manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. SALZ
  6. •
  7. Switch
  8. •
  9. SALZ SWITCH 4008GT User manual

SALZ SWITCH 4008GT User manual

-1- -2- -3-
1. Overview
The SWITCH 4008GT Lite-Managed Industrial Ethernet Switch
is designed for harsh environments to withstand vibration,
shock, free fall, power surges. The switch is easy to set-up and
supports the critical software features required in factory automa-
tion systems such as multi-axis robots and their peripherals
(PLC's, HMI's and legacy devices). The switch includes 8-port
10/100/1000Mbps RJ45 downlink ports.
2. Package Checklist
Panel view
4. Grounding the switch
5.1 Wiring Power Input
Grounding and wire routing help limit the eects of noise due to
electromagnetic interference (EMI). Run the ground connection
from the ground screw to the grounding surface prior to connect-
ing devices.
!ATTENTION:
A corrosion-free mounting rail is advisable. When
installing, make sure to allow for enough space
between devices to properly install the cabling. And
provide ample space for air ow.
3. Mounting and Dismounting to DIN-Rail
!ATTENTION:
The Switch is an open type device and shall be DIN-Rail
mounted or wall mounted (optional) in the cabinet and
the ambient temperature should not exceed the operat-
ing temperature.
!ATTENTION:
This product is intended to be mounted to a well-ground-
ed mounting surface such as a metal panel.
To insert power wire and connect the specied voltage range at
a maximum of 0.35A DC power to the power terminal block,
follow the steps below:
1. Use a at-head screwdriver to loosen the wire-clamp screws
2. Insert the negative/positive DC wires into the PWR-/PWR+
terminals, respectively
3. Tighten the wire-clamp screws to prevent the wires from loosen-
!WARNING:
Safety measures should be taken before connecting
the power cable. Turn o the power before connecting
modules or wires. The correct power supply voltage is
listed on the product label. Check the voltage of your
power source to make sure that you are using the
correct voltage. DO NOT use a voltage greater than
Please read and follow these guidelines:
• Use separate paths to route wiring for power and devices. If
power wiring and device wiring paths must cross make sure
the wires are perpendicular at the intersection point.
NOTE: Do not run signal or communications wiring and power
wiring through the same wire conduit. To avoid interference,
wires with dierent signal characteristics should be routed
separately.
• You can use the type of signal transmitted through a wire to
determine which wires should be kept separate. The rule of
thumb is that wiring that shares similar electrical characteris-
tics can be bundled together
• You should separate input wiring from output wiring
• We advise that you label the wiring to all devices in the system
Removing the SwitchMounting the Switch
Clic k
Mounting the switch
Place the switch on the DIN-Rail from above using the slot, push
the front of the switch toward the mounting surface until it snaps
into place with a click sound.
5. Wiring requirements
Dismounting the switch
Press the switch from top and pull out the lower edge of the
switch and then remove the switch from the DIN-Rail.
what is specied on the product label. Calculate the
maximum possible current in each power wire and
common wire. Observe all electrical codes dictating
the maximum current allowable for each wire size. If
current exceeds the maximum rating, the wiring can
overheat causing serious damage to your equipment.
Top View
Grounding
Screw
Power Input
Terminal Block
DIP Switches
Reset
24~48VDC
PWR
+
+
RPS
ALM
OFF
1
2
ON
1 PWR
ALM
RPS2
PWR
RPS
ALM
PWR RPS ALM
LNK/
ACT
1000
1
3
5
7
2
4
6
8
1000Mbps
(Green)
LNK/ACT
(Green)
Grounding Screw
SWITCH 4008GT
Quick Installation Guide
• SWITCH 4008GT Switch x 1
!
Caution:
• Use copper conductors only
• Wiring cable temperature should support at
least 105˚C
• Tighten the wire to a torque value 20N
• The wire gauge for the terminal block should
range between 0.2 to 2.5 mm2
You can use “PWR” for Primary Power input and “RPS” for
Redundant Power Input.
Top view of Terminal Block is shown in the gure below:
Terminal Block
-4- -5- -6- v1.0
!ATTENTION:
Please use a power supply from 24 ... 48VDC, the
device power shall be supplied by SELV circuit.
Connect through Web Browser:
• Connect your computer to one of the Ethernet ports.
9. Conguration
Default Username
Default Password
SALZ
admin
NOTE: For more details on conguration please refer user manual.
Connect one end of an Ethernet cable into the Ethernet port of
the switch and the other end to the attached networking device.
• Ports 1-8 supports 10/100/1000Mbps speed
• All the RJ45 ports on the switch support auto-negotiation and
auto MDI/MDI-X to eliminate the need for crossover cabling.
* Category 5e cable or above should be used.
5.3 Cabling RJ45
5.2 Wiring the relay contact (ALM)
The switch has one set of relay alarm
output. This relay contact uses two
contacts of the terminal block on the
switch top panel. The two contacts of
the terminal block connector are
used to detect user-congured
events. The two wires attached to
the fault contacts form an open
circuit when a user-congured event
is triggered. If a user-congured
event does not occur, the fault circuit
Relay rating: 24V, 1A
6. DIP Switch Setting
7. LED Indicators
Illuminated
O
PWR
(Green)
Primary power on
Primary power o or failure
Illuminated
O
RPS
(Green)
Redundant power on
Redundant power o or failure
Illuminated
O
ALM
(Red)
Alarm triggered for abnormal power status
and anomalous features.
Normal operation or DIP switch OFF
8. Environmental limits
-40°C ... 75°C (-40°F ... 167°F)
-40°C ... 85°C (-40°F ... 185°F)
5 to 95% (non condensing)
Operating Temperature
Storage Temperature
Ambient relative humidity
!ATTENTION:
This device complies with Part 15 of the FCC rules.
Operation is subject to the following conditions:
1. This device may not cause harmful interference.
2. This device must accept any interference received
including interference that may cause undesired
!ATTENTION:
If the equipment is used in a manner not specied by
the SALZ Automation GmbH, the protection provided
by the equipment may be impaired.
!ATTENTION:
Please leave at least 5cm of space at the left and right
of the unit for ventilation.
1 PWR ON: Primary power alarm reporting is enabled
OFF:Primary power alarm reporting is disabled
2 RPS ON: Redundant power alarm reporting is enabled
OFF:Redundant power alarm reporting is disabled
OFF ON
1
2
1000
(Green)
(1~8th
RJ45 port)
Illuminated
O
Link speed at 1000Mbps
Link speed at 10/100Mbps
LNK/ACT
(Green)
(1~8th
RJ45 port)
Port link-up
Activity (receiving or transmitting data)
Port disconnected or link failed
Illuminated
Blinking
O
Load External
Power
Address of the manufacturer:
SALZ Automation GmbH
Max-Planck-Str. 64
32107 Bad Salzuen, Germany
Email: [email protected]
Please scan for more information:

Other SALZ Switch manuals

SALZ 4008GT User manual

SALZ

SALZ 4008GT User manual

SALZ SWITCH 2008TX User manual

SALZ

SALZ SWITCH 2008TX User manual

SALZ 2016GT-E User manual

SALZ

SALZ 2016GT-E User manual

SALZ 2008GT User manual

SALZ

SALZ 2008GT User manual

SALZ 2005TX User manual

SALZ

SALZ 2005TX User manual

SALZ 2005GT User manual

SALZ

SALZ 2005GT User manual

SALZ 2016GT User manual

SALZ

SALZ 2016GT User manual

Popular Switch manuals by other brands

EUCHNER CES-AP-C01-CH-SA-100250 operating instructions

EUCHNER

EUCHNER CES-AP-C01-CH-SA-100250 operating instructions

MikroTik netPower 16P user manual

MikroTik

MikroTik netPower 16P user manual

NETGEAR EN308TC - 8 Port 10 Base-T Hub installation guide

NETGEAR

NETGEAR EN308TC - 8 Port 10 Base-T Hub installation guide

TRENDnet TK-804R Quick installation guide

TRENDnet

TRENDnet TK-804R Quick installation guide

Sarowin HMX-A4 user manual

Sarowin

Sarowin HMX-A4 user manual

Enabling Devices 605 user guide

Enabling Devices

Enabling Devices 605 user guide

Indu-Sol PROmesh P20 user manual

Indu-Sol

Indu-Sol PROmesh P20 user manual

FS S58 Series quick start guide

FS

FS S58 Series quick start guide

Hubbel CHANCE BP3R3M Installation, operation and maintenance manual

Hubbel

Hubbel CHANCE BP3R3M Installation, operation and maintenance manual

D-Link DGS-1005P/A1A Quick installation guide

D-Link

D-Link DGS-1005P/A1A Quick installation guide

Generac Power Systems RTSG300A3 owner's manual

Generac Power Systems

Generac Power Systems RTSG300A3 owner's manual

Elko iNels RFSA-61M Series manual

Elko

Elko iNels RFSA-61M Series manual

Harwil Q-10 Installation instruction sheet

Harwil

Harwil Q-10 Installation instruction sheet

Sling Media SlingStudio quick start guide

Sling Media

Sling Media SlingStudio quick start guide

H3C SecPath T9000-S quick start guide

H3C

H3C SecPath T9000-S quick start guide

Interlogix NS3552-16P-2T-2S Quick installation guide

Interlogix

Interlogix NS3552-16P-2T-2S Quick installation guide

Next Level Racing Flight Simulator Boeing Commercial Edition instruction manual

Next Level Racing

Next Level Racing Flight Simulator Boeing Commercial Edition instruction manual

3Com 3C16477A datasheet

3Com

3Com 3C16477A datasheet

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.