manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Safe-t-Cover
  6. •
  7. Heater
  8. •
  9. Safe-t-Cover 400LU880 User manual

Safe-t-Cover 400LU880 User manual

Page 1 www.safe-t-cover.com 1-800-245-6333
12/28/2020
ASSEMBLY INSTRUCTIONS – PLEASE READ CAREFULLY
Model No. Inside Dimensions Outside Dimensions Concrete Pad Dimensions
400LU880 32"W X 36"L X 44"H 35 3/4"W X 39 1/8"L X 47 1/4"H 46"W X 50"L X 6" Thick
400TLU880 36"W X 36"L X 44"H 39 3/4"W X 39 1/8"L X 47 1/4"H 50"W X 50"L X 6" Thick
600LU880 36"W X 38"L X 48"H 39 3/4"W X 41 1/8"L X 51 1/4"H 50"W X 52"L X 6" Thick
600TLU880 44"W X 38"L X 48"H 47 3/4"W X 41 1/8"L X 51 1/4"H 58"W X 52"L X 6" Thick
800LU880 44"W X 44"L X 52"H 47 3/4"W X 47 1/8"L X 55 1/4"H 58"W X 58"L X 6" Thick
800TLU880 54"W X 44"L X 52"H 57 3/4"W X 47 1/8"L X 55 1/4"H 68"W X 58"L X 6" Thick
800TLU880M 58”W X 54”L X 60”H 61 1/8”W X 57 1/8”L X 63 1/4”H 68”W X 72”L X 6” Thick
1000LU880 48"W X 48"L X 56"H 51 3/4"W X 51 1/8"L X 59 1/4"H 62"W X 62"L X 6" Thick
1000TLU880 64"W X 48"L X 56"H 67 3/4"W X 51 1/8"L X 59 1/4"H 78"W X 62"L X 6" Thick
1000TLU880M 63"W X 57"L X 62"H 66 3/4"W X 60 1/8"L X 65 1/4"H 77"W X 71"L X 6" Thick
Page 2 www.safe-t-cover.com 1-800-245-6333
12/28/2020
1. Do not remove the PVC masking film until the enclosure is fully assembled. The PVC
masking film will protect the finish of the metal panels during installation.
2. The concrete base should be 6” thick, 14” longer than enclosure ID and 14” wider than
enclosure ID. Please note that the concrete base should be level, or the access panels may be
difficult to install.
3. Mark the concrete base for the outside of the enclosure using the dimensions in the table
above. See important notice in step 4 before marking.
4. Important Notice - if the enclosure will be installed over an N pattern backflow assembly
with OS&Y gate valves: Place one “A” PANEL side of the enclosure 1" from the fully open
OS&Y gate valve STEM. This will allow room for the check valves to be serviced in the “C”
PANEL OPENING. Once one side of the enclosure is placed 1" from the fully open OS&Y
gate valve STEM, continue to assemble the enclosure by following the directions below.
5. Place the other A panel on the concrete pad opposite the “A” panel in step 4. Measure and
verify the Outside Dimension of these A panels matches what is noted in the table above.
6. Set “D” (roof) panel on “A” (end) panels.
7. Temporarily place one “C” (access) panel opposite hinged side of “D” (roof) panel. Square
the enclosure.
8. IMPORTANT! From inside the enclosure, inspect the alignment of the “D” (roof) panel where it
meets the “A” panels to ensure that “A” panels are placed securely within the “D” (roof)
channel. Fasten “D” (roof) safety hooks before connection of the “D” (roof) to the “A” panels.
9. Fasten “D” (roof) panel to “A” (end) panel by attaching the roof hinges to “A” (end) panels
with three (3) screws provided. (Fig 1A)
10. Remove “C” (access) door panel.
11. IMPORTANT! THE “D” ROOF PANEL MUST BE CONNECTED TO THE “A” PANELS
BEFORE ANCHORING ENCLOSURE TO THE SLAB.
12. IMPORTANT! Fasten each Inside Corner Aluminum Anchoring Brackets to the “A” panel
with hex head screws as shown in Fig. 1B, then fasten to concrete base with anchors
provided.
13. Release safety hooks and raise roof. Snap lift shocks onto brackets by snapping the shock
socket over the ball of each bracket. (Fig 1C) Be sure the cylinder end of the shock is
attached to the roof.
Page 3 www.safe-t-cover.com 1-800-245-6333
12/28/2020
14. Fasten roof on the inside with safety hooks. (Fig 1D)
15. Place “C” (access) door panels and lock in place.
16. For maximum protection it is suggested that the area between the bottom of the enclosure
and the concrete base be caulked with the exception the “C” panels. DO NOT CAULK THE
BOTTOM OF THE “C” ACCESS DOOR PANELS.
17. Provide ground-fault interrupter device in electrical circuit according to applicable codes.
Install heater, if applicable, as per manufacturer's instructions and governing local and
national codes.
18. REMOVE MASKING FILM IMMEDIATELY AFTER INSTALLATION.
If these panels get wet when the film is still on, water will irreversibly stain the panels.
Summertime heat will bake the film on the panels.
CONTENTS
1. Assembly parts included:
A. 2- "A" (end) Panels
B. 1- “C” (drain door) Panel
C. 1- “C” (solid access) Panel
D. 1- “D” (roof) Panel
E. 4- Inside Aluminum Corner Anchoring Brackets
(6 for 800TLU880M and 1000TLU880M)
F. 2- Lifting Shocks
G. 4- Anchor Bolts
(6 for 800TLU880M and 1000TLU880M)
H. 1 Package of Hexhead Screws
I. 1- Masonry Bit (1/2" x 4")
J. 1- Magnetic Chuck (5/16")
2. Tools needed:
A. Hammer
B. Drill
C. ¾” Wrench
D. Hammer Drill

This manual suits for next models

9

Other Safe-t-Cover Heater manuals

Safe-t-Cover 1000 Series User manual

Safe-t-Cover

Safe-t-Cover 1000 Series User manual

Safe-t-Cover 800S Series User manual

Safe-t-Cover

Safe-t-Cover 800S Series User manual

Popular Heater manuals by other brands

Porter-Cable PCXH80KT Operating instructions and owner's manual

Porter-Cable

Porter-Cable PCXH80KT Operating instructions and owner's manual

Dyna-Glo RA18LPDG user manual

Dyna-Glo

Dyna-Glo RA18LPDG user manual

Dimplex PLX050E instruction manual

Dimplex

Dimplex PLX050E instruction manual

EOS Herkules XL S120 installation instructions

EOS

EOS Herkules XL S120 installation instructions

Trebs Comfortheat 99209 manual

Trebs

Trebs Comfortheat 99209 manual

Biddle STYLE2 Series Installation operation & maintenance

Biddle

Biddle STYLE2 Series Installation operation & maintenance

Vermont Castings Non-Catalytic Convection Heater 2477CE Installation and operating manual

Vermont Castings

Vermont Castings Non-Catalytic Convection Heater 2477CE Installation and operating manual

Fagor RA-1505 Instructions for use

Fagor

Fagor RA-1505 Instructions for use

THERMAL FLOW Delta 175 Operating instructions manual

THERMAL FLOW

THERMAL FLOW Delta 175 Operating instructions manual

GET G2CH instructions

GET

GET G2CH instructions

ApenGroup PK Series User, installation, and maintenance manual

ApenGroup

ApenGroup PK Series User, installation, and maintenance manual

oventrop Regucor Series quick start guide

oventrop

oventrop Regucor Series quick start guide

Blaze King CLARITY CL2118.IPI.1 Operation & installation manual

Blaze King

Blaze King CLARITY CL2118.IPI.1 Operation & installation manual

ELMEKO ML 150 Installation and operating manual

ELMEKO

ELMEKO ML 150 Installation and operating manual

BN Thermic 830T instructions

BN Thermic

BN Thermic 830T instructions

KING K Series Installation, operation & maintenance instructions

KING

KING K Series Installation, operation & maintenance instructions

Empire Comfort Systems RH-50-5 Installation instructions and owner's manual

Empire Comfort Systems

Empire Comfort Systems RH-50-5 Installation instructions and owner's manual

Well Straler RC-16B user guide

Well Straler

Well Straler RC-16B user guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.