Bdcom P3310B User manual

BDCOM P3310B EPON Installation Manual

TableofContents
Table of Contents
Chapter 1 Introduction of BDCOM P3310B EPON Access Device......................................................................................1
1.1 Standard Configuration..........................................................................................................................................1
1.2Attribute Parameters of BDCOM P3310B EPON..................................................................................................4
1.3 ROHS Description.................................................................................................................................................5
Chapter 2 Installation Preparation........................................................................................................................................6
2.1 Cautions................................................................................................................................................................6
2.2 SafetyAdvice.........................................................................................................................................................6
2.2.1 Safety Principles........................................................................................................................................6
2.2.2 Safety Notices...........................................................................................................................................6
2.2.3 Safety Principles for Live Working.............................................................................................................7
2.2.4 Electrostatic Discharge Prevention...........................................................................................................8
2.3 Requirements for Common Locations...................................................................................................................8
2.3.1 Environment..............................................................................................................................................8
2.3.2 Location Configuration Prevention............................................................................................................8
2.3.3 Cabinet Configuration................................................................................................................................8
2.3.4 Power Requirements.................................................................................................................................9
2.4 Installation Tools and Device.................................................................................................................................9
Chapter 3 Installing BDCOM P3310B EPON Device.........................................................................................................10
3.1 Installation Flow of BDCOM P3310B EPON.......................................................................................................10
3.2 Installing the Machine Box of BDCOM P3310B EPON.......................................................................................10
3.2.1 Installing the Machine Box on the Desk..................................................................................................11
3.2.2 Installing the Chassis on the Cabinet......................................................................................................11
3.3 Connecting the Port.............................................................................................................................................11
3.3.1 Connecting the Console Port..................................................................................................................11
3.3.2 Connecting the EPON SFP Interface......................................................................................................13
3.3.3 Connecting Ethernet-1000M Optical Port................................................................................................14
3.3.4 Connecting the 1000M Ethernet Port......................................................................................................14
3.4 CheckingAfter Installation...................................................................................................................................16
Chapter 4 Maintaining the EPON Access Device...............................................................................................................17
4.1 Opening the Chassis...........................................................................................................................................17
4.2 Closing Chassis...................................................................................................................................................18
Chapter 5 Hardware Fault Analysis....................................................................................................................................19
5.1 Fault Separation..................................................................................................................................................19
5.1.1 Performing the Following Power-Source Steps.......................................................................................19
5.1.2 Faults Relative with Port, Cable and Connection....................................................................................19
5.2 Indicator Description............................................................................................................................................19
- I -

BDCOM P3310B EPON Installation Manual
Chapter 1 Introduction of BDCOM P3310B EPON
Access Device
The document describes the characteristics and parameters of BDCOM P3310B
EPON and gives an overview of BDCOM P3310B EPON.
1.1 Standard Configuration
BDCOM P3310B EPON has 4 EPON SFP ports, 2 GE optical/electric combo ports, 2
GE RJ45 electric ports, 2 GE SFP optical ports, 1 console port and 1 GE network
management port. For details, see the following table.
Table 1-1 Attributes of the necessary port
Port Attribute
Stands for the EPON port. EPON port, SFP port: having LINK/ACT indicators
1000M optical/electrical port
Electric port: 1000M rate, MDI/MDIX
auto-identification, UTP(RJ45) port and the
LINK/ACT indicators
SFP port: having LINK/ACT indicators
ETH Electric port: having the 100M rate and the
LINK/ACT indicators
Console port An RJ45 port with a rate of 9600 bps
Moreover, BDCOM P3310B EPON has two power-source sockets at its back terminal.
Figure 1-1 Front faceplate of BDCOM P3310B EPON
Table 1-2 Parts at the front faceplate of BDCOM P3310B EPON
No. Abbrev. Name Remarks
1 M/S Indicator of ring network The LED is on when it is the master
station and off when it is the
secondary station.
2 SYS LED of system’s running
If the indicator is always on, the
system is being started.
If the indicator flickers, the system
- 1 -

BDCOM P3310B EPON Installation Manual
works normally.
3 P2 LED of power source 2 When PWR2 supplies power, this LED
is on.
4 P1 LED of power source 1 When PWR1 supplies power, this LED
is on.
5,6 PON1,PON2,
PON3,PON4 Gigabit OLT PON port Realizes the access of EPON ONU.
7 PON2 LINK LED of PON2 LINK If this LED is on, it means that ONU is
connected.
8 PON2 ACT LED of PON2 ACT If this LED flickers, it means that the
data is being transmitted.
9 PON1 LINK LED of PON1 LINK If this LED is on, it means that ONU is
connected.
10 PON1 ACT LED of PON1 ACT If this LED flickers, it means that the
data is being transmitted.
11 PON4 LINK LED of PON4 LINK If this LED is on, it means that ONU is
connected.
12 PON4 ACT LED of PON4 ACT If this LED flickers, it means that the
data is being transmitted.
13 PON3 LINK LED of PON3 LINK If this LED is on, it means that ONU is
connected.
14 PON3 ACT LED of PON3 ACT If this LED flickers, it means that the
data is being transmitted.
15 G1,G2 Gigabit RJ45 electric port Forwards the gigabit-Ethernet
16 G2 Link/ACT LED of the G2 port
If the indicator is always on, the link on
the port is normal.
If the indicator flickers, the data is
received or transmitted through the
port.
17 G1 Link/ACT LED of the G1 port
If the indicator is always on, the link on
the port is normal.
If the indicator flickers, the data is
received or transmitted through the
port.
18 G3,G4 Gigabit SFP optical port Forwards the 1000M Ethernet optical
signals.
19 G4 Link/ACT LED of the G4 port
If the indicator is always on, the link on
the port is normal.
If the indicator flickers, the data is
received or transmitted through the
port.
20 G3 Link/ACT LED of the G3 port If the indicator is always on, the link on
- 2 -

BDCOM P3310B EPON Installation Manual
the port is normal.
If the indicator flickers, the data is
received or transmitted through the
port.
21 G5,G6 GE combo optical port Forwards the 1000M Ethernet optical
signals.
22 G5,G6 GE combo electric port Forwards the gigabit-Ethernet
electrical signals.
23 G6 Link/ACT LED of the G6 port
If the indicator is always on, the link on
the port is normal.
If the indicator flickers, the data is
24 G5 Link/ACT LED of the G5 port
If the indicator is always on, the link on
the port is normal.
If the indicator flickers, the data is
received or transmitted through the
port.
25 Console Console port Realizes the local management of the
EPON access device.
25 MGMT Network management
port Realizes the upgrade of the EPON
access device.
Figure 1-2 Back faceplate of BDCOM P3310B EPON
Table1-3 Parts at the Rear Faceplate of BDCOM P3310B EPON Access Device
No. Abbrev. Name Remarks
1 None AC power socket AC100-240V
2 None Power switch ON means opening the power,
while OFF means cutting off the
power.
3 None Grounding
column The grounding must be fine.
4
None Backup power
on-off
Pressing “ON” means opening
power, while pressing “OFF”
means cutting off the power. It is
used for backup power.
5 None
Standby AC
AC100 ~240V, used as the
- 3 -

BDCOM P3310B EPON Installation Manual
power socket backup power
1.2 Attribute Parameters of BDCOM P3310B EPON
IEEE 802.1d Spanning Tree Protocol
IEEE 802.1p Class of Service
IEEE 802.1q tagged VLAN
IEEE 802.3x Flow control
IEEE 802.3ad Link aggregation
Protocol standard
IEEE 802.3ah Ethernet in the First Mile Task Force
Standard of IP routing
protocol
RFC 1058 RIP
RFC 1723 RIP v2
RFC 1583 OSPF v2
Network management
standard
RFC 1157 SNMP v1/v2
RFC 1213 MIB II
RFC 1757 RMON 1,2,3,9
Memory EPROM: 512 Bytes
Flash Memory: 8M Bytes
SDRAM: 128MBytes
Standard configuration One Console port
1 gigabit network management port
2 gigabit electric/optical combo ports
2 gigabit electric ports
2 gigabit optical ports
4 gigabit PON ports
Specifications 442.50x315x44MM
Working
temperature/humidity 0℃-60℃; 10%-85% no condensation
Storage temperature/
humidity -40℃-80℃; 5%-95% no condensation
AC/DC power supply Input voltage: AC100-240V
Input frequency: 47-63Hz
Input current: 1A/230V
Power consumption Up to 48W
- 4 -

BDCOM P3310B EPON Installation Manual
1.3 ROHS Description
- 5 -

BDCOM P3310B EPON Installation Manual
Chapter 2 Installation Preparation
2.1 Cautions
Similar to other electronic products, the semiconductor chip easily gets damaged if you
power on and off abruptly and frequently. To restart up the switch of BDCOM P3310B
EPON, you have to open the power on-off three or five seconds after the power is cut
off.
Avoid severe collision or falling down from the height to protect the parts in BDCOM
P3310B EPON.
Use correct outside ports to connect BDCOM P3310B EPON. Do not insert the
Ethernet plug into the console port (RJ45 8-line socket). Similarly, do not insert the
console cable into the console port (RJ45 8-line socket).
Note:
1) When you plug or dial out the power line, keep the power line horizontal with the
power socket.
2) When the lifetime of our products ends, handle them according to national laws
and regulations, or send these products to our company for collective processing.
2.2 Safety Advice
2.2.1 Safety Principles
zKeep dustless and clean during or after the installation.
zPut the cover at the safe place.
zPut tools at the right place where they are not easily falling down.
zPut on relatively tight clothes, fasten the tie or scarf well and roll up the sleeve,
avoiding stumbling the chassis.
zPut on the protective glasses if the environment may cause damage to your
eyes.
zAvoid incorrect operations that may cause damage to human or devices.
2.2.2 Safety Notices
The safety notices mentioned here means that improper operation may lead to body
damage.
zRead the installation guide carefully before you operate the system.
- 6 -

BDCOM P3310B EPON Installation Manual
zOnly professionals are allowed to install or replace the EPON access device.
zPull out the AC power socket and close the direct-current power before
operating on the chassis or working beside the power source.
zThe final configuration of products must comply with relative national laws and
regulations.
2.2.3 Safety Principles for Live Working
When you work under electricity, following the following principles:
zPut off ornaments, such as ring, necklace, watch and bracelet, before you
operate under live working. When metal articles connect the power to the ground,
short circuit happens and components may be damaged.
zPull out the AC power socket and close the direct-current power before
operating on the chassis or working beside the power source.
zWhen the power is on, do not touch the power.
zCorrectly connect the device and the power socket.
zOnly professionals are allowed to operate and maintain the device.
zRead the installation guide carefully before the system is powered on.
Note:
1) Check potential dangers, such as the humid floor, ungrounded extensible power
line and tatty power line.
2) Install the emergent on-off at the working room for turning off the power when
trouble happens.
3) Turn off the power on-off of the EPON access device and plug off the power line
before installing or uninstalling the machine box or working beside the power.
4) Do not work alone if potential dangers exist.
5) Cut off the power before checkout.
6) If trouble happens, take the following measures:
A. Cut off the system’s power.
B. Alarm.
C. Take proper measures to help persons who are hit by the disaster. Artificial
respiration is needed if necessary.
D. Seek for medical help, or judge the loss and seek for available help.
- 7 -

BDCOM P3310B EPON Installation Manual
2.2.4 Electrostatic Discharge Prevention
Electrostatic discharge may damage devices and circuits. Improper treatment may
cause this device to malfunction completely or discontinuously.
Move or locate the devices according to the measures of electrostatic discharge
prevention, ensuring the chassis connects the ground. Another measure is to wear the
static-proof hand ring. If there is no hand ring, use the metal clip with the metal cable to
clip the unpainted metal part of the chassis. In this case, the static is discharged to the
ground through the metal cable of the clip. You can also discharge the static to the
ground through your body.
2.3 Requirements for Common Locations
This part describes the requirements for the installation locations.
2.3.1 Environment
The location of the chassis, cabinet planning and indoor cabling are very important for
normal system’s function. Short distance between devices, bad ventilation and
untouchable control plate will cause maintenance problems, systematic faulty and
breakdown.
For location planning and device locating, refer to section 2.3.2 “Location Configuration
Prevention”.
2.3.2 Location Configuration Prevention
The following preventive measures assist you to design the proper environment for this
EPON access device.
zMake sure that the workshop is well-ventilated, the heat of electrical devices is
well-discharged and sufficient air circulation is provided for device cooling.
zAvoid to damage devices by following the electrostatic discharge prevention
procedure.
zPut the chassis at the place where cool air can blow off the heat inside the
chassis. Make sure the chassis is sealed because the opened chassis will
reverse the cool air flow.
2.3.3 Cabinet Configuration
The following content assists you to make a proper cabinet configuration:
zEach device on the cabinet gives off heat when it runs. Therefore, the sealed
cabinet must have the heat-discharge outlet and the cooling fan. Do not put the
devices too close, avoiding bad ventilation.
zWhen you install the machine box at the open cabinet, prevent the frame of the
cabinet from blocking the airway of the machine box.
- 8 -

BDCOM P3310B EPON Installation Manual
zEnsure that nice ventilation is provided for the devices installed at the bottom of
the cabinet.
zThe clapboard separates exhaust gas and inflow air, and boost the cool air to
flow in the chassis. The best location of the clapboard is decided by the air flow
mode in the chassis, which can be obtained through different location tests.
2.3.4 Power Requirements
Make sure that the power supply has nice grounding and the power at the input side of
this EPON access device is reliable. The voltage control can be installed if necessary.
At least a 240 V, 10A fuse or a breaker is provided in the phase line if you prepare the
short-circuit prevention measures for a building.
Caution:
If the power supply system does not have good grounding, or the input power disturbs
too much and excessive pulses exist, the error code rate of communication devices
increases and even the hardware system will be damaged.
2.4 Installation Tools and Device
The tools and devices to install BDCOM P3310B EPON are not provided by the
BDCOM P3310B EPON. You yourself need to prepare them. The following are the
tools and devices needed for the typical installation of BDCOM P3310B EPON:
zScrewdriver
zStatic armguard
zBolt
zEthernet cable
zOther Ethernet terminal devices
zControl terminal
- 9 -

BDCOM P3310B EPON Installation Manual
Chapter 3 Installing BDCOM P3310B EPON Device
Caution:
Only professionals are allowed to install or replace the devices of this device.
3.1 Installation Flow of BDCOM P3310B EPON
3.2 Installing the Machine Box of BDCOM P3310B EPON
The machine box of BDCOM P3310B EPON can be installed on the desk or can be
fixed to other cabinets. Your network installation requirements can be met if you
conduct the operations according to the following procedure. It can be described in the
following two parts:
zInstalling the Machine Box on the Desk
zInstalling the Chassis on the Cabinet
- 10 -

BDCOM P3310B EPON Installation Manual
3.2.1 Installing the Machine Box on the Desk
BDCOM P3310B EPON can be directly put on the smooth and safe desk.
Note:
Do not put items with more than 4.5kg on BDCOM P3310BEPON, or it will be
damaged.
3.2.2 Installing the Chassis on the Cabinet
The machine box of BDCOM P3310B EPON is fixed on the cabinet through the
brackets. When you fix the brackets, the front faceplate of BDCOM P3310B EPON
faces forward. The detailed operations are shown in Figure 3-1.
Figure 3-1 Fixing the machine box of BDCOM P3310B EPON to the cabinet
After the brackets are installed, install the router on the cabinet. See the following
figure:
Figure 3-2 Installing the switch on the cabinet
3.3 Connecting the Port
3.3.1 Connecting the Console Port
BDCOM P3310B EPON has a Console port.
- 11 -

BDCOM P3310B EPON Installation Manual
The rate of the console port is a value ranging from 1200bps to 115200bps. It has a
standard RJ45 plug. After you connect the console port to the serial port of PC through
a console cable, you can configure and monitor BDCOM P3310B EPON by running a
terminal emulation software, such as super Windows terminal. The cable is provided
according to the host. The communication parameters of the terminal serial port can be
set to a rate of 9600bps, eight data bits, one stop bit, no sum check bit and traffic
control.
The RJ45 connector of the console port is shown in the following figure. The RJ45 plug
corresponds to the RJ45 socket, whose pins can be aligned from left to right with the
value from 1 to 8.
Figure 3-3 RJ-45 connector of the console port
Figure 3-4 Connecting the console port of BDCOM P3310B EPON and the computer
Table 3-1 Definition of the pins of the UTP port
No. Name Symbol Remarks
1 Carrier Detecting CD No connect
- 12 -

BDCOM P3310B EPON Installation Manual
2 Data receiving RXD Input
3 Data-line device ready DSR No connect
4 Data transmitting TXD Output
5 Transmission
requesting RTS No connect
6 Response transmitting CTS No connect
7 Data terminal ready DTR No connect
8 Signal ground SG GND
Note:
The console port of BDCOM P3310B EPON does not support traffic control. Therefore,
you must set the option data traffic control to none when you configure BDCOM
P3310B EPON with the super terminal. Otherwise, the single-pass problem will arise
on the super terminal.
Otherwise, the single-pass problem will arise on the super terminal. The cable is used
to connect the console port of BDCOM P3310B EPON and the outside console
terminal device. One end of the cable is a 8-pin RJ45 plug and the other end is a
9-hole plug (DB9). The RJ45 plug is put into the socket of the console port on BDCOM
P3310B EPON. The inner line connection in the cable is shown in figure 3-1. The
console cable is numbered as RLC0301.
Figure 3-5 Cable connection at the console port
3.3.2 Connecting the EPON SFP Interface
BDCOM P3310B EPON has 4 EPON SFP interfaces. The indicators lie in the right
side of these interfaces, indicating the LINK/ACT state. They are used to connect the
EPON access devices and other ONUs.
A single-mode SC optical fiber and an EPON optical module are needed for connect
BDCOM P3310B EPON and other ONUs.
- 13 -

BDCOM P3310B EPON Installation Manual
Figure 3-6 Connecting the EPON interface and other ONUs or optical splitters
3.3.3 Connecting Ethernet-1000M Optical Port
BDCOM P3310B EPON provides four 1000M optical SFP ports. Each port has a
corresponding indicator for showing the LINK/ACT state of the port. If the indicator is
always on, the port is normally linked; if the indicator flickers, the data is forwarded
through the port. To use the optical port, you need connect it to the SFP optical module,
and then to other Ethernet terminal devices through an optical fiber.
Figure 3-7 Connecting the 1000M optical port and other switches
3.3.4 Connecting the 1000M Ethernet Port
BDCOM P3310B EPON provides four fixed 1000M optical/electrical Ethernet port. The
indicators on the right side are LINK/ACT lights.
- 14 -

BDCOM P3310B EPON Installation Manual
To use the optical port, you need insert the SFP module to the port and then connect
other Ethernet devices through the optical fiber cable. If the port is inserted with the
SFP module, the corresponding electrical port cannot be used.
Figure 3-8 Connecting the 1000M optical port and other devices
To use the electrical port, you can connect the electric port and other Ethernet devices
with the direct-through or cross cable through the UTP port of the EPON access device.
In this case, the corresponding optical port cannot be used. The numbering order of
the pins in the UTP port is the same as the console port.
Figure 3-9 RJ-45 connector of the console port
Because 4 1000Base-T ports of BDCOM P3310B EPON support the MDI/MDIX
auto-identification of the cable, BDCOM P3310B EPON can adopt five classes of
direct-through/cross network cables when it connects other Ethernet terminals.
Table 3-3 Definition of the pins of the 1000M RJ45 port
No. Pin Name Symbol Remarks
1 Sending the normal phase
of the data TXD1+ Output
2 Sending the paraphase of
the data TXD1- Output
- 15 -

BDCOM P3310B EPON Installation Manual
3 Receiving the normal
phase of the data RXD1+ Input
4 Sending the normal phase
of the data TXD2+ Output
5 Sending the paraphase of
the data TXD2- Output
6 Receiving the paraphase
of the data RXD1- Input
7 Receiving the normal
phase of the data RXD2+ Input
8 Receiving the paraphase
of the data RXD1- Input
The direct-through or cross network cable has the function of auto-identification, so the
five classes of direct-through/cross network cables can be used to connect other
Ethernet devices.
3.4 Checking After Installation
After BDCOM P3310B EPON is installed, please conduct the following checkups
before it is powered.
zIf the EPON access device is installed on the cabinet, check whether the
installation point between the cabinet and the EPON access device is strong. If
the EPON access device is installed on the desk, check whether there is enough
space for the EPON access device to discharge its heat and whether the desk is
stable.
zCheck whether the connected power meets the power requirements of the
EPON access device.
zCheck whether the grounding line of the EPON access device is correctly
connected.
zCheck whether the EPON access device is correctly connected to other terminal
devices.
- 16 -

BDCOM P3310B EPON Installation Manual
Chapter 4 Maintaining the EPON Access Device
Caution:
1) Before opening the chassis, make sure that you have released the static you
carried and then turn off the power on-off of the EPON access device. Before
operating any step in Appendix B, read the section “SafetyAdvice”.
2) Before performing operations beside the power source or on the chassis, turn off
the power on-off and plug out the power cable.
4.1 Opening the Chassis
This section describes how to open the cover of the EPON access device, required
tools and operation methods.
Caution:
When the power cable still connects the power source, do not touch it.
When you open the cover the EPON access device, you may use the following tools:
These tools are:
zCrossed screwdriver
zStatic armguard
Perform the following steps to open the cover of the EPON access device.
(1) Turn off the power on-off of the EPON access device.
(2) Plug out all cables connected the back of EPON access device.
(3) Take out the bolt from the chassis with the screwdriver.
Note:
The chassis comprises of two parts: cover and bottom.
(4) Open the cover by holding two sides of the cover towards the direction of the
arrow key shown in the following figure:
(5) When the cover is opened, put it aside. The main board of the system appears.
- 17 -

BDCOM P3310B EPON Installation Manual
Note:
After taking off the cover, put it horizontally and avoid it to be crushed or collided.
Otherwise, the chassis is hard to install.
4.2 Closing Chassis
The section mainly describes how to put the cover and close the chassis. Do as
follows:
(1) Put them well according to their locations and joint them together along their
sides.
(2) See the following figure.
(3) When the cover and the bottom are closely tied, let the cover slide the slot of the
front template at the bottom.
(4) Nail the bolt and screw it tightly with the screwdriver.
(5) Reinstall the EPON access device on the cabinet or the desk.
(6) Reconnect all cables of the switch.
- 18 -
Table of contents
Other Bdcom Network Hardware manuals
Popular Network Hardware manuals by other brands

Barracuda
Barracuda Secure Connector quick start guide

IBM
IBM totalstorage 326 User reference

Amphenol
Amphenol C2LINX Series installation guide

Allied Telesis
Allied Telesis AT-SPFX/40 specification

Hanwha Techwin
Hanwha Techwin Wisenet QRN-420S quick guide

National Instruments
National Instruments WSN-3226 USER GUIDE AND SPECIFICATIONS