2
Panel preparation and hardware installation
Panel height = Opening height - 37mm
3 panels: Panel width = (Opening width / 3) + 20mm (overlap)
No. 57
SILL
OPENING WIDTH (W)
30mm
OVERLAP
3 PANEL CONFIGURATION
30mm
OVERLAP
JAMB
JAMB
PANEL
WIDTH
(PW)
No. 50WR
WARDROBE
ROLLER
3.
1.
2.
Install panels as per numbered sequence below
45
DRILL Ø8
THROUGH
76
20
35
15
Machine slot and drill adjustment hole for No. 50WR Roller
C
L
No. 50G
GUIDE
170 15
15
PRE-
DRILL
Ø3 x 19
DEEP
Pre-drill holes for No. 50 Guide
Fitting soft close (optional)
Prepare panels for No. 50WR-C catch and No. 50G guide and fit components. Fit soft close into No. 55 head guide using fixings supplied.
Fitting panels
JAMB
1. SOFT CLOSE TO BE FITTED AGAINST JAMB
No. 58
HEAD GUIDE
JAMB
Soft close layout inside No. 58 head guide
A. B.
2. SCREW FIX
C.
A. B.
C. Catch of the
soft close faces
inward when
mounting
No. 50G
GUIDE
No. 50WR-C
CATCH
NOT PRIMED
PRIMED
C
L
170
15
15
DRILL Ø16.5
x 30 DEEP
PRE-
DRILL
Ø3 x 19
DEEP
C
L
JAMB
Prime soft
closes
before
installing
panels
Do not slide panel until rollers have been
adjusted down. Test panels.
OPTIONAL No. 50WR-S
SOFT CLOSE AND
No. 50WR-C CATCH
Adjust rollers up prior to installation.
1.
INSIDE
OUTSIDE
No. 50WR-C catch does not need to align
to No. 50WR-S soft close yet. Repeat the
process for the outside panel
3.
INSIDE
2.
INSIDE
1.
2.