Installing the isolating switch
and cables.
Ameansfordisconnectioninallpoles
mustbeincorporatedinthexedwiring
inaccordancewithwiringregulations
• Ifmetalswitchboxesareused,earthing
regulations must be followed.
• Thecross-sectionalareaofthesupplycord
usedshouldberangedfrom1-1.5mm².
• C6S/C6R/C6PS/C6PR–2core,C6TS/
C6TR/C6HTS/C6HTR–3core.
• C6TS/C6TR/C6HTS/C6HTR.Awallor
ceilingOn/Oswitch(withindicatorlight)is
recommended
1.Checkthattheelectricalratingshowninside
theback-platematchesyourmainssupply.
2.Checktherearenoburiedpipesorcables
e.g.electricity,gas,waterbehindtheswitch
location(inthewallorabovetheceiling).Ifin
doubt,seekprofessionaladvice.
3.Isolatethemainssupply.
4.Layinthecablefromtheisolatingswitch
tothefanlocationviatheon/oswitch(if
required).
5.Layinthecablefromtheisolatingswitchto
thepointofconnectiontothemainssupply.
Warning: Do not make any
connections to the electrical supply
at this stage.
6. Installtheisolatingswitch
andon/oswitch(ifrequired).
7.Makeallconnectionswithintheisolating
switchandtheon/oswitch(ifrequired).
Wet Rooms: On/Off switch must
be situated so that it cannot be
touched by persons making use of
the bath or shower.
For Australia Only – C6S /C6R / C6PS / C6PR
Connectiontothesupplycanbemadebya
exible2-corecablecompletewith3pinplug
forinsertionintoanapproved10AGPOor
directlywiredthroughanapproved10Awall
mountedsurfaceswitchwithatleast3mm
clearancebetweencontacts.
For Australia Only – C6TS / C6TR / C6HTS / C6HTR
Thesemodelsarepermanentlyconnectedtothe
supplyandoperationiscontrolledbyaremote
switch.Theyshouldbedirectlywiredtothe
supplythroughanapproved10Awallmounted
surfaceswitchwithatleast3mmclearance
betweencontacts.
Preparing the Fan for installation.
1. Removethefrontcover/baeassemblyby
depressingthelatchontheundersideofthe
coverandpullingothefrontcover/bae
fromthebottom(SeeFigureC).
If working above ground floor
level, safety precautions must be
observed.
Mark the position of the back-plate
2. Holdtheback-platesothatthelevelline
markedonitisorientatedhorizontally.
3. Carefullyinsertthefantubeintothewall
duct.
4. Markonthewallthepositionsofthexing
holesintheback-plate.
5. Removethebackplatefromtheducting.
6. Drillscrewholesinthesepositionsif
necessary,andtwallplugsandscrewsas
required.Thefanmayalsobexedtoawall
tubeusingtheclampingbrackets.See9
below.
If installing in a ceiling, appropriate
termination ancillaries are required.
Follow instructions provided.
Mount the back-plate.
7. Feedthemainscablethroughthecable
entryholeinthebackplatetotheterminals.
8. Insertthefantubeoftheback-plateintothe
wallduct/ceilingasbefore.
9. Fastentheback-platetothewall/ceiling
usingappropriatefasteners.SeegureA.
10.Ifusingscrews,donotovertighten.Thefan
mayalsobexedtoawalltubeusingthe
clampingbrackets.Tightenthescrewsuntil
thefanisrmlysecuredtothetube–see
gureB.
Wire the electrical connections.
11.Makesurethemainssupplyisisolated.
Switchothemainselectricalsupplyand
removefuses.
12.Feedthecabletotheterminalblock.Wire
thefanasshowninFigureFusingthe
diagramappropriatetothefanmodel.
13.Connectthecablefromtheisolatingswitch
totheelectricalsupplywiring.
English