing PA/S horizontal
installation....................................................... 29
10.16 Dimensional drawing PA/S vertical
installation....................................................... 30
10.17 Dimensional drawing PA/S with handwheel
..................................................................... 31
10.18 Flange connection..................................... 32