1) Inspection of rotation direction extract fan.
2) Inspection rotation direction in let fan.
3) Pressure switch fresh air filter (inlet) (FV1)
4) Pressure switch extract filter (FV2)
5) Pressure switch, inlet fan (VV1)
6) Inspection cover electrical heater battery
(VB1), sensors for fire- (BT1) and overheat
thermostats (OT1)
7) Fuse control circuit (E3)
8) Fuse for heater battery (E2)
9) Fuse for fans (E1)
10) Overheat thermostat (OT1)
11) Fire thermostat (BT1)
12) Auto transformers for fanspeed
13) Sensor for extract air temperature (room
temp.) (T1)
14) Sensor for inlet air temperature (T2)
15) Junction box with sensor for outdoor
temperature (T3)
16) Defrost sensor (T4)
17) Motor for bypass (SM1)
18) Motor for internal damper (SM2)
19) Frames for filters (F1 and F2)
20) Terminals (Terminal blocks 0 to 4 and
mains supply)
21) Reset thermal contactor protection for inlet
fan (TK1)
1) Отверстие для проверки направления
вращения вытяжного вентилятора
2) Отверстие для проверки направления
вращения приточного вентилятора
3) Реле давления приточного фильтра (FV1)
4) Реле давления вытяжного фильтра (FV2)
5) Реле давления приточного вентилятора
(VV1)
6) Инспекционная крышка электрического
нагревателя (VB1), датчиков пожарного
термостата (BT1) итермостата перегрева
(OT1)
7) Предохранители управляющего контура
(E3)
8) Предохранители нагревателя (E2)
9) Предохранители вентиляторов (E1)
10) Термостат перегрева (OT1)
11) Пожарный термостат (BT1)
12) Автотрансформаторы скорости
вентиляторов
13)Датчик температуры удаляемого воздуха
(комнатной температуры) (T1)
14) Датчик температуры приточного воздуха
(T2)
15) Распределительная коробка сдатчиком
наружной температуры (T3)
16) Датчик оттаивания (T4)
17) Привод байпаса (SM1)
18) Привод внутреннего клапана (SM2)
19) Рамы для фильтров (F1 иF2)
20) Клеммные колодки (0-4 ипитающее
напряжение)
21) Кнопка перезапуска защиты приточного
вентилятора (TKV1)
Рис. 15
COMMISSIONING
PROCEDURE
Both unit and controller have been tested and found in order at the
factory (see separate checklist). Damage may, however, occur during
transportation and/or installation. The unit should therefore be tested
after installation according to the start procedure below (also see fig.
15):
1) Is the unit visibly damaged?
2) Are filters (2 pcs.) and exchanger blocks (2 pcs.) installed in the
unit?
3) Have the unit and duct runs and the building (rooms) been cleaned
before commissioning the system?
4) Are all louvres/diffusers and grills in the duct system open?
5) Is the unit supplied in accordance with voltage of the building (415 V
3AC)?
6) Is the electrical connection between controller and unit correct (see
page 13).
7) Are the two sections connected by means of external extension
lead and connector?
8) If supplied, are motors for inlet-/exhaust damper correctly
connected to terminals in the unit (see fig. 12 page 15).
9) If supplied, are motors for bypass (item 17 fig. 15) correctly
connected to terminals in the unit
(see fig. 11 page 15).
10) Switch on fuse E3, E2 and E1 (item 7, 8 and 9, fig. 15) in the unit,
and main switch for the unit in the building's fuse box.
11) Press switch marked "day" under programme on the controller, and
the system will start.
12) Check that rotation direction of the fans is anti clockwise, checking
through inspection hole (remove cover) on the fans (item 1 and 2
fig.15).
Note! If the unit is installed in a cold place, the defrost sensor
(item 16 fig. 15) in the unit might have switched off the inlet
fan. The inlet fan will not start immediately. The defrost
sensor must be heated up to 5-7°C before the fan will start.
13) Is condensate drain correctly installed (see fig. 14 page 19).
14) Mount plastic coated user instructions on the wall beside the
controller.
15) Set programme in controller to wanted running hours and
temperatures according to instructions page 22-23.
16) Hand over User and Maintenance instructions to site owner.
ПУСК АГРЕГАТА
ПРОЦЕДУРА
Агрегат ипанель управления тестируются на заводе (см.
проверочный лист). Однако во время транспортировки имотажа
могут произойти повреждения. Поэтому агрегат должен
тестироваться после завершения монтажа согласно нижеописанной
процеуре (см. рис. 15):
1) Имеются ли видимые повреждения агрегата?
2) Установлены ли фильтры итеплообменник?
3) Свободны ли отверстия воздуховодов, убран ли строительный
мусор впомещении перед пуском агрегата?
4) Открыты ли все диффузоры, жалюзи ирешетки вентиляционной
системы?
5) Подается ли соответствующее электропитание на агрегат (3ф-
415Впеременного тока)?
6) Правильно ли подключена панель управления кагрегату (см.
стр. 13)?
7) Соединены ли две секции агрегата удлинительным кабелем и
соединителем?
8) Если предусмотрены, подсоединены ли приводы приточного/
вы-тяжного клапанов ксоответствующим клеммам агрегата (см. рис.
12)?
9) Если предусмотрен, подсоединен ли привод байпаса (поз. 17,
рис. 15) ксоответствующим клеммам агрегата (см. рис. 11).
10) Включите предохранители E1, E2 иE3 вагрегате (поз. 7, 8 и9,
рис. 15) иглавный выключатель вщите здания.
11) Нажмите переключатель, отмеченный "DAY" на панели
управления иагрегат начнет работать.
12) Убедитесь, что вентиляторы вращаются против часовой
стрелки, смотровые отверстия (сняв крышки) на вентиляторах поз.1
и2 рис. 15.
Внимание!Если агрегат устанавливается внеотапливаемом
месте, датчик оттаивания (поз. 16, рис. 15) должен отключать
приточный вентилятор. Приточный вентилятор будет иметь
задержку пуска, пока датчик оттаивания не прогреется до 5-7°C.
13)Правильно ли смонтирован дренаж конденсата (см. рис. 14)?
14)Закрепите на стене впластиковом конверте инструкцию
пользователя рядом спанелью управления.
15)Установите на панели управления необходимые часы работы и
рабочие температуры согласно инструкции (раздел
«Программирование»)
16) Передайте инструкцию пользователя владельцу агрегата.