Series PA/F, PA/S Page 2
9510-010-en Revision 18
TM 9549 Edition 11/2018
List of Contents
List of Contents ................................................ 2
Relevant documents ........................................ 3
1Technical data............................................. 3
1.1 Type plate and body markings......................4
1.2 Tightening torques..........................................4
1.3 Flow rates........................................................4
1.4 Pressure-temperature diagram .....................4
1.5 Viscosity-pressure diagram ...........................5
2Notes on safety ........................................... 5
2.1 Intended use ...................................................5
2.2 For the customer / operator...........................6
2.3 Improper operation.........................................6
3Safety notes for applications in potentially
explosive areas based on the Directive
2014/34/ EC (ATEX)..................................... 6
3.1 Intended use ...................................................6
4Safety note for valves, certified to Clean
Air Act (TA Luft) .......................................... 7
5Transport, storage and disposal............... 8
5.1 Storage............................................................8
5.2 Return consignments .....................................8
5.3 Disposal...........................................................8
6Installation ................................................... 9
6.1 Flange caps and gaskets...............................9
6.2 Direction of flow and installation position....9
6.3 Grounding .......................................................9
6.4 Test pressure..................................................9
6.5 Star knob.........................................................9
6.6 High-viscosity media / Low operating
pressure ..........................................................9
6.7 Setting instructions.........................................9
6.8 Needle adapter for PA/S DN25...................10
7Operation ................................................... 10
7.1 Initial commissioning ................................... 10
7.2 Improper operation and their consequences
................................................................... 10
7.3 Sampling (Standard).................................... 11
7.4 Shutdown...................................................... 11
8Malfunctions .............................................. 11
9Maintenance .............................................. 12
9.1 Disassembling PA/F and removing the
packing rings ................................................ 12
9.2 Disassembling PA/S and removing the
packing rings ................................................ 13
9.3 Assembling PA/F and inserting the packing
rings............................................................... 14
9.4 Assembling PA/S and inserting the packing
rings............................................................... 16
10 Sectional drawings and options ............. 19
10.1 Legend PA/F ................................................ 19
10.2 Legend PA/S ................................................ 19
10.3 Sectional drawing PA/F............................... 20
10.4 Details ........................................................... 21
10.5 PA/F vertical installation............................. 22
10.6 PA/F, PAP/F Option high-viscosity media 22
10.7 Sectional drawing PA/S.............................. 23
10.8 Detail PA/S DN 25 ....................................... 24
10.9 PA/S, PAP/S Option high-viscosity media 24
10.10 PA/S Vertical installation ........................ 25
10.11 PAP/F, PAP/S .......................................... 25
10.12 Dimensional drawing PA/F horizontal
installation..................................................... 26
10.13 Dimensional drawing PA/F vertical
installation..................................................... 27
10.14 Dimensional drawing PA/F with
handwheel .................................................... 28
10.15 Dimensional drawing PA/S horizontal
installation..................................................... 29
10.16 Dimensional drawing PA/S vertical
installation..................................................... 30
10.17 Dimensional drawing PA/S with handwheel
................................................................... 31
10.18 Flange connection.................................... 32