ECopyright Bravilor Bonamat B.V.
1.3 Start−up
1.3.1 Initialisation
The machine is switched on with the main switch.
On the LCD (Liquid Crystal Display) the following
appear in succession:
Dall symbols that the display can show.
Dthe version number of the software
(microprocessor) loaded from the factory.
Dthe version of the software table (Eeprom), also
loaded from the factory.
This process takes approx. 3 seconds and ends with
the steaming cup in the LCD display to show that
this phase has successfully finished.
1.3.2 Filling
The float tank and the boiler are connected by a
siphon hose. Together, they form a communicating
vessel. When the machine is switched on for the
first time, the float tank will be empty and the float
will be low.
DThe magnetic valve is opened and fills water in
the float tank with a speed of 3,5 litres per minute,
depending on the pressure.
DThe water in the float tank flows to the boiler
through the hose under the float tank.
DAfter the water level has pushed the float
upwards, the water level in the float tank is the
same as that of the boiler. The magnetic valve is
switched off.
DA signal sounds when the level of the float is
reached.
Please note:
Because the float tank is filled faster than the water
”drops” to the boiler, the filling process will be made
with short intervals.
1.3.3 Heating
After the system is completely filled with water,
element is switched on by means of a relay in the
machine.
The lower temperature sensor measures the current
temperature of the water. This ensures that the
water in the boiler is heated to the required final
temperature. The upper temperature sensor
releases the machine for dosing or not. The heating
is switched off when the pre−set temperature has
been reached.
Hot water has a lower specific weight than cold
water. As a result, the hot water in the boiler will not
want to flow back to the float tank through the
siphon hose at the bottom. That part of the system
will therefore remain cold. The latter is very
important because precisely the parts of the float
tank are sensitive for scale.
1.3.4 Dosing
Dosing is allowed when:
DThe float is in the top position.
DThe second temperature sensor measures a
temperature higher than the blocking
temperature.
DAfter a selection key is pressed, the pump motor
(fig.4 ) is driven for a certain time, depending on
the programmed amount, with a certain speed
(number of revolutions).
Fig. 4 Pump motor + rotor
DThe pump rotor rotates in the pump chamber,
which is filled with water. This is formed by the
bottom of the float tank and the underneath of the
pump housing (fig.5 ).
Fig. 5 Pump housing
DThe pump rotor pumps the water out of the pump
chamber, through the siphon hose in the bottom
of the boiler.
DAs a result, the hot water in the boiler is pushed
out of the boiler.
DThe float and the magnetic valve ensure that the
level in the float tank is maintained and that water
remains in the pump chamber.