3.3.2.3 Voltage actual value sensing .................................................................................................35
3.3.2.4 Ground fault detection............................................................................................................37
3.4 Closed-loop control ................................................................................................................37
3.4.1 Fan in the door .......................................................................................................................37
3.4.2 Mushroom pushbutton ...........................................................................................................37
3.4.3 Description of the components...............................................................................................38
3.4.3.1 SINAMICS Control Unit..........................................................................................................38
3.4.3.2 DRIVE-CLiQ interface ............................................................................................................38
3.4.3.3 Voltage Sensing Module ........................................................................................................38
3.4.3.4 SITOP Select .........................................................................................................................39
3.4.3.5 Power supply unit...................................................................................................................39
3.4.3.6 Sirius safety relay...................................................................................................................39
3.5 Options...................................................................................................................................39
3.5.1 Internal synchronizing voltage detection (option A11) ...........................................................39
3.5.2 Damping switch for 1.4 kV (option C50).................................................................................39
3.5.3 Duty cycle (option C61)..........................................................................................................40
3.5.4 Black start (option E05)..........................................................................................................40
3.5.5 Phase shifter start (option E07)..............................................................................................41
3.5.6 Brake after phase shifter operation (option E08) ...................................................................41
3.5.7 Plug connection between the starting converter and excitation equipment (option G57) ......41
3.5.8 Temperature evaluation of the MV transformer (option K63).................................................42
3.5.9 Control Unit CU320-2 PN (option K95) ..................................................................................42
3.5.10 Inductive cable attenuation (option L05) ................................................................................42
3.5.11 Cabinet anti-condensation heating for the power unit (option L55)........................................43
3.5.12 Temperature-controlled and air-humidity-controlled anti-condensation heating (option
L58) ........................................................................................................................................43
3.5.13 Dust protection (option M11)..................................................................................................43
3.5.14 Lock barrel (option M40) ........................................................................................................43
3.5.15 Degree of protection IP41 (option M41) .................................................................................43
3.5.16 Separate installation (M49) ....................................................................................................43
3.5.17 Low-noise fan (option M65)....................................................................................................43
3.5.18 Customer-specific door stop for control cabinets (option M76)..............................................44
3.5.19 Line-side surge arresters (option N54)...................................................................................44
3.5.20 Machine-side surge arresters (option N56)............................................................................44
3.5.21 Line-side fuses (option N58) ..................................................................................................44
3.5.22 Cabinet lighting in the power unit (option N86) ......................................................................44
3.5.23 Customized locking system (option Y41) ...............................................................................44
3.5.24 Customized duty cycle (option Y45).......................................................................................45
4 Preparations for use ...................................................................................................................................47
4.1 Notes for system integrators ..................................................................................................47
4.1.1 Requirements for transformers ..............................................................................................47
4.1.2 Selection and configuration of multi-winding transformers.....................................................48
4.1.3 Requirements for the circuit breaker provided by the customer.............................................49
4.1.4 Requirements for cables ........................................................................................................52
4.2 Requirements when mounting and installing the device ........................................................53
4.2.1 Requirements for installation location ....................................................................................53
4.2.2 Requirements placed on the levelness of the floor ................................................................54
4.3 Inspections when receiving the delivery.................................................................................54
4.3.1 Checking shock and tilt indicators..........................................................................................54
Table of contents
SINAMICS GL150 6SL38502UM114PA0Z
6Operating Instructions Rev.201910281441 EXAMPLE