2
Please follow these safety instructions closely to
prevent accidents and material losses.
Safety instructions explained
!Please note
This symbol warns against the risk of material
losses and environmental pollution.
Note
Details identified by the word "Note" contain additional
information.
Target group
These instructions are exclusively intended for author-
ised contractors.
■Work on electrical equipment must only be carried
out by a qualified electrician.
Regulations to be observed
■National installation regulations
■Statutory regulations for the prevention of accidents
■Statutory regulations for the protection of the envi-
ronment
■Codes of practice of the relevant trade associations
■All relevant safety regulations as defined by DIN, EN,
DVGW, VDE and locally applicable standards
aÖNORM, EN and ÖVE
cSEV, SUVA, SVTI, SWKI and SVGW
Working on the system
■Isolate the system from the power supply (e.g. by
removing the separate fuse or by means of a mains
isolator) and check that it is no longer 'live'.
■Safeguard the system against reconnection.
Safety instructions
5698367

3
1. Information Disposal of packaging ............................................................................ 4
Symbols ................................................................................................. 4
Intended use .......................................................................................... 5
2. Installation sequence Components .......................................................................................... 6
■Tiled roof cover and barrel roof tile cover ........................................... 6
■Plain tile and slate roof cover ............................................................. 7
Uncovering the roof ............................................................................... 7
Fitting the timbers .................................................................................. 7
Fitting the front panel ............................................................................. 8
Installing the collector ............................................................................ 9
Fitting the lower casing and hydraulic connections ............................... 10
■Fitting the collector temperature sensor ............................................. 12
Fitting the right and left casing ............................................................... 14
Fitting the upper casing ......................................................................... 14
Covering the roof ................................................................................... 16
■Tiled roof cover ................................................................................... 16
■Barrel roof tile cover ........................................................................... 17
■Slate and plain tile cover .................................................................... 17
Covering the collector array ................................................................... 18
3. Installation ................................................................................................................ 19
4. Commissioning ................................................................................................................ 21
Index
5698367

4
Disposal of packaging
Please dispose of packaging waste in line with statu-
tory regulations.
DE: Use the disposal system organised by
Viessmann.
AT: Use the ARA statutory disposal system (Altstoff
Recycling Austria AG, licence number 5766).
CH: Packaging waste is disposed of by the HVAC
contractor.
Symbols
Symbol Meaning
Reference to other document containing
further information
1.
Step in a diagram:
The numbers correspond to the order in
which the steps are carried out.
Warning of material losses and environ-
mental pollution
Live electrical area
Pay particular attention.
■Component must audibly click into place.
or
■Acoustic signal
■Fit new component.
or
■In conjunction with a tool: Clean the sur-
face.
Dispose of component correctly.
Dispose of component at a suitable collec-
tion point. Do not dispose of component in
domestic waste.
Disposal of packaging
5698367

5
The appliance is only intended to be installed and
operated in sealed unvented systems that comply with
EN 12828 / DIN 1988, or solar thermal systems that
comply with EN 12977, with due attention paid to the
associated installation, service and operating instruc-
tions. DHW cylinders are only designed to store and
heat water of potable water quality. Heating water buf-
fer cylinders are only designed to hold fill water of pot-
able water quality. Only operate solar collectors with
the heat transfer medium approved by the manufac-
turer.
Intended use presupposes that a fixed installation in
conjunction with permissible, system-specific compo-
nents has been carried out.
Commercial or industrial usage for a purpose other
than heating the building or DHW shall be deemed
inappropriate.
Any usage beyond this must be approved by the man-
ufacturer for the individual case.
Incorrect usage or operation of the appliance (e.g. the
appliance being opened by the system user) is prohibi-
ted and results in an exclusion of liability.
Incorrect usage also occurs if the components in the
system are modified from their intended use (e.g.
through direct DHW heating in the collector).
Adhere to statutory regulations, especially concerning
the hygiene of potable water.
Intended use
5698367

6
Tiled roof cover and barrel roof tile cover
qQ
qP qW
5 8
9
7
1
120 x 40 60 x 40
2 3
8 x 120
4
qE
6 x 30
6
Fig. 1
1Timber
120 x 30 x 1600 mm
2Screws 8 x 120 mm
3Timber
48 x 30 x 1600 mm
4Front panel with lead flashing
5Mounting plate with butyl strip
6Zinc-plated chipboard screw (Spax-s) 6 x 30 mm
7Fixing clamp with butyl strip
8Retaining bracket
9Lower casing
qP Right casing with sealing strip
qQ Left casing with sealing strip
qW Upper casing with sealing strip
qE Nail
Components
5698367

7
Plain tile and slate roof cover
qQ
qP
qW
9
1
120 x 40
2
8 x 120
4
qR qT qZ qU
60 x 40
3 qE
6 x 30
6
5 87
6 x 30
6
Fig. 2
1Timber
120 x 30 x 1600 mm
2Screws 8 x 120 mm
3Timber
48 x 30 x 1600 mm
4Front panel with lead flashing
5Mounting plate with butyl strip
6Zinc-plated chipboard screw (Spax-s) 6 x 30 mm
7Fixing clamp with butyl strip
8Retaining bracket
9Lower casing
qP Right casing
qQ Left casing
qW Upper casing
qE Nail
qR Nocky panel, right
qT Nocky panel, right, trimmed
qZ Nocky panel, left
qU Nocky panel, left, trimmed
Uncovering the roof
Required roof area: 2900 x 1800 mm
■To prevent any damage to the ridge cover, allow suf-
ficient clearance on the ridge side; at least 3 rows for
tiled roof cover.
Note
With tiled roof cover, also maintain a width of at
least 3 tiles at the roof verges.
■If necessary, install a snow guard.
■Provide a roof hatch near the collectors for inspec-
tion and maintenance.
■Take additional measures on site to protect against
water penetration as a result of snow and wind pres-
sure, e.g. sarking membranes (accessories).
Fitting the timbers
Components
1Timber
120 x 30 x 1600 mm
2Screws 8 x 120 mm
3Timber
48 x 30 x 1600 mm
Components (cont.)
5698367

8
120
1A
720 - 840
1530 - 1650
3
1
1
2390
2
1
Fig. 3
AOn-site batten to support protruding timbers
■It may be necessary for existing battens to be
removed in the area taken up by the timbers.
Support the joint between the batten and the timber.
■Secure timbers along their entire length with 2
screws for every rafter.
Fitting the front panel
Components
4Front panel with lead flashing
5Mounting plate with butyl strip
6Zinc-plated chipboard screw (Spax-s) 6 x 30 mm
Fitting the timbers (cont.)
5698367

9
60
280
860
6 x 30
54 6
1.
2.
Fig. 4
Installing the collector
Components:
6Zinc-plated chipboard screw (Spax-s) 6 x 30 mm
7Fixing clamp with butyl strip
Fitting the front panel (cont.)
5698367

10
2.
6 x 30
7
6x
1.
6
210
Fig. 5
Fitting the lower casing and hydraulic connections
!Please note
The connection pipes must not show any signs
of damage.
Lubricate O-rings only with the special valve
grease provided.
Installing the collector (cont.)
5698367

11
Ø6
A
4.
B
3.
1.
2.
9
Fig. 6
AConnection, tee with sensor well for collector tem-
perature sensor (flow)
BConnection, tee (return)
Fitting the lower casing and hydraulic… (cont.)
5698367

12
2x
5.
5.
6.
Fig. 7
Fitting the collector temperature sensor
The collector temperature sensor is part of the stand-
ard delivery of the connection set.
1.
Fig. 8
Fitting the lower casing and hydraulic… (cont.)
5698367

13
3.
2.
Fig. 9
12
4.
5.
Fig. 10
7.
6.
Fig. 11
Fitting the lower casing and hydraulic… (cont.)
5698367

14
Components
8Retaining bracket
qP Right casing with sealing strip
qE Nail
qP
1. qE
8
2.
qQ
3.
Fig. 12 Push side casings to the edge of the collec-
tor.
Fitting the upper casing
Components
8Retaining bracket
qW Upper casing with sealing strip
qE Nail
Fitting the right and left casing
5698367

15
2.
8
qW
1.
qE
3
Fig. 13 Push upper casing to the edge of the collec-
tors.
Fitting the upper casing (cont.)
5698367

16
Tiled roof cover
A
Fig. 14
Trim the tiles to size or use half-sized tiles, as required.
Remove tile head A which rests on the side panel. !Please note
The diagonal sealing strip must be completely
hidden.
It may be necessary to trim the height of the
diagonal sealing strip with a knife.
Covering the roof
5698367

17
Barrel roof tile cover
2.
1.
Fig. 15
Slate and plain tile cover
Components
qR Nocky panel, right
qT Nocky panel, right, trimmed
qZ Nocky panel, left
qU Nocky panel, left, trimmed
1.
3.
qR
qT
qZ
4.
2.
Fig. 16
Covering the roof (cont.)
5698367

18
Note
The last Nocky panel in the top right is a left-hand one
(see page 7).
The last Nocky panel in the top left is a right-hand one
(see page 7).
Covering the collector array
Commission the solar thermal system as quickly as
possible once the collectors have been installed.
To reliably prevent steam hammer, the collectors must
be cold when filled. Cover the collector arrays.
In the delivered condition, the collectors are covered
with a protective film for this purpose. Remove this
protective film no later than 4 weeks following col-
lector installation.
Note
If commissioning takes place at a later date, cover the
collector arrays.
Do not use the protective foil provided to cover the col-
lectors!
Covering the roof (cont.)
5698367

19
!Please note
Incorrect installation can lead to collector dam-
age.
Use only gunmetal or brass fittings and copper
pipes for the installation.
Never step on the collectors.
Never solder on or near the collectors.
■Route pipes so that complete ventilation is ensured.
Install an air separator in the solar flow upstream of
the DHW cylinder.
Note
An air separator is integrated into the flow line of the
Solar-Divicon (see diagram).
■Braze or press fit the copper pipes in the solar cir-
cuit.
Soft solder could be weakened, particularly near the
collectors, due to the high temperatures that occur
there. Metal seal connections, locking ring fittings or
Viessmann plug-in connections with double O-rings
are the most suitable.
If other seals such as flat gaskets are used, ade-
quate glycol, pressure and temperature stability must
be guaranteed by the manufacturer.
■Design all connections to be resistant to pressure
and temperature (observe the maximum stagnation
temperature of the collector).
Never use:
–Teflon (inadequate glycol resistance)
–Hemp connections (insufficiently gas-tight)
■Equip the system to EN 12975 or EN ISO 9806 with
an expansion vessel, safety valve and circulation
pump.
■The expansion vessel must be approved to DIN
4807.
The diaphragms and seals of the expansion vessel
and safety valve must be suitable for the heat trans-
fer medium.
To calculate the pre-charge pressure, see the
"Vitosol" service instructions.
■For operation without a Solar-Divicon, use only
safety valves that meet the following conditions:
–Designed for 120 °C and up to 6 bar (0.6 MPa)
–Letter ID "S" (solar) in the component identification
Installation
5698367

20
P
O
A
K
M
NR
UL
G
B
C
H
EF
D
C
B
M
L
T
S
Fig. 17
ASolar-Divicon
BShut-off valves
CNon-return valves
DSolar circuit pump
EAir separator
FShut-off valve (adjusting screw above flow indica-
tor H)
GDrain valve
HFlow indicator
KFill valve
LStagnation heat sink
MExpansion vessel
NDrip pan
OCollector
RDHW cylinder
SCylinder temperature sensor
TCollector temperature sensor
USolar control unit
Installation (cont.)
5698367
Other manuals for VITOSOL-F
16
This manual suits for next models
1
Table of contents
Other Viessmann Inverter manuals
Popular Inverter manuals by other brands

BARRON
BARRON EXITRONIX Tucson Micro Series installation instructions

Baumer
Baumer HUBNER TDP 0,2 Series Mounting and operating instructions

electroil
electroil ITTPD11W-RS-BC Operation and Maintenance Handbook

Silicon Solar
Silicon Solar TPS555-1230 instruction manual

Mission Critical
Mission Critical Xantrex Freedom SW-RVC owner's guide

HP
HP 3312A Operating and service manual