Systems Trading Corporation Clear View User manual

Introduction
Before Starting Assembly:
5. Make sure you have the proper tools:
After choosing a location, proper preparation of the site is essential. The site must be level. If the site is
not level, create a base slightly larger than the outside dimensions of the greenhouse making a frame of
two by fours lled with either soil, sod or gravel. Make sure the base is square by measuring the diagonals
from both sides to ensure they are equal. The greenhouse is secured from the inside with included pegs.
See step15 for details.
If you decide to have a concrete base, it is best to hire a reliable contractor to build it to ensure it is at and
level. Make sure you have checked with your local authorities regarding any required building permits.
When selecting a site for your greenhouse, a at level area is essential and if possible, with proper water
drainage and easy access to power and water necessary for greenhouse gardening.
Choose a sunny, level position away from overhanging trees and power lines and protected from the
wind as much as possible. The location should be away from structures that could cause snow to drift
on or around the greenhouse.
Locate underground pipes or cables before preparing the site or anchoring the greenhouse.
NOTE: You may assemble the greenhouse on a hard level surface and move it to its nal position when
nished. Make sure there are no obstacles between the assembly area and the nal position.
Thank you for purchasing the 6x8 Clear ViewTM Greenhouse. This greenhouse combines clear window shaped
panels for the sides with the functionality of twin panel polycarbonate panels to help maintain consistent
temperature. Properly assembled and maintained, this greenhouse will provide many years of enjoymen
t.
The List of Parts has the corresponding step number referenced to each part. We recommend that while
you go through the list, make staging areas for each step and place the parts necessary for each step in
these areas. This will save you time and eort during assembly
2. Lay out the parts in separate staging areas:
3. Select a Location:
4. Prepare a Foundation:
1. Make sure you have all the necessary parts:
Compare the contents of the two cartons to the List of Parts. If any parts are missing or damaged or you
have any questions, please contact customer service by phone at (877) 407-9100 ext. 2 or by email at
NOTE: A cordless drill with Phillips head bit is highly recommended.
Tape Measure
Work Gloves
Safety Goggles
Phillips Screwdriver
Spirit Level
Small Step Ladder
Wooden Mallet
Liquid Soap or WD40 Lubricant
Scissors
Hex Key (included)
tttttttttt
1 of 50
www.stcny.com
Our patented greenhouse has been designed to be easily assembled. All but one step can be completed by
one person. You will need assistance from another person to attach the roof. Although the greenhouse can
be assembled in six to eight hours, we recommend you take your time and make it a weekend project.
These instructions include helpful hints and important information needed to safely assemble and properly
maintain the greenhouse. Please read these instructions completely before you begin.
CAREFULLY READ ALL INSTRUCTIONS BEFORE YOU BEGIN.
FOLLOW THE STEPS IN THE ORDER THEY ARE PRESENTED.
For composting tips, please visit www.ecomposter.net.
ACF Greenhouses

2 of 50
www.stcny.com
General Order of Assembly
Step 1: Assemble Back
Step 2: Assemble Door
Step 3: Assemble Front
Step 4: Assemble Sides
Step 5: Prepare Shelves
Step 6: Connect Sides to Back
Step 7: Connect Sides to Front
Step 8: Assemble Roof Vent
Step 9: Assemble and Connect Gables and Roof Vent
Step 10: Brace Sides
Step 11: Install Circular Vent
Step 12: Install Side and Roof Panels
Step 13: Install Trim Plates
Step 14: Hang Door
Step 15: Secure to Ground
Step 16: Install Trays and Bin Holder
Introduction .........................................
Safety Advice .......................................
General Order of Assembly ............
List of Parts ...........................................
Assemble Back ....................................
Assemble Door ...................................
Assemble Front ..................................
Assemble Sides ...................................
Prepare Shelves ..................................
Connect Sides to Back ......................
Connect Sides to Front .....................
Assemble Roof Vent .............................
Assemble and Connect Gables ......
Install Roof Vent ..................................
Brace Sides ............................................
Install Circular Vent ...........................
Install Side and Roof Panels ............
Install Trim Plates ................................
Hang Door ..............................................
Secure to Ground ................................
Install Trays and Bin Holder .............
1
3
4
9
5
8
13
12
14
16
17
10
6
7
11
2
15
Safety Advice
The greenhouse must be positioned and xed on a at level
surface.
Dispose of all plastic bags safely. Keep them out of the reach of
small children.
Keep children and pets away from the assembly area until the
work is completed.
Always wear shoes, gloves and safety goggles when working.
In manufacturing all sharp edges and burs have been removed
but caution should still be taken when handling metal parts.
Do not lean against or push the greenhouse during assembly.
Take special care not to touch overhead power lines with the
aluminium proles.
Do not attempt to assemble the greenhouse in windy or wet
conditions.
Do not position your greenhouse in an area exposed to excessive
wind.
If using power tools or a step ladder always follow the
manufacturers safety instructions.
Hot items such as recently used grills, blowtorches etc. must not
be stored in the greenhouse.
Store the polycarbonate panels in a cool dark place like a garage
until you are ready to use them.
Make sure the greenhouse complies with local building codes.
Table of Contents
1
2
2
3
6
14
17
25
30
31
33
36
37
39
43
44
45
46
48
49
50
ACF Greenhouses

G14A
G14C
G14D
2
2
2
Step 5
G14B 2 Step 5
G17A 1 Step 3
G17B 1 Step 3
G17C 1 Step 1
G17D 1 Step 1
Step 5
Step 5
G05D
G05D
G05E
1
1
1
Step 1
Step 9
Step 2
G05B
G06A
G06C 1
1 Step 3
G10A 1 Step 8
G11A 1 Step 8
G12A 2 Step 8
G06B 1 Step 3
G07A 2 Step 4
G07B 2 Step 4
Step 3
Prole QTY
G01A
G02A
G02C
G02D
G02E
G02F
G02G
1
1
2
1
1
1
1
1
4
Step 3
Step 3
Step 3
Steps 1,3
G02B 2 Steps 1,3
Step 1
Step 1
Step 1
Step 9
G02M 1 Step 9
G03A
G03C
G03D
G03F
G03E
G03G
1
2
1
1
3
1
Step 9
Step 9
Step 4
G03B 4 Step 4
Step 1
Step 1
G04C
G04D
G04E
2
2
2 Step 16
G04B 2 Step 4
Step 4
Step 4
Step 9
G03H 1 Step 9
Step 4
G01B
G01C
Prole QTY
G13A 2
1
1
Step 2
Step 2
Step 2
G13B
G13C
3 of 50
www.stcny.com
List of Parts
!
The greenhouse is shipped in two cartons. These cartons are heavy. Be careful when lifting them.
Wear proper safety gear including work shoes, gloves and goggles.
The parts are identied by removable stickers.
Place all the parts for each step in staging areas, checking that you have all parts as you go.
If any parts are missing or damaged, contact STC customer service before beginning assembly:
ACF Greenhouses

Clear Panel QTY
1 Step 3
2 Step 1
GY1
1 Step 1GY7
GY2
1 Step 1
GY3
1 Step 3GY5
1 Step 3GY6
1 Step 1GY8
1 Step 3GY9
1 Step 1GY4
Clear Panel QTY
1 Step 2GY10
1 Step 2GY11
4 Step 12GY12
4 Step 12GY13
1 Step 3GY15
4 Step 12Y11
3 Step 12Y12
1 Step 12Y13
1 Step 10Y27
Twin Panel QTY
4 of 50
www.stcny.com
circular vent
vent frame
plastic nut 4
1 Step 11
1 Step 11
Step 11
#S41 screw 4 Step 11
Circular Vent QTY
Steps 1,3,10
Hex Key
S06
S07
S16
G15A
S23
4
1
1
24 Steps 1,3,10
Steps 1,3
8
3 Step 9
Step 10
Step 2
Bracing Parts QTY
1S25 Step 8
Roof Vent Handle QTY
Door Handle QTY
S29
S30
S31
S32
S33
2
1 Step 2
Step 2
Step 2
Step 2
Step 2
1
1
1
ACF Greenhouses

5 of 50
www.stcny.com
Connector QTY
16
6
2
Steps 1,4
Step 1
1
Step 3
Step 3
1
Steps 1,3,4
S11
S17L
S17R
S08
S01
12 Steps 5,15S37
2 Step 9
4 Step 4
S22
S20
Connector QTY
4
2
2
Steps 1,3
Steps 1,3
2 Steps 1,3
2 Steps 1,3
Step 4
S05
S09
S10
S04
S03
2 Step 4S19
2 Step 4S39
1 Step 9S21
1
6 Steps 2,3
Step 3
1 Step 1
S28
S18
S12
G09A 2 Step 13
G09B 2 Step 13
J02L 2 Step 13
J02R 2 Step 13
J03 2 Step 13
J04 1 Step 13
Trim Plate QTY
20
J05 Step 16
Shelf Trays QTY
6
6
S34
S35
Step 15
Step 15
Anchor Clip and Peg QTY
Connector QTY
124
7
7
Steps 1,2,9
Steps 1,2,9
Step 8
4 Step 16
Steps 1,2,3,4,8
S13
2
S14
S24
Step 91S41
Step 84S26
S36
S02
ACF Greenhouses

Assemble Back
1.1A
1.2A
Secure with S02 screws.
1.1B
Secure each S01 connector
with two S02 screws.
1.2B
26”
(600 mm)
L02B
G02A
S01
QTY
4
6
#S01
#S02
QTY
1
1
1
1#G03C
#G03D
Prole Connector
QTY
Prole
#G02A
#G02B
Line up bottom hole on short side of
connectors S01 with hole on side of
proles G03C and G03D.
Slide short side of connector S01 into channels of proles G02A and G02B.
Line up last hole on connector S01 with hole in each prole.
26”
(600 mm)
G03C G03D
S01
S02
S02
!
Lay out all the parts for the back face in a staging area.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
!The back is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
IMPORTANT: The holes are not at the midpoint of the prole.
Arrange prole so the 26” portion will be the bottom when standing.
6 of 50
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
ACF Greenhouses

1. A
1. B
Secure with four S02 screws.
G02B
G03D
G03C
G03C G03D
G02A
G17D
G17C
G02A
G02B
Attach proles G02B and G03C to prole G17C by sliding the long sides of connector S01
into channels lining up last hole in S01 with holes in prole G17C. Attach proles G03D
and G02A to prole G17D by sliding the long side of connector S01 into prole
channels lining up last hole of S01 with holes in G17D.
7 of 50
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
QTY
QTY
1#G17D
1#G17C
Prole Screw
4#S02
G17C
G17D
G17C
ACF Greenhouses

Slide connectors S08 into channels of proles G03C and G03D.
1.4A
1.5
1#S05#S04
QTY
QTY
1
Connector Connector
QTY
1#G01B
Prole
QTY
4
2
#S02
#S08
Connector
S05
S04
G01B
S04
G01B
S05
G01B
Slide connectors S04 and S05 into prole G01B until they securely click into place.
Secure with four S02 screws.
1.4B
8 of 50
www.stcny.com
G02B G03C
S08
S08
S08
S02
G03D
G02A
NOTE: ALL VIEWS ARE FROM INSIDE.
Connectors S04 and S05 CLICK into place.
There is only one way to properly fasten connectors into proles. Line up parts
rst to ensure correct placement. Slide connectors until they CLICK securely into
prole. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
ACF Greenhouses

1.7A
Carefully line up connector S04 with prole G02B and
connector S05 with prole G02A. Slide prole G01B half
way into place. Continue sliding until connectors S04 and
S05 click securely into proles.
QTY
4#S02
Screw
9 of 50
www.stcny.com
There is only one way to properly fasten connectors into proles. Line up parts
rst to ensure correct placement. Slide connectors until they CLICK securely into
prole. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
1.6
NOTE: ALL VIEWS ARE FROM INSIDE.
Line up holes on connectors S08 with holes in
prole G01B and secure with four S02 screws.
1.7B
Connectors S04 and S05 CLICK into place.
Remove protective plastic from both sides of
panels GY2 . The clear panels are designed
with window shapes that curve outward.
Place the outward curved side facing
down. The rst row of ribbed edges
t securely into V-channels of
proles G02A, G02B, G03C,
G03D, G17C and G17D.
Remove protective plastic from EACH side of clear
panels before installing. Dispose of plastic properly.
Install with outward curved side FACING DOWN.
!
G02B
G03C
G03D
G02A
G17D
G17C
S04
S05
G01B
G03C G03D
G02A
G01B
S02
GY2
GY2
QTY
2
Clear Panel
#GY2
G02B
GY2
GY2
ACF Greenhouses

1.9A
1.9B
1.9C
G05B
Remove protective plastic from both sides of panels GY3, GY4, GY7 and GY8. The clear panels are
designed with window shapes that curve outward. Place the outward curved side facing down. The
rst row of ribed edges t securely into the V-channels.
Fit panel GY3 into V-channel of prole G05B.
Slide panels GY4, GY7 and GY8 into V-channels
on proles G02A, G02B, G03C and G03D. Fit inside
V-channels on proles G05B, G17C and G17D.
10 of 50
www.stcny.com
1.8A
Slide hex bolt S13 into channels of proles G05B as shown.
Screw hex nut S14 onto bolt. Do not
completely tighten.
1.8B
Slide GY3 into into V-channels on proles
G03C and G03D. Continue to slide until
the ridges on the bottom edge t into
bottom prole G01B.
QTY
QTY
1#G05B
Prole Bolt/Nut
2
2
#S13
#S14
G05B
S13
S14
G05B
Remove protective plastic from EACH side of clear
panels before installing. Dispose of plastic properly.
Install with outward curved side FACING DOWN.
!
G01B
G03C
G03C
G03D
G03D
G02A
G02B
GY3
G05B
1
QTY
1
QTY Clear PanelClear Panel
1
1
#GY3
#GY4
#GY7
#GY8
GY3
GY7
GY8
GY4
ACF Greenhouses

1.10
1.11A
Slide hex nut S14 and hex bolts S13 into U-cutout in side of
proles G03C and G03D. Tighten securely to hold prole
G05B in place.
QTY
1#S12
Connector
QTY
1#S09
QTY QTY
1#S10
ConnectorConnectorProle
1
1
#G02C
#G02D
G05B
11 of 50
www.stcny.com
There is only one way to properly fasten connectors into proles. Line up parts
rst to ensure correct placement. Slide connectors until they CLICK securely into
prole. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
NOTE: ALL VIEWS ARE FROM INSIDE.
Slide proles G02C and G02D into connectors S09, S10 and S12 until they click into place.
G02C
S09
S10
G02D
G02C G02D
S12
Connectors S09, S10 and S12 CLICK into place.
IMPORTANT: The holes are not at the midpoint of the proles. Arrange
prole so the 24.5” portion will be the bottom when standing.
24.5”
(623 mm)
24.5”
(623 mm)
S09
G02D
G02C
S10
S12
G03C
G03D
ACF Greenhouses

1.12A
Place connectors S11 onto proles G02C and G03C
and G02D and G03C matching up all holes.
Screw S02 screws partially into
bottom two holes. Do not tighten.
Screw S02 screws into top two holes.
Tighten all screws. Repeat for both sides.
1.12C
1.12B
QTY
8
2
#S02
#S11
Connector
12 of 50
www.stcny.com
There is only one way to properly fasten connectors into proles. Line up parts
rst to ensure correct placement. Slide connectors until they CLICK securely into
prole. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
NOTE: ALL VIEWS ARE FROM INSIDE.
Slide connectors S09 and S10 half way into proles G02A and G02B. Continue sliding
together making sure panels GY4, GY7 and GY8 t into
V-channels of proles G02C and G02D.
Connectors click securely into proles.
S11
S02
S02
S10
G02A
S09
G02B
Connectors S09 and S10 CLICK into place.
1.11B
S02
S02
G02C
G02B
G02A
G02D
S09
S10
GY7
GY8
GY4
G03C
G03D
G02D
G02C
ACF Greenhouses

1.14
Insert long side of cable connector S06 into prole channel G02B with hook facing up. Slide
connector to other side of channel. Use hex key to securely tighten and hold in place.
Repeat step 1.13 inserting cable connectors S06 into proles G02A and G01B. Cable rests over prole
G17D. Slide connector until prole corners are square and cable is tight. Securely tighten second
connector to hold in place.
2#S16#S06
QTY
QTY
4
Cable Connector Cable
QTY
1
Hex Key
1.1 A
1.1 B
13 of 50
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
IMPORTANT: Make sure all corners are squared at 90 degrees.
Attach one side of short cable S16 to hook and lace over prole G17C. Attach other
side of cable to another S06 cable connector. With hook facing the center, insert connector into
prole channel G01B and push towards center until prole corners are square and cable is tight.
Use hex key to securely tighten and hold in place.
GY7
GY8
G02B
G01B
G02A
G17D
G17C
ACF Greenhouses

QTY
Clear Panel
1
#GY11
Assemble Door
2.1A
2.2
Slide three hex bolts S13 into channel
of prole L05E.
Screw two S14 hex nuts onto bolt on each end.
Do not completely tighten.
2.1B
QTY
Clear Panel
1
#GY10
QTY
QTY
1#G05E
Prole Bolt/Nut
3
2
#S13
#S14
G05E
!
Lay out all the parts for the door in a staging area.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
!The door is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
Remove protective plastic from both sides of panels GY10 and GY11. The clear panels are designed
with window shapes that curve outward. Place the outward curved side facing down. The rst row
of ribbed edges t securely into V-channels of prole G05E.
14 of 50
www.stcny.com
Remove protective plastic from EACH side of clear panels before installing.
Dispose of plastic properly. Install with outward curved side FACING DOWN.
!
NOTE: ALL VIEWS ARE FROM INSIDE.
G05E
S13
G05E
G05E
GY10
GY11
S14
ACF Greenhouses

2.
2.4A
2.4B
Secure connectors with six S02 screws.
Slide hex nuts and bolts into U-cutout in side of proles
G13B and G13C. Tighten securely to hold in place.
Place door proles G13A, G13B and G13C next to connectors S28 around GY10 and GY11
panels as shown. Slide connectors into proles. Make sure panels and prole G05E t into
V-channels of each prole. Note: S28 connectors will be secured to proles in Step 2.4.
G13B G13A G13B
G13C
G13A
G13A
S28
NOTE: The holes at the top of prole G13B and the bottom
left corner of prole G13A will be secured in Step 2.5.
!
G13A
G13C
#S28
QTY
4#S02
QTY
6
1
1
2
Screw Connector
QTY
Prole
#G13A
#G13B
#G13C
15 of 50
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
G13B
G13A
G13C
G13A
S28
S28
S28
S28
GY10
GY11
GY10
GY11
ACF Greenhouses

2.5
NOTE: Connectors packaged as Door Handle Kit.
Slide washer S32 into groove on pin S29 to
hold securely in place.
Hook one side of spring S33 into hole on handle S30. Hook the other
side into pin hole on prole G13C.
Place brace G15A onto door lining up the holes on each end with the holes in proles G13A
and G13B. Slide hex bolt so it ts through hole in brace. Secure brace with two S02
screws and S14 hex nut.
2.6B
2.6C
S14
IMPORTANT: The hole for hex bolt is not at the midpoint of brace. Turn
brace until all holes line up. Brace will dip slightly when hex bolt is secured.
2.6A
Open door handle kit and remove parts. Slide pin S29 through handle S30, washer S31and hole in
prole G13C into washer S31.
S32
G13C
G13C
S33
QTY
Screw/Nut
2
1
#S02
#S14
QTY
Brace
1#G15A
16 of 50
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
S29
S30
S31 S31
G13C
1
QTY
2
QTY
Connector
Connector
1
1
#S29
#S30
#S31
#S32
#S33
1
G13A
G13A
G13B
G13C
G15A
ACF Greenhouses

Assemble Front
Lay out proles G02A, G02B, G06A and G06B so all holes line up. Slide short
side of connector S01 into channels of proles G02A, G02B, G06A and G06B.
Line up lower hole on connector S01 with hole in each prole and secure with S02 screws.
26”
(600 mm)
G06B G06A
G06B
G06A
26”
(600 mm)
G02B
G02A
G02B
G02A
G06A
S01
G02A
S01
G02B
S01
G06B
S01
!The front is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
!
Lay out all the parts for the front face in a staging area.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
IMPORTANT: The holes are not at the midpoint of the prole.
Arrange prole so the 26” portion will be the bottom when standing.
.1A
.1B
17 of 50
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
QTY
4
4
#S01
#S02
QTY
1
11
1 #G06A
#G06B
Prole Connector
QTY
Prole
#G02A
#G02B
ACF Greenhouses

. A
. B
S28 S28
G06B
G06A
G06C
Secure with four S02 screws.
Attach proles G02B and G06B to prole G17B. Slide long sides of connectors S01 into channels of prole
G17B, lining up last hole in S01 with holes in prole G17B. Attach proles G06A and G02A to prole G17A.
Slide long side of connectors S01 into channels of proles G17A, lining up last hole of S01 with holes in G17A.
QTY
QTY
1#G17B
1#G17A
Prole Screw
4#S02
S28
.2A
Slide proles G06C into G06A and G06B using connectors S28. Note: S28 connectors do
not snap into place.
Secure each connector with two S02 screws.
.2B
Place connectors S17L and S17R on corners
matching up bottom two holes with holes
in proles G06A, G06B and G06C as shown.
.2C
S17R
G06A
#S17R
#S17L
QTY
2#S28
QTY
1#G06C
Prole Connector
22
S17L
G06B
S17L
S02
18 of 50
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
S17R
S17L
G06B
G06A
G06C
S17R
S02
G02B
G02A
G06B
G06A
G17B
G17A
G17B
S01
S02
S01
G02B
G02A
G06B
L06A
G17B
G17A
ACF Greenhouses
Table of contents
Popular Greenhouse Kit manuals by other brands

Tradgardsteknik
Tradgardsteknik SCANDI 600 installation guide

Alton
Alton VICTORIAN OAKHAM instruction manual

Riverstone Networks
Riverstone Networks Monticello Black Premium Assembly instructions

Palram
Palram Snap&Grow user manual

Kogan
Kogan CERTA CTGAGH211SA user guide

Juliana
Juliana OASIS Assembly instruction

Riverstone Networks
Riverstone Networks Monticello 8x20 Assembly instructions

ClearSpan
ClearSpan 104903 Assembly instructions

One Stop Gardens
One Stop Gardens 97439 Setup and maintenance instructions

oGrow
oGrow OG6834-S product manual

Redpath
Redpath Statesman Series Instructions & Illustrations

DrivhusSenter
DrivhusSenter Forta Assembly manual