1 GENERAL INFORMATION
Dear Customer,
congratulations on your choice and thank you for placing 
your confidence in our products. With 
Power Plus Box 1001
 
you have chosen technology that is the very essence of 
energy saving and functionality.
Moreover, all Bproducts conform to the strictest 
directives and European standards in force.
This product was produced, amongst others, in conformity 
to the following directives and standards:
- Directive 2009/142/EC - Gas Appliances
- Directive 92/42/EEC on efficiency requirements 
and Annex E and Pres. Republic Decree n. 412, 26 
August 1993 (****)
- Electromagnetic Compatibility Directive 2004/108/EC
- Low Voltage Directive 2006/95/EC
- Ecodesign Directive 2009/125/CE for energy-related 
products
- Delegated Regulation (EU) N. 813/2013
- EN 15417 Gas-fired central heating boilers - Specific 
requirements for condensing boilers with a nominal 
heat input greater than 70 kW but not exceeding 
1000 kW 
- EN 13836 Gas fired central heating boilers - Type B 
boilers of nominal heat input exceeding 300 kW, but 
not exceeding 1000 kW.
The 
Power Plus Box 1001
 condensing modular systems 
moreover conform to the regulatory provisions pursuant to 
the INAIL “R” File, section R.3.B.
Bhas been certified with UNI EN ISO 9001/2000 since 
22.07.2004.
Power Plus Box 1001
 is furthermore a product having to its 
credit:
- European Conformity Mark (based on Directive 
92/42/CEE) issued by the authorized German 
certification organization ;
- Maximum energy efficiency class (according to 
Directive 92/42/EEC) identified by the symbol ****;
- Classified in the strictest class for nitrogen oxide-
related pollution (fifth grade according to UNI EN 
297)
- Patented heat exchanger.
2 WARNINGS
b The heating unit must be used for the purpose for 
which it was specifically designed and produced. Any 
whatsoever contractual or extra-contractual liabilities 
for damages caused to persons, animals or objects 
due to errors in installation, adjustment, maintenance 
and improper usage are to be excluded.
b Installation must fully comply with provisions of 
the law in force and instructions provided by the 
manufacturer to ensure safety and correct functioning, 
always calling upon professionally qualified technical 
personnel who will issue the declaration of conformity 
for the installation accomplished with good 
workmanship, in compliance to regulatory provisions 
in force and guidelines given in this handbook. The 
appliance must be installed in appropriate premises 
and together with the specific systems installed 
according to the law.
b Commissioning will be carried out by personnel from 
the authorized Technical Assistance Centre only and 
within 8 days from when the appliance was installed. 
After initial ignition the Technical Assistance Centre 
will fill in the warranty certificate, leaving the user their 
part to be kept, marking the beginning of the period 
of guarantee at the terms and conditions specified 
on the relative slip.
The appliance in its original packing 
may be exposed to temperatures between 4°C and 40°C. 
Do not expose the appliance to bad weather conditions 
after it has been unpacked, anyhow to temperatures 
below 4°C or above 40°C until it has been connected 
up to the water, gas and electricity mains so as to be 
able to activate the frost protection systems described in 
paragraph 6.2.6.
b
Check that the product is complete, undamaged 
and as ordered as soon as you receive it. Report any 
discrepancies or damage to the Bdealer who sold it.
b
In case of leaks, disconnect the heating unit from the 
mains, close the water from the mains and promptly 
contact the Technical Assistance Centre.
b
Regularly check that the condensate drain is free from 
obstruction.
b
Regularly check that the working pressure of the water 
circulation system, when cold, is below the maximum limit 
specified for the appliance. If not, contact the Technical 
Assistance Centre.
b
Maintenance jobs on the heating unit must be carried out 
by personnel from the authorized Technical Assistance 
Centre. Maintenance must be performed at least once a 
year. Correct maintenance is essential for safety as well 
as for the efficiency and long working life of the product. 
Proper maintenance keeps consumption and emissions 
down, and ensures that the product continues to operate 
reliably over time. Analyse the combustion fumes before 
commencing maintenance. The results of fume analysis 
can give a clear idea of what servicing or repairs are 
needed.
b
We recommend cleaning inside the exchanger once 
a year, extracting jet and burner and removing any 
installation debris by suction. This operation will be done 
by personnel from the Technical Assistance Centre only.
b
The warranty slip endorsed during the course of 
commissioning will have to be produced for any servicing 
required during the guarantee period. The manufacturer 
shall not be held liable for any damages caused by 
mishandling, improper use or errors in installation, use 
and maintenance work on the appliance. In the event 
of breakdown or malfunction switch off the appliance, 
avoiding to make any attempt to repair it and contact the 
Technical Assistance Centre.
b
This manual must be read carefully for the boiler to be 
used rationally and safely, and must be kept with care 
so as to be on hand where required by the technician or 
installer, to facilitate the appropriate installation, running 
and maintenance of the boiler. Bwill not be held 
liable for any translations possibly giving rise to wrong 
interpretation. This manual is an integral part of the 
heating unit and must consequently be kept with care 
and must ALWAYS accompany the boiler even when 
passed on to another owner or user or transferred to 
another installation. Ask the Technical Assistance Centre 
for another copy if it should be lost or damaged.