Burg Wächter eBoxx A-625 User manual

www.burg.biz
en English 2
Step 1: Determination of the type of system required ......................................... 2
Step 2: Selection of the appropriate crossbar ......................................................... 2
Step 3: Planning the slot height of the letterboxes
in the system combination ............................................................................................. 3
Step 4: Drilling the boreholes specically for the
system being assembled ................................................................................................. 4
Step 5: System assembly ................................................................................................ 5
Step 5.1 Assembly of the system with Terzo posts ....................................... 6
Step 5.1.1 Pre-assembly of the system ...................................................... 6
Step 5.1.2 Drilling the Terzo post ................................................................. 6
Step 5.1.3 Assembly of the system with the Terzo posts
and optional crossbar ................................................................................... 10
Step 5.1.4 Assembly of the system with Terzo base
on a concrete foundation ............................................................................ 10
Step 5.1.5 Assembly of the system with Terzo posts
cast in concrete ................................................................................................ 11
Step 5.2 / 5.3 Floor mounting of the system ................................................. 11
Overview of assembly sets ........................................................................................... 11
BURG-WÄCHTER KG
Altenhofer Weg 15
58300 Wetter
Germany
System assembly instructions
Letterbox A-625
Language
Contents index

System assembly instructions | Letterbox A-625
2 I English
en Assembly instructions
Dear Customer,
The eBoxx A-letterbox modular system facilitates a modular assembly. The assembly is carried out using the
BURG-WÄCHTER Terzo posts. The Terzo posts can be cast in concrete or xed to a concrete foundation by means
of the BURG-WÄCHTER Terzo base.
The assembly instructions are to be read thoroughly prior to assembly. These assembly instructions will guide you
through the following steps:
Step 1: Determination of the type of system required
Step 2: Selection of the appropriate crossbar
Step 3: Planning the slot height of the letterboxes in the system combination
Step 4: Drilling the boreholes specically for the system being assembled
Step 5: System assembly
Table 1: Type of assembly
Note:
These instructions describe the assembly of a system with several letterboxes. To assemble a system consisting of A-boxes
and parcel boxes, follow the instructions in the relevant instructions. The number of letterboxes must not be less than
six vertically mounted A-boxes when installing the A-boxes in the system combination. Please select another model for
systems with less than 6 letterboxes.
Type of assembly Accessories required
Terzo stand assembly
Screwed onto concrete foundation
• 2 Terzo posts 170
• 2 Terzo bases
• 1 assembly set eBoxx system
• Optional: 1 Terzo T 760 or T 1140 crossbar
(if required for aesthetic reasons)
Terzo stand assembly
Cast in concrete
• 2 Terzo posts 170
• 1 assembly set eBoxx system
• Optional: 1 Terzo T 760 or T 1140 crossbar
(if required for aesthetic reasons)
Optional crossbars are available for assembly with several A-letterboxes mounted next to each other. These complement
the visual appearance of the system. Essentially, however, the systems listed here can be assembled without a crossbar.
Attention, not permitted:
• Vertical assembly of less than 6 A-boxes.
• More than three eBoxx A-letterboxes mounted next to each other.
An overview of the permitted A-box combinations is shown in Tables 3-5; Table 12 contains additional information and
images for the optional A-box combinations.
Table 2: Example application Terzo T 760/1140 crossbar (optional crossbars)
Step 2: Selection of the appropriate crossbar
Step 1: Determination of the type of system required
Lateral mounting of several eBoxx A-letterboxes
No crossbar No crossbar No crossbar
Optional: With Terzo T 760 crossbar Optional: With Terzo T 1140 crossbar
Multi-row assembly (min. 6 rows)

English I 3
System assembly instructions | Letterbox A-625
• According to DIN EN 13724, it is recommended that at least 30 % of letterbox locks should be installed at a height
of between 900 mm and 1300 mm for ergonomic and barrier-free design.
• The slot opening should be at an installation height of between 700 mm and 1700 mm, in exceptional cases
between 400 mm and 1800 mm.
The dimension ranges and access zones, derived from the above specications and recommendations,
are marked in the tables below as follows:
Permitted slot height: 400-1800 mm
Ideal slot height: 700-1700 mm
Permitted height of lock axis: 900-1300 mm
(at least 30% of all locks)
The following Tables 3-5 provide overviews for A-box system combinations.
Table 3: Overview of 1-column systems in stand constructions
Table 4: Overview of 2-column systems in stand constructions
Step 3: Planning the slot height of the letterboxes in the system combination
System assembly: 6-unit system BK-A-625 (6 rows, 1 column)
Terzo base V11-F Cast in concrete
System assembly: 8-unit system BK-A-625 (8 rows, 1 column)
Terzo base V11-F Cast in concrete
System assembly: 12-unit system BK-A-625 (6 rows, 2 columns)
Terzo base V11-F Cast in concrete

System assembly instructions | Letterbox A-625
4 I English
System assembly: 14-unit system BK-A-625 (7 rows, 2 columns)
Terzo base V11-F Cast in concrete
System assembly: 16-unit system BK-A-625 (8 rows, 2 columns)
Terzo base V11-F Cast in concrete
System assembly: 18-unit system BK-A-625 (6 rows, 3 columns)
Terzo base V11-F Cast in concrete
System assembly: 21-unit system BK-A-625 (7 rows, 3 columns) variant 1
Terzo base V11-F Cast in concrete
Table 5: Overview of 3-column systems in stand constructions

English I 5
System assembly instructions | Letterbox A-625
System assembly: 21-unit system BK-A-625 (7 rows, 3 columns) variant 2
Terzo base V11-F Cast in concrete
System assembly: 24-unit system BK-A-625 (8 rows, 3 columns)
Terzo base V11-F Cast in concrete
Not included Supplied with the letterboxes Application
Pre-drilling the system elements is required for all types of system assembly. Depending on the system combination
intended, the next step is to drill the boreholes in the A-letterboxes. The following tools are required for drilling
theboreholes.
Table 6: Tool for drilling the eBoxx A-letterboxes
The elastic ring supplied serves as scratch protection and should be placed on the drill bit during all drilling work on
the system. Refer to Table 7 for the drilling positions required for your system combination. For this purpose, the outer
surfaces of the letterboxes are supplied with centre points so that you can position the drill directly without slipping.
Note: Boreholes are already pre-drilled in the bottom of the A-letterboxes at the factory. Use the rubber plugs supplied
toclose these holes if no other letterboxes are to be mounted below the A-letterboxes.
Table 7: Required boreholes for assembly with other letterboxes
Step 4: Drilling the boreholes specically for the system being assembled
Ø6.0 mm
Combination Planned combination Required boreholes
A-letterbox
+
A-letterbox
(Vertical)
A-letterbox
+
A-letterbox
(Horizontal)
4x
2x

System assembly instructions | Letterbox A-6256 I English
Assembly set (see Appendix A)/
Tools
(Example: Assembly of two A-letterboxes
The system can be assembled once the individual system elements have been pre-drilled.
The assembly set supplied with the A-letterbox is required to assemble the system (see Table 8 and Appendix A)
Table8 illustrates the assembly set and the tools required. It provides an illustration of the assembly of an A-letterbox.
Allcombinations and connection points that have been pre-drilled in accordance with Step 4 or Table 7 are screwed
together in the same way.
Attention: First screw the letterboxes together vertically, i.e. one below the other. Then screw the letterboxes together
horizontally, i.e. sideways to each other.
Table 8: Assembly set for connecting the A-boxes.
Step 5: System assembly
Ø6.0 mm
Wrench size 8
T 25
4x
4x
8x
4x
The entire system must be pre-assembled for the installation of the system with Terzo posts, cast in concrete or screwed
on with Terzo bases. This assembly sequence must be observed.
Depending on the intended combination (Table 3 - 5) and after drilling the required boreholes in accordance with
Table7, the letterboxes must be screwed to a suitable underlay (cardboard or similar) using the mounting set supplied
(seeTable8). The underlay is to protect the system from scratches or other damage.
The following table illustrates how to pre-assemble a 24 A-box system.
Table 9: Pre-assembly of the system
The Terzo posts are pre-drilled for the use of self-tapping screws. For a system assembly with several A-boxes, some
boreholes must be enlarged so that the rivet nuts used for the system can be inserted. The following pages describe
which of the existing rows of boreholes R1-R24 on the Terzo post must be drilled out for the intended system using a
6.0mm drill. Table 11 provides an overview of the boreholes pre-drilled at the factory. Remember to slide the tube ring
onto your drill bit to prevent damage to the post when drilling.
Note: A 6.0 mm drill bit is required for drilling on the Terzo post and a 5.0 mm drill bit is required for drilling on the system
(A-letterbox).
Table 10: Tool for pre-drilling the Terzo posts for assembly in a system combination
Step 5.1: Assembly of the system with Terzo posts
Step 5.1.1: Pre-assembly of the system
Step 5.1.2: Drill Terzo posts
System before assembly Detailed view of screw connection System after assembly
4x
Not included Supplied with the A-boxes Application
Ø6.0 mm

English I 7
System assembly instructions | Letterbox A-625
Note: Only the R1 and R10 boreholes are relevant for a
system combination with A-boxes (without crossbar).
Table 11: Spacing of the factory drilled boreholes
Borehole row Dimension (mm)
R1 25
R2 164
R3 240.5
R4 315
R5 385
R6 430
R7 486
R8 545
R9 578
R10 601.5
R11 639
R12 660
R13 675
R14 693
R15 715
R16 775
R17 808
R18 1005
R19 1120
R20 1153
R21 1235
R22 1268
R23 1350
R24 1383
0
R1
R2
R3
R4
R5
R6
R7
R8
R9
R10
R11
R12
R13
R14
R15
R16
R17
R18
R19
R20
R21
R22
R23
R24
Table 12: Overview of the connection points between the intended system and the Terzo posts
System variant Terzo boreholes System boreholes
Ø5.0 mm
Ø5.0 mm
R1
R1
R10
R10
R1 & R10
System connection
R1 & R10
System connection
R1
R1
R10
R10
6-unit system (6 x 1)
(Terzo base
& set in concrete)
8-unit system (8 x 1)
(Terzo base
& set in concrete) Ø6.0 mm
Ø6.0 mm

System assembly instructions | Letterbox A-625
8 I English
System variant Terzo boreholes System boreholes System variant Terzo boreholes System boreholes
Ø5.0 mm Ø5.0 mm
Ø5.0 mm Ø5.0 mm
R1
R1
R1
R1
R10
R10
R10
R10
R1 & R10
System connection
R1 & R10
System connection
R1 & R10
System connection
12-unit system (6 x 2)
(Terzo base
& set in concrete)
Assembly without
crossbar
Assembly without
crossbar
Assembly without
crossbar
Assembly without
crossbar
Assembly with optional
Terzo T 760 crossbar
Assembly with optional
Terzo T 760 crossbar
Assembly with optional
Terzo T 760 crossbar
Assembly with optional
Terzo T 760 crossbar
14-unit system (7 x 2)
(cast in concrete)
14-unit system (7 x 2)
(Terzo base)
16-unit system (8 x 2)
(Terzo base
& set in concrete)
R1 R1
R1 R1
R10 R10
R10 R10
Ø6.0 mmØ6.0 mm
Ø6.0 mmØ6.0 mm
R12 & R14
Crossbar connection
R12 & R14
Crossbar connection
R16 & R17
Crossbar connection
R12
R14
R12
R14
R16
R17
R1 & R10
System connection
R16 & R17
Crossbar connection
R16
R17

English I 9
System assembly instructions | Letterbox A-625
System variant Terzo boreholes System boreholes
Ø5.0 mm
Ø5.0 mm
R1
R10
Assembly without
crossbar
Assembly without
crossbar
Assembly with optional
Terzo T 1140 crossbar
Assembly with optional
Terzo T 1140 crossbar
18-unit system (6 x 3)
(Terzo base & set in concrete)
21-unit system variant 1 (7 x 3)
(Terzo base & set in concrete)
R1
R1
R10
R10
System variant Terzo boreholes System boreholes
Ø5.0 mm
Ø5.0 mm
21-unit system variant 2 (7 x 3)
(Terzo base & set in concrete)
24-unit system variant 2 (8 x 3)
(Terzo base & set in concrete)
R1
R1
R10
R10
R1
R10
R1
R10
R1
R10
Assembly without
crossbar
Assembly without
crossbar
Assembly with optional
Terzo T 1140 crossbar
Assembly with optional
Terzo T 1140 crossbar
Ø6.0 mmØ6.0 mm
Ø6.0 mmØ6.0 mm
R1 & R10
System connection
R12 & R14
Crossbar connection
R12
R14
R1 & R10
System connection
R12 & R14
Crossbar connection
R12
R14
R1 & R10
System connection
R16 & R17
Crossbar connection
R16
R17
R1 & R10
System connection
R16 & R17
Crossbar connection
R16
R17

System assembly instructions | Letterbox A-625
10 I English
The assembly set shown in Table 13 and the corresponding tools are required to assemble the system with the
Terzoposts.
Table 13: Assembly set for connecting the system to the Terzo post
Complete the following steps to connect the pre-assembled
system and the crossbar to the Terzo post:
1. Hand-tighten the cylinder screw and rivet nuts on the
system and the crossbar. For this purpose, use the holes
drilled on the system and the Terzo post in accordance
with Table 12 in Step 5.1.2. Optionally, a crossbar can be
attached to a system in accordance with Table 12. In this
case, repeat these steps for the crossbar as well.
2. Place the pre-assembled system carefully on its upper surface. We recommend covering the oor with board/
cardboard beforehand to protect the system from scratches and damage. Screw the Terzo posts and, if installed,
thecrossbar to the system as shown. Tighten screws, be careful not to over-tighten!
Over-tightening can damage parts and considerably impair the retention force.
Note: The assembly is carried out with a crossbar in the illustrations below. If you do not want to use a crossbar,
please skip the corresponding steps.
When assembling the system with Terzo posts, it is essential to rst screw the system together and then t the Terzo posts
to the system.
• Continue to Step 5.1.4 to install the system with the optionally available Terzo bases on a concrete foundation.
• Continue to Step 5.1.5 to assemble the system by casting the Terzo posts in concrete.
The following steps refer to the assembly of the system using the optionally available Terzo bases, which connect the
system to a concrete foundation.
Plan an area of at least 500 x 500 mm for the concrete foundation with a depth of at least 800 mm for each Terzo post,
depending on the local frost threshold. The foundation size is to be increased depending on the local condition of the soil.
It is recommended to spread a layer of crushed stone underneath the concrete foundation. Backll the excavated area
with concrete and compress. Note the minimum period of time for the hardening of the concrete before the foundation
and the system is fully loaded. Concrete with a minimum compressive strength class of C25/30 is recommended.
Assembly of the system on an insecure foundation is not permitted. When laying the foundation, ensure that it is
horizontally level. Check the evenness of the foundation with a spirit level before assembly. If the foundations are
separated, also ensure that the levels are aligned with each other.
1. Mount the Terzo bases using the three M8 countersunk screws supplied:
2. Set up the system with at least two people. Do not lift/carry using the Terzo posts when setting up!
Note: Align the system vertically and horizontally using a spirit level.
Then mark three boreholes per base on the concrete foundation and place the system to one side again. Ensure that
the system cannot fall over, otherwise lay the system on its back wall again (on cardboard or similar). Drill the marked
holes at least 10 mm deeper than the dowel length. Insert the dowels so that they are ush with the surface.
3. Use at least two people to align the system over the drilled holes. Ensure that the system cannot be tilted or twisted.
Tighten both bases rmly using three of the M8 cylinder screws supplied.
Tighten the screws alternately to prevent tilting.
Step 5.1.3: Assembly of the system with the Terzo posts and optional crossbar Step 5.1.4: Assembly of the system with Terzo bases on a concrete foundation
Assembly set Necessary tools
8x 8x Wrench size 3 / M4
Crossbar (optional)A-letterbox
8x
Assembly set Necessary tools Assembly of the Terzo bases
with the Terzo post
3-4x
Ø12.0 mm
3x 3x 3x
3x 3x
PH 4
Wrench
size 6 /
M8
3x

English I 11
System assembly instructions | Letterbox A-625
Plan an area of at least 500 x 500 mm for the concrete foundation with a depth of at least 800 mm for each Terzo post,
depending on the local frost threshold. The foundation size is to be increased depending on the local condition of the soil.
The following tools are required:
According to step 5.1.3, the system must always
be cast in concrete after the entire system has
been pre-assembled. It is not permitted to rst
assemble the Terzo posts with the crossbar, set
them in concrete and then screw on the system.
It is recommended to spread a layer of crushed
stone underneath the concrete foundation.
Position the Terzo posts in the ground to a depth
of approx. 500 mm. Use stones if necessary and
align the system vertically and horizontally using
a spirit level as illustrated. Then provide sucient
support for the system. Backll the foundation
pit or hole with concrete and compress. Support
the system without clearance for the time the
concrete is hardening and safeguard it against
falling over. Note the minimum period of
time for the hardening of the concrete before
the system is fully loaded. Concrete with a
minimum compressive strength class of C25/30
isrecommended.
Step 5.1.5: Assembly of the system with Terzo posts - cast in concrete
Spirit level Bucket Stones/support material/gravel
Spirit level
Concrete
Stones
500 mm
Compressor
Appendix A: Overview of assembly sets
Assembly set Figure Intended use
• 5x screw M5 x 12 DIN 7985 TX25
stainless steel
• 5x cap nut M5 DIN 1587
stainlesssteel
• 10x washer 5.3 x 20 x 1.5 mm niro
• 4x rubber plugs
Connection of letterboxes; rubber plugs to close
the holes drilled in the base of the A-box at the
factory if no further A-boxes are mounted below
the respective A-box.
• 8x cylinder screw DIN 912
M4 x 16 (8.8)
• 8x washer 4.3 x 20 x 1.25 niro
• 8x blind rivet nut M4-TP-C
Connecting the system
with Terzo post
• 3x screw M8 x 60 DIN 7500 V2A
• 3x screw M8 x 60 DIN 6912 V2A
• 3x washer for M8 DIN 433 V2A
• 3x Dowel for M8 SLM8N
• 3x cover cap
Connection Terzo base
and Terzo post
• 8x cylinder screw DIN 912
M4 x 16 (8.8)
• 8x washer 4.3 x 20 x 1.25 niro
• 8x blind rivet nut M4-TP-C
Connection of the crossbar
with two Terzo posts
Scope of delivery
A-letterbox
Scope of delivery
Crossbar
5x 5x 10x
8x
8x
8x
8x
8x
8x
Accessories Assembly
set
A-letterbox
Scope of delivery
Terzo bases
Optional:
3x 3x 3x
3x 3x
4x

BURG-WÄCHTER KG
Altenhofer Weg 15
58300 Wetter
Germany
www.burg.biz
System assembly instructions | Letterbox A-625
BA System assembly instructions for letterbox A-625ENswi120124
www.burg.biz
Table of contents
Other Burg Wächter Postal Equipment manuals