clivus multrum LOW PROFILE User manual

CLIVUS MULTRUM
LOW PROFILE
INSTRUCTION MANUAL
Scan QR code to find latest digital manual
IMCM-203-203.08.30
©Ecoflo Wastewater Management Pty Ltd

TABLE OF CONTENTS
SPECIFICATIONS 1
ITEMS REQUIRED (NOT INCLUDED) 2
TOOLS REQUIRED 2
SCHEMATICS 3
INSTALLATION 4
STEP 1: POSITION THE PEDESTAL 4
STEP 2: POSITION THE WASTE CHUTE 4
STEP 3: INSTALL THE WASTE CHUTE 6
STEP 4: INSTALL THE WHEELS 7
STEP 5: INSTALL THE IN-SERVICE CHAMBER 8
STEP 6: CONNECT THE VENT PIPE AND FAN 9
STEP 7: CONNECT THE FLEXIBLE VENT PIPE AND LIQUID DRAIN HOSE 10
OPTIONAL EXTRAS 11
HOW TO TURN THE MIXER 11
POWERING YOUR FAN 12
LEACHATE DRAIN 13
COMPOST ACCELERATORS 14
STARTING WITH AN EMPTY CHAMBER 15
OPERATION 16
MAINTENANCE 17
ROTATING THE CHAMBERS 18
TROUBLESHOOTING 20
PRODUCT & COMPONENT WARRANTY 22
MAINTENANCE SCHEDULE 23

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 1
SPECIFICATIONS
Chamber dimensions 630mm L x 740mm (incl. handles) W x 450mm H
Underfloor clearance required Minimum 500mm
Volume per chamber 60L active space
Chamber material Roto-moulded LDPE
Power usage 12V 5W Fan & transformer
Certification
SAI Global Certification / AS/NZS 1546.2:2008 On-site
domestic wastewater treatment units - Waterless
composting toilets. This model is approved in QLD, NSW, VIC,
ACT and WA. (The products are approved only if installed as
per the installation manual)
As soon as your order arrives, even if you are not planning to install for some time, please open and
check for any breakages, damage or shortages in your order.
All transit breakages must be reported within 7 days.
See back page for contact details.

ITEMS REQUIRED (NOT INCLUDED)
You will need the following items to complete your installation.
A vent kit and drain kit are available to purchase separately from Ecoflo.
Vent items
• Wall brackets to fix the vent pipe to the building
• A length of 100mm DWV vent pipe to connect to the air exhaust (length
depends on specific installation)
• Dektite if DWV vent pipe will penetrate the roof
Leachate drain items (please check with your local authority)
• Ø100mm Agricultural pipe
• 1.5m x 0.5m Synthetic or Hessian geotextile mat
• 50mm PVC pipe to connect the hose to the agricultural pipe
• 0.30m³ 20mm Aggregate
TOOLS REQUIRED
PVC
CEMENT
SILICONE
Marker Tape Measure Shovel Hand Saw
JigsawPlumb BobPVC CementCaulk Gun
Power Drill Philips Drill Bit Masonry and Brad
Point Drill Bits Hole Saw
Drill Bit

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 3
SCHEMATICS
If you are planning to excavate an area under the house for the compost
chambers, please ensure the area is well-drained and any retaining walls
are built to the satisfaction of the local authority.
Pedestal
Chute
Min. 500mm
Fan in housing
L.I.T Reducer
Vent pipe
Brackets*
*Not included in package
100mm DWV/Sewer pipe*
45° bend
Dektite*
600mm
600mm
Vent cowl
Camlock fittings
Excess liquid drain hose
Leachate drain*
In-service
chamber Out-of-service
chamber
Optional
Vent
Installation
* Not included in package.
A separate vent kit and drain kit are available to purchase from Ecoflo.

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 4
INSTALLATION
STEP 1: POSITION THE PEDESTAL
Locate the approximate area where you want the pedestal to go before cutting the hole.
The usual position for pedestals is centered between side walls.
NOTE: Due to the pedestals being man made, the distance to the center may vary from 245-255mm.
Please check before cutting the hole.
STEP 2: POSITION THE WASTE CHUTE
A 240mm hole must be cut in the toilet room floor to accommodate the waste chute.
1
Go to the underfloor area and look for
the hole you have drilled. Check to see if
there is a floor joist, water pipe or electrical
wiring under the area you are going to cut.
Following the provided pedestal floor template, mark the location of the centre hole 245-
255mm from the back wall. Drill a small hole.
Back wallSide wall

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 5
If there is a joist in the way, either reposition the waste hole OR install trimmer joists to each end
of the cut joist, and fix all connections with galvanized framing anchors with 4 nails each leg
(refer to diagram below).
View from under floor
2Following the pedestal floor template, draw a 240mm diameter circle. Cut out the hole with
a jigsaw.

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 6
STEP 3: INSTALL THE WASTE CHUTE
First ensure the pad or ground on which the ‘In-service’ chamber will reside is at its final level beneath
the toilet room. It is recommended to install a concrete pad/tiles for the chamber to sit on.
Insert the chute into the
hole
12
4
5 6
3
Slide the lid up the chute.
Cut off any excess chute length
20mm below the mark.
Seal and secure the chute to the
floor with silicone. Follow the separate pedestal
instruction sheet to install the
pedestal.
Place the chamber in position
and lower the lid. Mark where the
chute meets the hole in the lid.
20mm below

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 7
STEP 4: INSTALL THE WHEELS
Push the wheels onto the ends of the
axle until you hear them click.
Place the axle in position under the
chamber.

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 8
STEP 5: INSTALL THE IN-SERVICE CHAMBER
A brush or rubber seal is supplied for
the ‘In-service’ lid and acts as a seal
to prevent any odour emitting from
the chamber.
Add 50mm depth of bulking agent to
the chamber to create a bed. Slightly
dampen with water.
Slide the lid up onto the waste chute
from underneath.
Rotate the lid to lock the catch plates
onto the pins.
Place the chamber underneath the lid
and lower it onto the chamber.
Lock the toggle latches as shown below.
Place brush seal on inside surfaceof
chute extrusion as shown.
For rubber seal: Apply silicone to the inside of
the rubber seal and attach it around the rim
of the hole.
1
5
3
2
4
6
For brush seal: Remove the adhesive cover
and stick the brush seal around the inside
surface of the extrusion (see arrow).

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 9
STEP 6: CONNECT THE VENT PIPE AND FAN
The fan is IP68 rated so will not be effected by moisture.
Do not glue the fan housing to
the DWV fittings.
It is recommended that the
fan runs 24 hours a day to
continuously circulate air
through the compost heap.
Pedestal
Chute
Min. 500mm
Fan in housing
Y Juntion
L.I.T Reducer
Vent pipe
Brackets*
100mm DWV pipe*
45° bend
Dektite*
600mm
600mm
Vent cowl
Camlock fittings
Excess liquid drain hose
T-piece*
(3 way hose connector)
Leachate drain*
Out-of-service
chamber
In-service
chamber
Pedestal
Chute
Min. 500mm
Fan in housing
L.I.T Reducer
Vent pipe
Brackets*
*Not included in package
100mm DWV/Sewer pipe*
45° bend
Dektite*
600mm
600mm
Vent cowl
Camlock fittings
Excess liquid drain hose
Leachate drain*
In-service
chamber Out-of-service
chamber
Optional Installation
Air is drawn down the
toilet pedestal through the
compost chamber and out
the vent pipe.
Fan in housing
100mm Pipe (not included)
100mm Pipe (not included)
100-50mm L.I.T Reducer
Slotted Pipe Connector
Flexible Air Pipe

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 10
STEP 7: CONNECT THE FLEXIBLE VENT PIPE AND LIQUID DRAIN HOSE
Connect the flexible vent pipe (black) and liquid drain hose (purple) to the chambers.
1
2
Air vent outlet (See image 1)
Screw the threaded 50mm MI
connector into here. Then insert the
slotted pipe connector into the MI
connector.
Liquid drain outlet (See image 2)
MI Connector Slotted Pipe
Connector Flexible Vent Pipe
Female
Camlock
Nipple Male Barbed
Camlock Liquid Drain Hose
Dip the ends of the
vent pipe into hot
water for easier
insertion of the
pipe connectors.

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 11
100mm DWV vent kit:
• ø100mm DWV Pipes
• ø100mm DWV Slip Joiners
• ø100mm Stand Off Brackets
• Dektite
Extra chamber connection kit:
• Y junction
• Flexible vent pipe
• Pipe connectors
• Male camlock
• Sullage hose
• T-piece
OPTIONAL EXTRAS
These optional kits are available to purchase separately from Ecoflo Wastewater Management.
RingGear
Cog
Mixer Key
Mixer Rake
Crank handle for rotating the ring gear.
Simply place the hook in the eyelet, and turn
clockwise. Keep the crank level for easier
mixing.
HOW TO TURN THE MIXER
The compost mixer comes pre-assembled and installed in each chamber.

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 12
POWERING YOUR FAN
Mains Power
A 120 /12 volt regulated transformer is included to run the fan from mains power. The positive wire
the transformer is marked with a white line. The fan has anti-polarity protection and would not run if
connected incorrectly. If you have a solar panel, refer to the instructions provided with it.
Connect the fans to the transformer as follows:
1
3
5
2
4
6
Unscrew the fan housing cover.
Attach the transformer cables to the
terminal block as shown below.
Pull out the transport spacers.
Insert the fan and fan mesh into the
housing, with the fan mesh on top.
Screw fan cover back onto housing. Test the fan. Airflow should be directed
upwards, towards the top of the fan
housing (see arrow).
Black to black (negative)
Red to black with white stripe (positive)

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 13
LEACHATE DRAIN
A leachate drain kit (not including gravel) is available to purchase separately from Ecoflo Wastewater
Management.
Alternatively, if your council allows, you may wish to construct your own leachate drain. The liquid drain
hose should run into either a 50mm PVC pipe (drilled to allow liquid to escape) OR a length of socked
slotted Ag pipe, buried in an absorption trench as shown in the diagram below.
150mm
230mm
500mm
1200mm
Socked slotted pipe
230 min
150 min
500 min
Leachate drain
Gravel
Geofabric layer
300 min
150 min
450 min
20mm Gravel
ø100mm Agi Drain
Geofabric layer
agi Drain
Trench arch Drain

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 14
COMPOST ACCELERATORS
Whilst Clivus Multrum users report successful composting without the use of any additives, we strongly
recommend the use of the following items in order to optimize composting, particularly when the
toilet is in permanent use by more than two people.
Bulking agenT
When starting or restarting with an empty chamber, add a 50mm starter
bed of bulking agent.
This should be added on a regular basis, preferably a handful after each
solid use. Alternatively, if this is not possible, add the equivalent of this
on a daily or weekly basis. The bulking agent can be added through the
pedestal.
For best results use pine wood shavings or hemp bedding (available to
purchase from Ecoflo, or find at your local hardware or pet store).
We do NOT recommend the use of:
• Sawdust - as the small particles can create an anaerobic condition
within the chamber and small particles can disrupt ventilation.
• Cypress, cedar or eucalyptus wood shavings - due to their
antimicrobial properties.
• Sugar cane mulch - as it makes using the mixer difficult. Any excess
sugar leaching into the compost can attract bugs.
liquiD enzyMes
Enzymes are a natural detergent, not harmful to the culture of
microorganisms in the compost pile. The enzymes act as catalysts,
breaking down grime and mineral deposits into their basic elements, and
helping to accelerate the composting process. Any stain on the pedestal
can be removed with the solution. Refer to instructions on the bottle.
MicroBes
Microorganisms aka microbes are the ones doing the composting in your
toilet. Each microbe packet is full of aerobic microbes, actinomycetes
bacteria and fungi which combine with the natural bacteria in the waste
to convert it into nutritious fertile compost. Refer to instructions on packet.

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 15
STARTING WITH AN EMPTY CHAMBER
Before connecting your chamber to the waste chute, add an even 50mm layer of bulking
agent and dampen slightly with water. Complete the installation of the chamber (refer to
Step 5, Install the In-Service Chamber). You can start using your chamber now.
1
After 7 days of use, mix half a packet
of microbes with warm water in a
bowl. Add this to the chamber through
the pedestal. Reseal the packet and
store it at room temperature, out of
direct sunlight.
2Around 14 days later, add the rest of
the packet of microbes mixed with
warm water to the chamber through
the pedestal.
Your system is now fully activated with
live bacteria.
3
Repeat steps 1-3 each time you restart with an empty chamber.
4
50mm of
bulking agent Slightly dampen the
bulking agent with water.

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 16
AFTER EVERY LIQUID DEPOSIT
AFTER EVERY SOLID DEPOSIT
DO NOT DISPOSE INTO THE COMPOST CHAMBER
Close the lid
Throw in a generous
cup of bulking agent
Food waste
Spray 10 squirts of enzymes
around the bowl
Chemical products or
cleaning agents (including
disinfectants)
Close the lid
Sanitary products and
nappies
OPERATION

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 17
MAINTENANCE
Daily or weekly
• Clean rest room and toilet fixtures using only biodegradable cleaners (enzymes)
• Add 1 cup of bulking agent to toilet after every solid use
MonThly
• Inspect the ‘In-service’ chamber. Depending on usage, prepare an empty chamber for use once
the chamber becomes full (refer to Rotating the Chambers, page 18)
• Check vent pipe and remove any foreign matter
• Check the fan is operating
• Check that the system is draining correctly
• Remove and clean the fan and fan mesh. Ensure the fan is free of dust and moving easily
TiPs
• Carry a spare fan
• Periodically check your drain hose (aka excess liquids hose) for blockages. Wear protective
clothing and gloves. To check if there is any blockage around the drain outlet under the
perforated false floor, disconnect the drain hose from the chamber and pour hot water in the
chamber. To check if there is any blockage in the drain hose, pour hot water down the hose.
It is important to observe safety procedures when dealing with fresh human waste.
Please ensure you wear protective clothing (gloves and old clothes).
Do not attempt to move the chambers on your own.

©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30 18
ROTATING THE CHAMBERS
The chambers will need to be changed on a regular basis. A sufficient number of chambers must be
purchased to allow the ‘out-of-service’ chamber a minimum of 6 months to compost (depending on
the climate) from the time they are disconnected from the waste chute.
safeTy wear
When handling compost it is important protect yourself from exposure to any potential pathogens.
Wear safety materials such as gloves, long sleeves, goggles and a dust mask.
Optional: Remove dust plug
to drain excess liquids.
Disconnect the vent and drain system
from the chamber, and immediately
plug the liquid drain outlet with the
dust plug. Lift the in-service lid up the
chute and leave it there.
Remove the chamber from under
the floor. Place the lid of the empty
chamber onto the full chamber.
Add the 50mm pipe and vent to
the out-of-service chamber. We
recommend placing this chamber
in a warm, sunny position until it has
finished composting.
Pour a small bucket of bulking agent
down the pedestal to cover up the
waste pile before removing the full
chamber.
Add an even
50mm starter
bed of bulking
agent to the next
empty chamber
for in-service use.
2
4
3
1
Place the new in-service chamber
under the chute. Lower and lock the lid.
Connect the vent and drain system.
Tip: Tilt the chamber away
from the drain system before
disconnecting and then
inserting the dust plug.
MI
Connector Pipe
Connector Vent Cap
Table of contents
Other clivus multrum Plumbing Product manuals
Popular Plumbing Product manuals by other brands

Spectrum Brands
Spectrum Brands Pfister Rancho 8P8-WS2-RCH Quick installation guide

BELLOSTA
BELLOSTA bellini 6301/2/A Installation instruction

Black & Decker
Black & Decker Price Pfister 15 Series quick start guide

Luxart
Luxart Poydras PO411TO18 Installation

Pfister
Pfister Arlington F-049-AR Quick installation guide

Canvas
Canvas BROOKS 063-6341-2 Assembly instructions

Viega
Viega PureFlow Product instructions

Signature Hardware
Signature Hardware PENDLETON 949847 manual

Homewerks
Homewerks 16-U42WNCHB Assembly instructions

CANTERBURY
CANTERBURY Z2208--27 quick start guide

Viega
Viega 1078 Instructions for use

Franke
Franke SIRIUS ZSIRX0040 Installation and operating instructions