manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Alpha Outback Energy
  6. •
  7. Industrial Equipment
  8. •
  9. Alpha Outback Energy XM300HP User manual

Alpha Outback Energy XM300HP User manual

®
1
Pre-Service Connection Procedure
4. Connect the battery cables to the battery terminals
(connect temperature sensor ring lug to the Negative ( –)
battery terminal at this time) and the enclosure sensor
into the clip on the front edge of the Power Supply
shelf. Tighten the terminal hardware to the battery
manufacturer’s recommended torque settings.
5. Insert the (+) and ( –) power leads for the optional Local/
Remote Indicator (LRI) cable as indicated in Fig. 1.
Tighten to 7.0 lbf•in / 0.8Nm.
6. Make the following DM3 connections:
a. RF Cable to DM3 RF Connector. Tighten to 10in-lb ± 1in-lb
b. Environmental cable (e.g., PoE control, Battery heater
mat control)
c. Tamper switch cable into TPR connector
7. Connect the power leads from the SPI (network load) to
the Output 1 connector as indicated below; Black to ~,
White to N. Tighten to 7.0 lbf•in / 0.8Nm.
8. Connect an auxiliary load (e.g., fan) to the Output 2
connector (optional); Black to ~, White to N. Tighten to 7.0
lbf•in / 0.8Nm.
9. Turn on AC breaker (located on the enclosure) and verify
the correct (per unit’s nameplate voltage) utility voltage is
present at the outlet before plugging the XM3-200HP line
cord into the utility outlet.
Turn-Up and Test
1. Plug the XM2-300HP line cord into the utility outlet.
2. The power supply will perform a “display test” and verify
configuration for the power supply. After the initial display
test, a “No Batteries” alarm message appears in the Smart
Display because the battery switch is off. The green output
LED remains off and the red alarm LED continues to flash
while in this alarm state.
Connect the battery to the Battery Input connector.
4. Set the Inverter Module’s battery switch to the ON position
(1).
5. Verify no alarms are present (it may take up to 60 seconds
for alarms to clear).
6. Perform a self-test by simultaneously pressing the DOWN
arrow key and ENTER key. Wait for self-test completion
before proceeding. To manually exit self-test,
simultaneously press DOWN arrow and ENTER key.
7. Perform the live inverter test procedure:
a. Turn AC input breaker OFF.
b. Verify XM2-300HP transfers to “Inverter” mode.
c. Turn AC input breaker ON.
d. Verify XM2-300HP transfers back to utility.
8. Set the Service Power Inserter (SPI) toggle switch
to the ON position (Fig. 2).
9. Verify no alarms are present.
10. Secure the enclosure.
11. The unit is now in service. For additional information visit
www.alpha.com or www.alpha-outback-energy.com and
download the Technical Manual.
Quick Start Guide – Units Congured With DM3 Communications Modules
Fig. 1, Power Supply and DM3 Comm Module Connections
OUTPUT
ALARM
TEMP PROBE
BAT/ENCL
DUAL
BATTERY
INPUT
SPI
Aux. load
(optional)
Local/Remote
Indicator (LRI)
Battery Switch
ENV – Environmental
Connector
ETH – Ethernet Connector
TPR – Tamper
Switch Connector
RF Cable Connector
Battery Input Connector
Dual Battery/Enclosure
Temperature Sensor
Connector
ALT ON
SPI toggle switch
(verify correct position)
Fig. 2, Service Power
Inserter (SPI)
Line Cord
017-877-B0-001 Rev. B (08/2020)
1. Verify Service Power Inserter (SPI) toggle switch is set
to the ALT position (Fig. 2).
2. Verify the battery switch is set to the OFF position on
XM2-300HP (0).
3. Loosen the captive fasteners and remove the Inverter
Module from the chassis. On the DM3, locate and
examine J12 on the DM3 module to verify the jumper
connects pins 2 and 3 (see Fig. 5). After verification,
reinsert and secure the Inverter Module.
®
2
Pre-Service Connection Procedure
1. Verify Service Power Inserter (SPI) toggle switch is set to
the ALT position (Fig. 4).
2. Verify the battery switch is set to the OFF position on XM2-
300HP (0).
3. Connect the battery cables to the battery terminals
(connect temperature sensor ring lug to the Negative (–)
battery terminal at this time) and the enclosure sensor
into the clip on the front edge of the Power Supply
shelf. Tighten the terminal hardware to the battery
manufacturer’s recommended torque settings.
4. Insert the (+) and (–) power leads for the optional Local/
Remote Indicator (LRI) cable as indicated in Fig. 3.
Tighten to 7.0 lbf•in / 0.8Nm.
5. Make the following DPM connections:
a. RF Cable to DPM RF Connector. Tighten to 10in-lb ± 1in-lb
b. Environmental cable (e.g., PoE control, Battery heater
mat control)
c. Tamper switch cable into TPR connector
6. Connect the power leads from the SPI (network load) to
the Output 1 connector as indicated below; Black to ~,
White to N. Tighten to 7.0 lbf•in / 0.8Nm.
7. Connect an auxiliary load (e.g., fan) to the Output 2
connector (optional); Black to ~, White to N. Tighten to 7.0
lbf•in / 0.8Nm.
8. Turn on AC breaker (located on the enclosure) and verify
the correct (per unit’s nameplate voltage) utility voltage is
present at the outlet before plugging the XM3-200HP line
cord into the utility outlet.
Quick Start Guide – Units Congured With DPM Communications Modules
Turn-Up and Test
1. Plug the XM2-300HP line cord into the utility outlet.
2. The power supply will perform a “display test” and verify
configuration for the power supply. After the initial display
test, a “No Batteries” alarm message appears in the Smart
Display because the battery switch is off. The green output
LED remains off and the red alarm LED continues to flash
while in this alarm state.
3. Connect the battery to the Battery Input connector.
4. Set the Inverter Module’s battery switch to the ON position
(1).
5. Verify no alarms are present (it may take up to 60 seconds
for alarms to clear).
6. Perform a self-test by simultaneously pressing the DOWN
arrow key and ENTER key. Wait for self-test completion
before proceeding. To manually exit self-test,
simultaneously press DOWN arrow and ENTER key.
7. Perform the live inverter test procedure:
a. Turn AC input breaker OFF.
b. Verify XM2-300HP transfers to “Inverter” mode.
c. Turn AC input breaker ON.
d. Verify XM2-300HP transfers back to utility.
8. Set the Service Power Inserter (SPI) toggle switch
to the ON position (Fig. 4).
9. Verify no alarms are present.
10. Secure the enclosure.
11. The unit is now in service. For additional information visit
www.alpha.com or www.alpha-outback-energy.com and
download the Technical Manual.
OUTPUT
ALARM
DUAL
BAT/ENCL
TEMP PROBE
BATTERY
INPUT
Fig. 3, Power Supply and DPM Comm Module Connections
SPI
Aux. load
(optional)
Local/Remote
Indicator (LRI)
Battery Switch
ENV – Environmental
Connector
ETH – Ethernet Connector
TPR – Tamper Switch
Connector
RF Cable Connector
Battery Input Connector
Dual Battery/Enclosure
Temperature Sensor
Connector
ALT ON
SPI toggle switch
(verify correct position)
Fig. 4, Service Power
Inserter (SPI)
Line Cord
017-877-B0-001 Rev. B (08/2020)
®
3
017-877-B0-001 Rev. B (08/2020)
Reset Timing [J12]
Verify the jumper is in position 2 and 3 when using the DM3 Comm Module in
an XM2-300HP Power Supply.
1
2
3
XM3
XM2-300
J12
J12
J12
1
2
3
For general product information or customer service call: +49 9122 79889 0
Notice of FCC Compliance
Compliance and Support
Fig. 5, Location and setting of J12 on DM3
Verification of Jumper Settings on DM3
To confirm the correct DM3 Comm Module configuration for the XM2-300HP Power Supply, locate the Reset Timing Jumper
[J12]; verify pin shorting connector is set as indicated below.
Per FCC 47 CFR 15.21:
Changes or modifications not expressly approved by the party responsible for compliance could void the user’s authority to operate the
equipment.
Per FCC 47 CFR 15.105:
This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These
limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment.
This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction
manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful
interference in which case the user will be required to correct the interference at their own expense.
Product and Technical Support
®
017-877-B0-001 Rev. B (08/2020)
Worldwide Corporate Offices
Alpha and Outback Energy GmbH reserves the right to make changes to the products and information contained in this document without notice. Copyright © 2020 Alpha and Outback Energy GmbH. All
Rights reserved.
Headquarter Germany
Hansastrasse 8
D-91126 Schwabach
Tel: +49 9122 79889 0
Fax: +49 9122 79889 21
Mail: [email protected]
France and Benelux
[email protected]
Spain
[email protected]
For more information please visit www.alpha-outback-energy.com
Russia
[email protected]
Africa
[email protected]
Eastern Europe
[email protected]
Middle East
[email protected]

Popular Industrial Equipment manuals by other brands

Une ZHERO Quick installation guide

Une

Une ZHERO Quick installation guide

ABB HT570286 Operation manual

ABB

ABB HT570286 Operation manual

Rohde & Schwarz SpycerNode SC Getting started

Rohde & Schwarz

Rohde & Schwarz SpycerNode SC Getting started

NARGESA PP200 Instruction book

NARGESA

NARGESA PP200 Instruction book

Dungs MB DLE 055 D01 Installation, use and maintenance instructions

Dungs

Dungs MB DLE 055 D01 Installation, use and maintenance instructions

Ohio Medical Sure-Trap Overflow Safety Trap Instructions for use

Ohio Medical

Ohio Medical Sure-Trap Overflow Safety Trap Instructions for use

Rothenberger Super Ego Roscadora 2 Instructions for use

Rothenberger

Rothenberger Super Ego Roscadora 2 Instructions for use

Nidec LEROY-SOMER TAL 049 manual

Nidec

Nidec LEROY-SOMER TAL 049 manual

Festo DGE ZR-RF Series operating instructions

Festo

Festo DGE ZR-RF Series operating instructions

Stahl isPAC HART 9196 Series operating instructions

Stahl

Stahl isPAC HART 9196 Series operating instructions

SICK VMS4300 operating instructions

SICK

SICK VMS4300 operating instructions

ABB SafeRing XT Installation and operating instructions

ABB

ABB SafeRing XT Installation and operating instructions

EAE E-LINEKX manual

EAE

EAE E-LINEKX manual

Pfeiffer Vacuum XPT 200 PB Supplementary information

Pfeiffer Vacuum

Pfeiffer Vacuum XPT 200 PB Supplementary information

WPL GREASE GUZZLER Operation and maintenance manual

WPL

WPL GREASE GUZZLER Operation and maintenance manual

MICRO-EPSILON optoNCDT 1220 Assembly instructions

MICRO-EPSILON

MICRO-EPSILON optoNCDT 1220 Assembly instructions

Storch Airless ST 700 manual

Storch

Storch Airless ST 700 manual

ABB HT591617 Operation manual

ABB

ABB HT591617 Operation manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.