
3 Commissioning checklist
6System installation instructions 0020257196_01
Work Comments/settings
92 Zone activated Current value display: No /Yes
93 Day temperature 20 °C
94 Set-back temp. 15 °C
95 Room temperature Current value display
96 Zone assignment VRC 700
97 Zone valve status Current value display (closed/open)
98 ZONE2
99 Zone activated Current value display: No /Yes
100 Day temperature 20 °C
101 Set-back temp. 15 °C
102 Room temperature Current value display
103 Zone assignment VR91 ad.1
104 Zone valve status Current value display (closed/open)
105 Domestic hot water
106 Cylinder active Condition: Domestic hot water cylinder in the system
107 Target flow temp. Current value display
108 Domestic hot water 60 °C
Inform the end user about the anti-legionella function
109 Current cyl. temp. Current value display
110 Cyl. charging pump Current value display: off /On
111 Circulation pump Current value display: off /On
112 Anti-legionella day –Select: off,Monday,Tuesday,Wednesday,
Thursday,Friday,Saturday,Sunday,Monday -
Sunday
–Factory setting: off
113 Anti-legionella time 04:00
114 Cyl. boost hysteresis 5 K
115 Cylinder boost offset 25 K
116 Max. cyl. charg. time 45 min.
117 DHW req. anti-cy time 30 min.
118 Ch. pump overrun time 5 minutes
119 Parallel cyl. charging off
120 Menu →Installer level →Service information
121 Enter contact details Telephone number/company
122 Service date Next service on Maintenance interval: 1 year
→End user menu Implement the settings for the end user/inform the end
user
123 Menu →Basic settings →Enter zone name →ZONE1 →Change Enter a suitable name for the zone, e.g. Flat 1
(In consultation with the customer)
124 Menu →Basic settings →Enter zone name →ZONE2 →Change Enter a suitable name for the zone, e.g. Flat 2
(In consultation with the customer)
125 Menu →Desired temperatures →ZONE1 Zone1 (name after being renamed)
126 Day temp. heating 20 °C
127 Day temp. cooling 24 °C
128 Set-back temp. heat. 15 °C
129 Room temperature Current value display
130 Menu →Time programmes →ZONE1 Changed the time schedule for Zone 1 (name after being
renamed) following consultation with the customer
Zone 1 = heating circuit 1
131 HEATING 1: Cooling change following consultation with the customer
132 Domestic hot water change following consultation with the customer
133 Circulation change following consultation with the customer