
AUSTRALIA HONG KONG MALAYSIA NEW ZEALAND SINGAPORE UAE UNITED KINGDOM UNITED STATES
1. Trough
2. Paver or Concrete
3. Leveling material
4. Brackets for leveling
5. Power feed inlet
123 4 5 6
XTI 5.0 | INGROUND UPLIGHT CASE
1Identify contents
Instruction
Sheet
If
more
information
is
required
please
contact
your
local
representative
by
going
to
xerolighting.com/contacts or
email
us
at
headoffi[email protected]
INSTALLATION INSTRUCTION
22
22
Install case in suitable location making sure it is level
Maintain width of opening with supplied disposable
brackets - (Make sure the protective film is not removed
until luminaire installation takes place)
2
34
2
52
6
Ensure that the case is installed into a free draining
location with drainage material underneath
Install power feed cables - making sure that the
connections point is in an enclosure
Pave or finish groundworks
For installation of the
XTI | 5.0 Inground Uplight IP67 IK10+
please turn over page
locate the correct
case for each luminaire
2
2
7
Trough
Bracket pre-
attached to trough
disposable brackets
protective film
TOP VIEW
1
2
3
4
6. Drainage material 5
6
7. Drainage hole
7
Perform a drainage
test once case is
installed to ensure that water free drains.
Luminaire must not be immersed in water for more than 30 minutes