Installation Instructions:
1. Decide which power source you will be tapping into in order to power the light.
a. Connecting to power and ground that is switched with the ignition or the tail lights is a
simple way to power the unit utilizing existing wiring.
2. Mount the light using the included rubber grommet.
3. When installing the controller, tap into any 12V+ source that is accessible from the dash
area.
4. The unit should now be fully operational.
Operating Instructions:
1. Before linking the light to the control, apply power and wave a magnet over the light to
configure it either as a marker when power is applied, or to come on when the switch it is
linked to is activated.
2. Determine which lights you wish to activate when a particular switch or function is
activated at the controller/switch panel.
3. Activate the selected switch or pattern on the controller/switch panel.
4. With the desired pattern/switch activated, wave a magnet over the light(s) you wish to
activate with it.
a. The light should now come on any time the selected pattern/switch is activated from
the control panel.
5. Once linked, activate the light and choose from several pre-programed patterns of the
light by waving a magnet over it once again.
6. Repeat steps 1-5 for each light strip you wish to program. They can all activate with
different functions, all together, in pairs, or any way that suits your needs.
Instructions for Adjusting Controller Signal Power:
Some PLC installations require more signal power than other installs. The following is an
explanation of the procedure for setting the output power level.
1. Preparing your control
a. Apply 12V power to the 6-button control. Verify that the PLC indicator is flashing
red/green. Also, verify that all other functions are “activating” on the control.
b. REMOVE POWER