JETRICH CANADA LTD: 3270 Orlando Dr, Mississauga, Ontario, L4V 1C6, CANADA
Thank you for purchasing the Chris & Chris Chef series kitchen work station.
With proper assembly, maintenance, and cleaning, your work station will give you many years of service.
NOTE: IF THERE ARE ANY PARTS MISSING; OR THERE IS SLIGHT
SHIPPING DAMAGE TO YOUR UNIT, DO NOT RETURN TO THE STORE.
PLEASE CONTACT OUR CUSTOMER SERVICE DEPT. FOR HELP, OR VISIT
OUR WEBSITE FOR FURTHER INFORMATION.
CUSTOMER SERVICE: TOLL FREE NUMBER: 1-800-569-4201
WEBSITE: www.aimcorpchas.com
ASSEMBLY TIPS: 1954/JET1225 JET1226 “PRO CHEF” WORK STATION
>Unpack all parts carefully>Cover work surface with bubble wrap from carton, or soft blanket so as not to
damage the unit or your work surface.
Step 1 >Lay top panel (A) upside down on stable surface.
>Install 4 large cam screws (Z) in the 4 threaded in top panel (A) holes using the Philips head allen key
(Zh) or screw driver.
>Slide the small side of the 4 “S” hooks (G) over the towel bar (F)
>Please note; at this time you can decide which side of top panel (A) you wish to mount the towel bar
>Insert the towel bar (F) into the 2 holes in the end of the top panel (A). insert 2 allen screws (W) to
>hold in place. >Put aside the top frame assembly
NOTE: BEFORE INSTALLING CAM LOCKS PART (Za) MAKE SURE TO BACK OUT THE SET SCREWS SO THAT
THE CHANNEL FOR THE CAM SCREW (Z) IS COMPLETELY CLEAR. FAILURE TO DO SO WILL MAKE IT
IMPOSSIBLE TO COMPLETE THE ASSEMBLY PROCESS AS EXPLAINED IN STEP 4 OF THE INSTRUCTIONS.
Step 2 >Install 4 large cam locks (Za) 2 into the large holes in side apron of left frame (BL) and 2 into the
right frame (BR)
>Make sure that the arrows on the cam locks face towards the cam screw holes in the top rail.
>Insert 2 large dowels (Zd) into the top rail of left frame (BL) and repeat for right frame (BR)
>Insert 1 dowel (Zd) in each end of drawer support beam (E).
>Inset 1 dowel (Z) in each end of both back support beams (D)
>Insert 2 dowels in each end of bottom wooden slat Shelf (C )
> Use a drop of glue (Zf)on each dowel (14 dowels for this step)
Step 3 >Lay right side frame (BR) down flat on work surface.
>Insert bottom shelf (C) into bottom holes in right frame (BR) using glue (Zf).
>Insert the 2 shelf support beams (D) into middle holes in right frame (BR) using glue (Zf)
>Insert under drawer beam (E) into the top holes in right frame (BR) using glue (Zf).