ENGLISH OPERATION MANUAL V1.1
BRITEQ®4/13 BT-THEATRE 400TW
14.HANGING BRACKET: with a knob on both sides to fasten the unit in the desired
position. You can use the hole in the center of the bracket to fix a hook or truss clamp.
NOTE: for easy and fast alignment of the projectors the standard hanging
bracket can be replaced by the optionally available pole yoke.
(BT-THEATRE YOKE ~ order code: 6021).
15.LOCKING CLIP: The clip is used to keep the barndoor and color frame in place.
Press the clip aside to open it.
16.BARN DOORS: they facilitate shaping of the beam of light from the fixture, and
prevent the distinctive scatter of light created by the Fresnel lens from spilling into
areas where it is not wanted, such as the eyes of audience members. Just rotate the
barndoor leafs in the desired position.
OVERHEAD RIGGING
Important: The installation must be carried out by qualified service personal only. Improper installation
can result in serious injuries and/or damage to property. Overhead rigging requires extensive
experience! Working load limits should be respected, certified installation materials should be used,
the installed device should be inspected regularly for safety.
•Make sure the area below the installation place is free from unwanted persons during rigging, de-rigging
and servicing.
•Locate the fixture in a well-ventilated spot, far away from any flammable materials and/or liquids. The fixture
must be fixed at least 50cm from surrounding walls.
•The device should be installed out of reach of people and outside areas where persons
may walk by or be seated.
•Before rigging make sure that the installation area can hold a minimum point load of
10times the device’s weight.
•Always use a certified safety cable that can hold 12times the weight of the device when
installing the unit. This secondary safety attachment should be installed in a way that no
part of the installation can drop more than 20cm if the main attachment fails.
•The device should be well fixed; a free-swinging mounting is dangerous and may not be considered!
•Don’t cover any ventilation openings as this may result in overheating.
•The operator has to make sure that the safety-relating and machine-technical installations are approved by
an expert before using them for the first time. The installations should be inspected every year by a skilled
person to be sure that safety is still optimal.
SETUP MENU / HOW TO SETUP
With the setup menu you can fully configure the projector. All settings are preserved when the unit is
disconnected from the mains.
General instructions for setup.
The SETUP-menu has three logically structured levels, see the menu structure.
•Press the MENU button to enter the SETUP-menu.
•Press the ▲/▼ buttons to browse the different functions of the setup menu until the required function is
shown on the display.
•Press the ENTER button to access the function and change its parameters.
•Use ▲/▼ buttons to change the value.
•Press the ENTER button again confirm.
•To jump to a higher menu level: press the MENU button.
•To exit the SETUP-menu: press the MENU button several times until the standard display is shown.
Remark: to make things easier you will always enter the SETUP-menu at the last used location.
DMX-Address
Used to set the desired DMX-address. (on RDM-compatible controllers this option can be set remotely)
•Press the ▲/▼ buttons until the desired function is showing on the display.
•Press the ENTER button: the values can be changed
•Use ▲/▼ buttons to select the desired DMX512 address. The last occupied DMX-address is also shown:
makes it easier to set the address of the next unit in the chain.
•Once the correct address shows on the display, press the ENTER button to confirm.