
INSTALLATION
1. Examine carton for damage
The freight carrier has assumed responsibility for its safe transit and delivery. If equipment is
receiveddamaged,eitherapparentorconcealed,aclaimmustbemadewithdeliveringcarrier.
a. Apparent damage or loss must be noted on the freight bill at the time of delivery.
The carrier representative (Driver) must sign the freight bill. If this is not done, the
carriermayrefusetheclaim.Thecarriercansupplythenecessaryforms.
b. Concealed damage or loss if not apparent until after the toaster is removed from
carton, a request for inspection must be made to the carrier within 15 days. The carrier
shouldarrangeaninspection.Besuretosaveallcontentsandpackagingmaterial.
2. VerifyParts
Afterremovingunitfromtheshippingcarton,unwrappingloosepartsandremoveanypackingtape,
plasticwrapandnylontie-down.Verifythefollowingparts:
Item Packaging Qty
Legs In plastic bag 4
Feeder/Bun Chute Wrapped, loose in top of carton 1
Conveyor In individual carton 1
Instruction Manual Loose in carton 1
Teflon Sheet Kit (optional) Loose in carton Optional
NOTE:PRIORTOINITIALSTART-UP,ALLREMOVABLEPARTSANDTHEGRILLSURFACESHOULD
BECLEANEDWITHWARMSOAPYWATERTOREMOVEMANUFACTURINGOILS,THENRINSED
AND DRIED THOROUGHLY.Apply oil (vegetable oil) to the conveyor chain after washing. (Bun oil can be
usedifitcontainsnoanimalfats,saltsordairyproducts).
3. AssembleLegs
Laythe toasteron its backand installthe four adjustablelegs intothethreaded holeson thebottom
of the toaster sides. Hand tighten the legs by gripping the black shank and turning until it is seated
firmly against the bottom of the toaster. Set the toaster upright on a flat surface. Unscrewing the
lower,chromeinsertofeach leglevels theunit. Flatsareprovidedontwo sidesof theinserttoallow
useofawrench.“Precise”levelingisnotrequiredforproperoperation.
4. ConveyorInstallation
Remove the front panel by lifting it
straight up. (See Figure 1) Lift
conveyor assembly by using “U”
shaped handles on each conveyor
side bracket. Lower the conveyor
into the two conveyor hanger
brackets above the grill plate on
each side, so the four spacers on
the sides of the conveyor rest on
the bottom flange and the bottom
spacers are against the adjustment
screws. The conveyor hanger
brackets are factory adjusted.
However, before reinstalling the
front panels apply power to the unit
and run the conveyor to insure
proper gear engagement. If gears
are not properly engaged, adjust
the conveyor by loosening the jam
nuts on the conveyor hanger
brackets and adjusting the screw
(seeFigure2)tosettheconveyorto
the correct height. Retighten lock
nutsafteradjustmentiscomplete.
3
FIGURE 1. M2000 ASSEMBLY DRAWING
Bottom
Front
Panel
Top Front Panel Feeder
Conveyor
Hanger
Main Power
Switch
Conveyor
Assembly
Butter Roller
Butter Pan