
Installation Instructions: p/n 16032922-01 rev A
Page 2 of 3
BASES AND RISER FRAMES
Synchronization and Ganging Kit, continued
ErgoStat® Pro
5. Continue routing the cable through the cable manag-
ers along the bracket of the adjacent ErgoStat Pro
Base, through the front stretcher notch, and inside the
stretcher of the adjacent base, plugging other end of
the cable into port "A2" on the second base. Manage
excess cable with stretcher cord managers.
6. To properly initialize the synchronization of the bases,
press and hold the down button on the control switch
of either hand control until the bases come to a com-
plete stop in the lowest position. Release the down
button and wait 2-3 seconds. Then press the down
button again.
7. Align the top surfaces as desired. Use the ganging
straps to mark appropriate pilot locations near the
front and back corners of the surface joint. Drill pilot
holes using a 1⁄8" drill bit and cordless drill/driver.
ganging strap
press and hold
down button
repeatedly
8. Install a ball head wood screw into each pilot hole
using a #2 Phillips screwdriver/bit.
ball head wood screw